CITY OF EDMONDS
PLAN REVIEW COMMENTS
ENGINEERING DIVISION
(425) 771-0220
City Website: www.edmondswa.gov
DATE:May 16, 2017
TO:Kyle Bannister
BHDConstruction
Kdbannister13@gmail.com
FROM:Mitch Boyd,Stantec Consulting Services
Mitch.Boyd@edmondswa.gov
RE:Application #: BLD20170578
Project: Somers -Deck
Project Address: 744 Elm Pl W
During review of the above noted application, it was found that the following information,
corrections, or clarifications are needed. Reviews by other divisions, such as Planning, Building, or
Fire may result in additional comments. Please submit two (2)sets of revised plans/documents
including a written response to each item below.
nd
Resubmittals can be made at the Development Services Department on the 2floor of City Hall.
Permit Center hours are M, T, Th & F from 8am-4:30pmand on Wednesdays from 8:30am-noon.
City of Edmonds handouts, standard details, application and other forms, and development code
may be referenced on the City website: www.edmondswa.govunder Services/Permits and
Development.
GENERAL
1)The deck will be located withinand/or adjacent toa severe erosion hazard zoneand will
require a geotechnical report. The deck will need to comply with geotechnical
recommendations.
2)Will the deck be slotted(pervious)or impervious? Please add a callout to the plans
indicating deck type. If the deck is impervious, please indicate the deck slope.
SITE PLAN
1)Include construction sequence. Refer to sample on City website.
2)Include General Construction Notes. Refer to sample on City website.
3)Show filter fence on the plans and incorporate and referenceCity standard detail E1.1.
4)Show construction entranceon the plans and incorporate and referenceCity standard detail
E1.2.The existing driveway may be used as a construction entrance. If this is the case,
please elaborate on how construction stormwater will be mitigated.
5)Please add a note to theplans that all disturbed soils will be compost amendedper BMP
T5.13.
6)Please note: additional comments not included in this reviewmay be produced after
.
reviewing the next submittal