Loading...
bld20170031 - Therrell Pool - E2.pdf CITY OF EDMONDS PLAN REVIEW COMMENTS ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.gov DATE:July 7, 2017 TO:Vitaliy Shavlovskiy Victory Construction, LLC vitaliys@ppas.com FROM:Mitch Boyd,Stantec Consulting Services Mitch.Boyd@edmondswa.gov RE:Application #: BLD20170031 Project: Therrell –Pool/Spa Project Address: 8609 Talbot Road During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Reviews by other divisions, such as Planning, Building, or Fire may result in additional comments. Please submit two (2)sets of revised plans/documents including a written response to each item below. nd Resubmittals can be made at the Development Services Department on the 2floor of City Hall. Permit Center hours are M, T, Th & F from 8am-4:30pmand on Wednesdays from 8:30am-noon. City of Edmonds handouts, standard details, application and other forms, and development code may be referenced on the City website: www.edmondswa.govunder Services/Permits and Development. SITE PLAN 1)Infiltration trench A is too close to the property line.A minimum of 10’is required between the edge ofthe infiltration trench and the property line.Please relocate or remove the infiltration trench. Ensure no pool water is tributary to the neighbor’sproperty.