Loading...
BLD20170587 - Munson Addition - E1.pdf CITY OF EDMONDS PLAN REVIEW COMMENTS ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.gov DATE:May 30, 2017 TO:Keith Munson Muns0864@yahoo.com FROM:Mitch Boyd, Stantec Consulting Services Mitch.Boyd@edmondswa.gov RE:Application #: BLD20170587 Project: Munson Addition Project Address: 7410 McAleer Way During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Reviews by other divisions, such as Planning, Building, or Fire may result in additional comments. Please submit two (2)sets of revised plans/documents including a written response to each item below. nd Resubmittals can be made at the Development Services Department on the 2floor of City Hall. Permit Center hours are M, T, Th & F from 8am-4:30pmand on Wednesdays from 8:30am-noon. City of Edmonds handouts, standard details, application and other forms, and development code may be referenced on the City website: www.edmondswa.govunder Services/Permits and Development. SITE PLAN 1)Show filter fence on the plans and incorporate and referenceCity standard detail E1.1. 2)Show construction entranceon the plans and incorporate and referenceCity standard detail E1.2. 3)Please show and add a note to the plans that filter socks will be added to any catch basins downstream from the construction site.Incorporate and reference City standard detail E1.3. 4)Please add a note to theplans that all disturbed soils will be compost amendedper BMP T5.13. 5)Add note: Install and maintain all TESC measures according to approved plans, City of Edmonds standard details, and all other measures that may be required during construction.