bld20170031 - Therrell Pool - E2.pdf
CITY OF EDMONDS
PLAN REVIEW COMMENTS
ENGINEERING DIVISION
(425) 771-0220
City Website: www.edmondswa.gov
DATE:July 7, 2017
TO:Vitaliy Shavlovskiy
Victory Construction, LLC
vitaliys@ppas.com
FROM:Mitch Boyd,Stantec Consulting Services
Mitch.Boyd@edmondswa.gov
RE:Application #: BLD20170031
Project: Therrell –Pool/Spa
Project Address: 8609 Talbot Road
During review of the above noted application, it was found that the following information,
corrections, or clarifications are needed. Reviews by other divisions, such as Planning, Building, or
Fire may result in additional comments. Please submit two (2)sets of revised plans/documents
including a written response to each item below.
nd
Resubmittals can be made at the Development Services Department on the 2floor of City Hall.
Permit Center hours are M, T, Th & F from 8am-4:30pmand on Wednesdays from 8:30am-noon.
City of Edmonds handouts, standard details, application and other forms, and development code
may be referenced on the City website: www.edmondswa.govunder Services/Permits and
Development.
SITE PLAN
1)Infiltration trench A is too close to the property line.A minimum of 10’is required between
the edge ofthe infiltration trench and the property line.Please relocate or remove the
infiltration trench. Ensure no pool water is tributary to the neighbor’sproperty.