Loading...
BLD20170418-Weber-E2.pdf CITY OF EDMONDS PLAN REVIEW COMMENTS ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.gov May 11, 2017 DATE: April 25, 2017 TO:Raymond and Cherie Weber nd 23329 92Ave W, Edmonds, WA 98020 FROM:Mitch Boyd,Stantec Engineering Services Mitch.Boyd@edmondswa.gov RE:Application #: BLD20170418 Project: Weber-Single Family Residence nd Project Address: 23325 92Ave W During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Reviews by other divisions, such as Planning, Building, or Fire may result in additional comments. Please submit two (2)sets of revised plans/documents including a written response to each item below. nd Resubmittals can be made at the Development Services Department on the 2floor of City Hall. Permit Center hours are M, T, Th & F from 8am-4:30pmand on Wednesdays from 8:30am-noon. City of Edmonds handouts, standard details, application and other forms, and development code may be referenced on the City website: www.edmondswa.govunder Services/Permits and Development. All comments in bold were created on May 11, 2017. GENERAL OK 1) Include a City Engineering Division approval block on all plan sheets. Refer to sample on City website. OK 2) Include construction sequence. Refer to sample on City website. OK 3) Include General Construction Notes. Refer to sample on City website. EROSION CONTROL PLAN OK 1) Standard plans for erosion control are referenced. Please include the standard plans. The note below was not found on the plan. Please add the note to the plans. 2) Please add a note to the plans that all disturbed soils will be compost amendedper BMP T5.13. OK 3) Please provide the location of the temporary stockpile. Add a note that the stockpile is to be covered within 24 hours. UTILITY PLAN OK 1) Pleaseadd anotethat tracer wire is to be installed on the water service line. OK –No landscape irrigation backflow assembly will be installed. 2) Add a note to the plans indicating where the landscape irrigation backflow assembly will be located (if one is proposed). OK 3) Please note that a minimum of 2’ of cover is required for all pipes locatedunder driveable surfaces and 1’ of cover under landscape areas.Currently, the storm lines have less than 1’ of cover (approximately 2” near CB#4). Ensure all utilities have their appropriate cover. OK 4) Verify the existing stormwater detention system is in good condition.Provide maintenance if required. OK 5) Please straighten the sewer line.Include 45°or 90°bends if sewer trajectory needs to be adjusted. OK 6) Show a 6” cleanout at the edge of easement or replace sewer stub with a cleanout. Please add a note that the 6” cleanout at the property line shall have a 12” cast iron lamphole cover with ½” hexbolts. OK 7) Show a cleanout located within 2’ of the house, at any 90° bend, and when there is less than 3’ between two 45° bends. OK 8) Please include the standard detail for sewer laterals and sewer cleanouts in the plans (Standard Plan E6.2 and E6.4). OK 9) Show all dry utilities and required utility separation. Please add a note that a minimum of 3’ separation is required between the dry utilities (power, gas, phone, cable, etc.). The minimum horizontal clearance between storm and sewer is 5 feet, between storm and water is 5feet,and between sewer and water is 10feet. Page 2of 3 OK 10) Please provide crossing information for all utilities. Include the invert elevations and total vertical clearance. Please note that for any utility that crosses with less than 0.5 feet of vertical clearance, ethafoam is required. OK 11) The power/cable lineandthe footing drain currently intersect with Yard Drain 1. Provide a detail showing vertical clearance between the utilities and the yard drain or relocate the power/cable and/or footing drainlines. Please add the City of Edmonds standard detail E8.9 to the plans. 12) Please show the discharge location of the rockeryfooting drains. If the rockery footing drains connect into the proposed structure footing drains, add a note to the plans. Include standard plan E8.9on the plans. OK 13) Please add a note to the plans that all final restoration shall be completed by the contractor not the City of Edmonds. 14)As indicated by the Fire Department, a fire sprinkler system is required for this property. Confirm the water service line from the watermain to the meter and the water service line/meter is the correct size. Otherwise,a new tap will be required. The applicant will be required to pay for the new tap on the main and the new meter. a.Please callout the water meter size. The water meter is to be a 1” meter. b.Please show a 1-1/2” water service line to be installed from the back of the meter to the house (as required for a combination fire and domestic service). c.Update water crossing information to account for the extra 0.5”pipe diameter. Page 3of 3