Loading...
BLD20170463 - Pool - Addition - E1.pdf CITY OF EDMONDS PLAN REVIEW COMMENTS ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.gov DATE:May 10, 2017 TO:Dennis and Susan Pool archimama@msn.com FROM:Mitch Boyd, StantecConsulting Services Mitch.Boyd@edmondswa.gov RE:Application #: BLD20170463 Project: Pool-Addition Project Address: 8527 Madrona Lane During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Reviews by other divisions, such as Planning, Building, or Fire may result in additional comments. Please submit two (2)sets of revised plans/documents including a written response to each item below. nd Resubmittals can be made at the Development Services Department on the 2floor of City Hall. Permit Center hours are M, T, Th & F from 8am-4:30pmand on Wednesdays from 8:30am-noon. City of Edmonds handouts, standard details, application and other forms, and development code may be referenced on the City website: www.edmondswa.govunder Services/Permits and Development. SITE PLAN 1)Include construction sequence. Refer to sample on City website. 2)Include General Construction Notes. Refer to sample on City website. 3)All utilities should be shown from the city main line/lateral to the structure. Please show the location of the existing water service, sewer service, and any dry utility services. 4)Show filter fence on the plans and incorporate and referenceCity standard detail E1.1. 5)Show construction entranceon the plans and incorporate and referenceCitystandard detail E1.2. 6)Please show and add a note to the plans that filter socks will be added to any catch basins downstream from the construction site.Incorporate and reference City standard detail E1.3. 7)Please provide the location of the temporary stockpile. Add a note that the stockpile is to be covered within 24 hours. 8)Add note: Install and maintain all TESC measures according to approved plans, City of Edmonds standard details, and all other measures that may be required during construction.