Loading...
BLD20170352_Petschl_ENG1-4.12.17.pdf CITY OF EDMONDS CIVIL PLAN REVIEW COMMENTS ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.gov DATE: April 12, 2017 TO: Larry Cross–Cross 2 Design Group lcross@cross2dg.com FROM: Mitch Boyd @edmondswa.gov Mitch.Boyd RE: Application #: bld20170352 Project: PetschlResidenceRemodel andAddition Project Address: 751 Northstream Lane During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Reviews by other divisions, such as Planning, Building, or Fire may result in additional comments. Please redline plans or submit three (3) sets of revised plans/documents with a written response to each of the items below to a permit coordinator. nd Resubmittals can be made at the Development Services Department on the 2floor of City Hall. Permit Center hours are M, T, Th & F from 8am-4:30pm and on Wednesdays from 8:30am-noon. City of Edmonds handouts, standard details and development code can be referenced on the City website. SITE PLAN 1.Provide TESC standard details(can be found on the City Website) that will be used on the site. Includesilt fence, CB inserts, covered stockpiles,construction entrance,etc.Show location of erosion control measures on the site plan. 2.Add note:Install and maintain all TESC measures according to approved plans, City of Edmonds standard details, and all other measures that may be required during construction. 3.Add note: “Disturbed areas to be compost amendedper DOE standarddetail BMP T5.13.”