Loading...
bld201700253 Garland ADU Addition.pdf City of EdmondsBLD20170253 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.edmondswa.gov/ PUBLIC WORK DEPARTMENT Planning • Building • Engineering Plan Review Comments BLD20170253, 2017 PermitApplication:Date: #May19 th 10725 240Pl SW Project Name/Address: Garland/ADU Addition Tim Schlechttmschlecht@gmail.com Contact Person/Address, Fax or E-mail: Reviewer: Chris RiveraDivision: ENGINEERING During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts referred to in these comments can be accessed at our website: www.edmondswa.gov/under City Government / Development Services Department / Engineering Division then scroll down to Handouts: 1)Please add a note: Erosion control shall be provided to City of Edmonds standards. 2)Please add a note: Filter socks will be placed in catch basins within project vicinity as needed per Edmonds Standard Detail E1.3. 3)Please note: Any work pertaining to utility removal and/or relocating may require a separate permit. Please add a note:All disturbed soils will be compost amended. 4) Please add note: Stock piles shall be covered if not worked within 2 days wet season or 2 weeks dry 5) season. Please show the location where the silt fence is to be placed per E1.1. 6) Please show protection fencing at the drip line of the treesnear the project site that are to remain. 7) 8)Per Google’s street views there is currently a utility pole and tree in or near the location of the proposed parking space #3. To help clarify where the parking space will be located please make sure to provide the exact location of the utilitypole and the existing tree as requested below.Pleaseshow and provide the following for the proposed parking space #3. a). Showonthe site plan the exact location (proposed parking should be on private property) and size of the proposed parking spaceand placement of hard surface materials. b). C all out the proposed hard surface materials.Asphalt will only be allowed within the right of way. c).There shall be 3’ minimum separation of the proposed parking and the utility pole. Vegetation/plants shall separate the pole and the proposedparking. Please show trees to be removed throughout the site.Will the tree near the proposed parking space need 9) to be removed? Please show the existing location of the treenear the proposed parking space. DATE E-MAILED5/19/2017PAGE(1) City of EdmondsBLD20170253 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.edmondswa.gov/ PUBLIC WORK DEPARTMENT Planning • Building • Engineering Plan Review Comments Show the utility pole within the right of way near the proposed parking location, providing dimensions 10) from the property line to the south and from the right of way. Please show the location of the paved street in relation to the right of way/property line. 11) 12)The proposed trash enclosure shall notcreate a site distance issue for the proposed parking space.The trash enclosure shall be on private property and shall not exceed 3’ in height within 10’ of the right of way. 13)Gutters, downspouts and splashblocks are required, please provide on the site plan where downspouts will be placed. 14) Due to site location, a side sewer permit will need to be obtained from Olympic View Water & Sewer District (OVWSD) for the installation and inspections of the side sewer line. 15)Elevations for theproposed side sewer for the ADU need to be shown on the plans. Elevations where the proposed side sewer meetsthe existing side sewer for the homewill need to be shown.Side sewer minimum coverage is 2’. 16)A Right of Way Permit will be required for the use of the right of way.Attached is a right of way permit application. a).Please provide a traffic control plan with the Right of Way permit application. Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please contact me at425-771-0220 ext. 1339 or by email at chris.rivera@edmondswa.govif you have specific questions regarding these plan review comments. DATE E-MAILED5/19/2017PAGE(2)