Loading...
BLD20170098_Echelbarger_E1.pdf CITY OF EDMONDS PLAN REVIEW COMMENTS ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.gov DATE:April 4, 2017 TO:Todd Echelbarger Echelbarger Investments, LLC todd@echelbarger.com FROM:Mitchell Boyd, StantecConsulting Services Mitchell.Boyd@stantec.com RE:Application #: BLD20170098 Project: Casper Lot 3 -Single Family Residence Project Address: 305 Caspers St During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Reviews by other divisions, such as Planning, Building, or Fire may result in additional comments. Please submit two (2)sets of revised plans/documents including a written response to each item below. nd Resubmittals can be made at the Development Services Department on the 2floor of City Hall. Permit Center hours are M, T, Th & F from 8am-4:30pmand on Wednesdays from 8:30am-noon. City of Edmonds handouts, standard details, application and other forms, and development code may be referenced on the City website: www.edmondswa.govunder Services/Permits and Development. GENERAL 1)Show and label the75’ wetland bufferongrading sheet. 2)Please show the driveway grading details. Include spot elevations at the garage entrance and driveway slopes. 3)Impervious calculations provided on the Residential Building Permit do not match the impervious calculations on the Stormwater and Utility Plan. Please provide updated impervious calculations. TESC 1)Add a note –Construction entrance to be removed/relocated prior to residences being occupied. 2)Please show and add a note to the plans that filter socks will be added to any catch basins downstream from the construction site.Please use filter socks on all catch basins located on Caspers St near the construction entrance. 3)Orange protective barrierfencing shall be placed around areas proposed for low impact development techniques, such asthe rain garden, to protect the area from compaction. WATER 1)As indicated by the Fire Department, a fire sprinkler system is required for this property. Typically if there is an existing water service line from the watermain to the meter,the water service line/meter will not be the appropriate size and a new tap will be required. The applicant will be required to pay for the new tap on the main and the new meter. a.Please add a note that a 1” meter is to be installed b.Please show a 1-1/2” water service line to be installed from the back of the meter to the house (as required for a combination fire and domestic service). c.Please label the pipe material and note tracer wire to be installed on the water service line. 2)Please add a note to the plans that all final restoration shall be completed by the contractor not the City of Edmonds. 3)Provide a note at all utility crossings indicating vertical clearance between utilities. Please note that if there is an elevationdifference of 0.5’or less between utilities, ethafoam will be required. SEWER 1)Provide invert elevations at the main, the cleanout at the property line and at the house so that a minimum 2% slopeand minimum 2’ pipe coveragecan be verified. If the slope of the pipe exceeds 20% the pipe will need to be anchored. 2)If a new sewer lateral is proposed and the connection will be core drilled, show the connection at the sewer main per City standards and with a Romac Inserta-tee. If the sewer connection will be cut in, please show a wye to be installed. DRY UTILITIES 1)Show all dry utilities and required utility separation. Please add a note that a minimum of 3’ separation is required between the dry utilities (power, gas, phone, cable, etc.) and sewer, water, and storm and 5’ from any City main lines. STORM 1)Impervious Areas chart: Provide a breakdown for all the impervious surfaces. Project Site Category: Category 2 Discharge location: Puget Sound viaShell Creek Type of areaSquare footageStormwater Facility Lawn and Landscape Roofs Hard surfaces 25% Retrofit 2)Show where the footing drains will discharge to(add callout, if applicable). 3)Provide footing drain IE elevationat the houseand pipe slope. 4)Per the architectural and engineering plans, it appears that stormwaterfrom the footing drain will not reach the raingarden via gravity. Please provide an updated invert elevation for the footing drain as well as an updated bottom elevation for the raingarden (if applicable). Page 2of 3 5)Please note that a minimum of 2’ of cover is required for all pipes locatedunder driveable surfaces and 1’ of cover under landscape areas. If the required depth cannot be achieved, indicate the storm drain pipe to be Ductile Iron. Ductile Iron requires 0.5’ of cover. 6)Provide anoteat all utility crossingsindicatingvertical clearance between utilities.Please note that if there is an elevationdifference of 0.5’ or less between utilities, ethafoam will be required. Page 3of 3