Loading...
BLD20170267 - Echelbarger - Engineering&Demo Comments 1.pdf CITY OF EDMONDS PLAN REVIEW COMMENTS ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.gov DATE:April 25, 2017 TO:Todd Echelbarger Echelbarger Investments Todd@echelbarger.com FROM:Mitch Boyd,Stantec ConsultingServices Mitch.Boyd@edmondswa.gov RE:Application #: BLD20170267/BLD20170269 Project: 1054 Walnut St-Single Family Residence/Demo Project Address: 1054 Walnut Street During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Reviews by other divisions, such as Planning, Building, or Fire may result in additional comments. Please submit two (2) sets of revised plans/documents including a written response to each item below. nd Resubmittals can be made at the Development Services Department on the 2floor of City Hall. Permit Center hours are M, T, Th & F from 8am-4:30pmand on Wednesdays from 8:30am-noon. City of Edmonds handouts, standard details, application and other forms, and development code may be referenced on the City website: www.edmondswa.govunder Services/Permits and Development. GENERAL 1)Submit Side Sewer Permit Applicationform 2)A Stormwater Covenant is required to be recorded against the property based on the proposed stormwater facilities for the project. Please complete the covenant, including notarization and any required exhibits and submit to the city. The document must be complete, but willnot be recorded prior to permit issuance. Prior to construction final location of facilities are to be verified (by field inspection and asbuilt) and then the covenant will be recorded. Please see the attached document. TESC/DEMO 1)Please show anadditional filter sock in the catch basin to the west of the property along Walnut Street. Per City of Edmonds GIS, the catch basin is downstream of the site and will receive construction stormwater runoff. 2)Orange protective barrierfencing shall be placed at the drip line of trees to remain and around the area proposed fortheinfiltration systemto protect the area from compaction. 3)The project is subject to the 2017 stormwater code. Please add Element #13 to the TESC BMP elements list. Describe how the project will implement Element #13. 4)If the existing side sewer is to be re-used, the line must be cut and capped a minimum of 20’ from existing and/or proposed foundation whichever is closest to the property line.Please add a note to the plans. 5)If the existing water service line is to be re-used, the line must be disconnected at the meter during construction. Please install a hose bib with an AVB at the meter during construction. Add a note to the plans. 6)Please update the title of the Grading and TESC plan to be Grading and TESC/DEMO plan. UTILITY/STORMWATER PLAN 1)Please correct the direction of flow between CB1 and the infiltration trench. 2)Revise the infiltration trench detail to provide a 1 ½ inch to 1 ¾ inch washed drain rock. 3)The roof/footing drain callout is unclear. Please relocate callout so it does not get lost in otherelements of theplan. 4)Ensure the maximum amount of driveway impervious surface area is tributary to the CB1. Add spot elevations around the drivewayto clarify drainage patternsif needed. 5)Please provide the IE of the footing drain and roof drain at the connection line to CB1. 6)Update the Vicinity Map. Currently only a black box occupies the map. 7)Please show the location of the infiltration trench observation well on the plan. 8)Please incorporate the standard details for sewer laterals and cleanouts (E6.2 and E6.4) 9)Please add a note that the existing side sewer will need to be TV’d by the contractor and video must be submitted to the City for review and approval to re-use. If the existing sewer lateral is proposedto be reused, the City’s Public Works Department 10) will need to TV the lateral to determine if it is acceptable to re-use. Add notes to the plans to contact Edmonds Public Works Sewer Division, 425-771-0235, to schedule inspection. 11)Add a note that a minimum of 3’ separation is required between the dry utilities (power, gas, phone, cable, etc.) and sewer, water, and storm and 5’ from any City main lines. 12)Please add a note to the plans that all final restoration shall be completed by the contractor not the City of Edmonds. STORMWATER REPORT The following comments are provided from Robert C. Edwards, PE, Stormwater Engineer. Please contact Robert directly at 425-771-0220 or by email at robert.edwards@edmondswa.govwith any specific questions you may have regarding these comments. Page 2of 3 Stormwater Review Date of Review: March 15, 2017 File/Address:BLD20170267 / 1054 Walnut Reviewer: Robert C. Edwards, PE, Stormwater Engineer, City of Edmonds Background This is classified as a Category 1 Small Site Project because it creates/adds impervious area more than 2,000 SF and less than 5,000 SF. Category 1 Small Site Projects are subject to Small Site Minimum Requirements 1, 2, 3, 4, and 5. Minimum Requirement #1 –Preparation of Stormwater Site Plan Comments: 1.The drainage report shall include a narrative of minimum requirements 1 through 5. 2.The WWHM model shall use the Puget East 36 rain gage data. (Use WSDOT data) 3.The WWHM model of the infiltration trench shall use a porosity of 0.30. 4.Provide details the storm drain pipes to CB#1. Include pipe diameter, material, type, inverts, and slopes. Minimum Requirement #2 –Construction Stormwater Pollution Plan Comments: 1.The SWPPP requirements for projects after 2016 are published in Volume II of the 2014 DOE manual. There are now 13 minimum elements. Additionally, the SWPPP shall have a narrative as required by the 2014 DOE manual. Minimum Requirement #3 –Source Control of Pollution Comments: N/A per SFR Minimum Requirement #4 –Preservation of Natural Drainage Systems Comments: N/A per LID Minimum Requirement #5 –Onsite Stormwater Management Comments: None Minimum Requirement #7 –Flow Control Comments: Flow control by LID Minimum Requirement #8 –Wetland Protection Comments: N/A Minimum Requirement #9 –Operation and Maintenance Comments: None Minimum Requirement #11 –Financial Liability Comments: N/A for SFR Page 3of 3