Loading...
BLD20171154of E Mo�� 4C.1 CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 oPHONE: (425) 771-0220 -FAX: (425) 771-0221 °S9 i STATUS: ISSUED 09/11/2017 Permit #: BLD20171154 BUILDING ' Expiration Date: 09/11/2018 Project Address: 21819 93RD PL W, EDMONDS Parcel No: 00547600000900 I . , N. , 1,1.. . • 1 I AXS INDMMUSTRIES LLC MDL GROUP MDL GROUP 7316 55TH ST NE 7316 55TH ST NE 7316 55TH ST NE MARYSVILLE, WA 98270 MARYSVILLE, WA 98270 MARYSVILLE, WA 98270 (425)387-0882 (425) 3 87-0882 (425) 3 87-0882 LICENSE #: MDLGRGL835LK EXP:06/12/2019 wl rr. REPLACE FRONT STEPS, LANDING AND RAILING. REPLACE WINDOWS, MOVE BATHROOMS AND RECONFIGURE INTERIOR NON LOAD BEARING WALLS VALUATION: $45,000 PERMIT TYPE: Residential PERMIT GROUP: 04 - Alteration/Remodel GRADING: N CYDS: 0 TYPE OF CONSTRUCTION: RETAINING WALL ROCKERY: OCCUPANT GROUP: OCCUPANT LOAD: FENCE: ( 0 X 0 FT.) CODE: 2015 OTHER: ------- OTHER DESC: ZONE: RS-8 NUMBER OF STORIES: 0 IVESTED DATE: NUMBER OF DWELLING UNITS: 0 ILOT #: AREA BASEMENT: 0 1 ST FLOOR: 0 2ND FLOOR: 0 PROPOSEDLXISIING 1 BASEMENT: 0 1 ST FLOOR: 0 2ND FLOOR: 0 3R.D FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 BEDROOMS:0 BATHROOMS:O JBEDROOM&O BATHROOMS:0 FRONT ;. REARSEIFBACK REQUIRED: 25' PROPOSED: 25' + REQUIRED: 7.5' PROPOSED: N= 7.5' + REQUIRED: 15' PROPOSED: 15' + HEIGHT ALLOWED:O PROPOSED REQUIRED: 7.5' PROPOSED: S= 7.5' + SETBACK NOTES: PERMIT APPROVAL I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18:27. THIS APPLICATION IS NOT A/PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID. �( / 4/;I/ l( C'%�at Gl% 9 // 24/7 Signature Print Name Datb Released By V Date , ATTENTION 'eft IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF _ OCCUPANCY HAS BEEN GRANTED. UBC109/ BCI 10/ IRCI 10. FIRE APPLICANT ASSESSOR CTIT STATUS: ISSUED BLD20171154 • Final approval on a projector final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. • Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. • Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision of city code or state law does not approve any items not to code specification. • Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits ofECC Chapter 5.30 only during the hours of 7:00amto 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. • Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. • Nothing in this permit approval process shall be interpreted as allowing or permitting the maintenance of any currently e)asting illegal, nonconforming or unpermitted building, structure or site condition which is outside the scope of the permit application, regardless of whether such building, structure or condition is shown on the site plan or drawing. Such building, structure or condition may be the subject of a separate enforcement action. THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT TIME LIMIT: SEE ECDC 19.00.005(A)(6) BUILDING ENGINEERING (425) 771-0220 EXT. 1326 1. Go to: www.edmondswa.gov Building Department Inspections 2. Then: Services are now scheduled online. If you FIRE (425) 775-7720 3. Then: Permits/Development have difficulties, please call the 4. Then: Online Permit Info Building Department front desk for PUBLIC WORKS (425) 771-0235 5: If you don't have one already, create a assistance during office hours. login (upper right hand comer) (425) 771-0220 RECYCLING (425) 275-4801 6: Schedule your inspection When calling for an inspection please leave the following information: Permit Number, Job Site Address, Type of Inspection being requested, Contact Name and Phone Number, Date Preferred, and whether you prefer morning or aftemoon. • B-Preconstruction meeting • B-Plumb Rough In • B-Mechanical Rough In • B-Window Flashing • B-Framing • B-WallInsulation/Caulk • B-SheetrockNail • B-Building Final DEVELOPMENT SERVICES RESIDENTIAL BUILDING PERMIT APPLICATION Est 189� 121 5`h Avenue N, Edmonds, WA 98020 City of Edmonds Phone 425.771.0220 4 Fax 425.771.0221 PLEASE REFER TO THE RESIDENTIAL BUILDING CHECKLIST FOR SUBMITTAL REQUIREMENTS PROJECT ADDRESS (Street, Suite #, City State, Zip): Zt 3 r 6L w E n tm 86 Parcel #: Gv 5 `06 000 0 o 9,00 Subdivision/Lot #: Project Valuation: $ -t�5, ot70 APPLICANT: Al X, Phone: Fax: 1-(Zs -3 -0 Z Address (Street, City�tate, Zip): 731 _ Sf s v-ill A 98a E-Mail dress. i le"); veKw- Ca91 PR PERTY OWNER: A! It C,c,L Phone: 25-3� -0 8 Z Fax: Address (Stre t, City, State, Zip): 93k ke, MAIUSvi I It WA 18L 0 E-Mail Address: LENDING AGENCY: n i P one: 2 - 92- 57,0A Fax: r ss (Street, City, St Zi 4 hlt�' LVUe E-Mail Address: Ca r0� h Q n�Yus �in . CONTRACTOR:* t DL Phone: Fax: Address (Str el, City, State, Zip): 4Ehlail h� s-- ! Y; l Q L Address: W *Contractor must have a valid City of Edmonds business license prior to doing work in the City. Contact the City Clerk's Office at 425.775.2525 WA State License #/Exp. Date: KA IQ LT 55 L K 6e 12-19 City Business License #/Exp. Date: DETAIL THE SCOPE OF WORK: kp,0 60l/ilrUn ?e 1) 1 aCt_ Lk)ir, tg nlS . rt✓� bA4-h ►'Gr1►uS ado, Ilns'V ntd loja lJI ^4 . ���GIIVIh�.yl't (�iPi►'iU' VLt,N - �0c1�1�t t9ea, wal6 PROPOSED NEW SQUARE FOOTAGE FOR THIS PROJECT: Basement: s . ft. Select Basement Type: Finished Ll Unfinished Ll I" Floor: s . ft. Garage/Carport: s . ft. 2"d Floor: s . ft. Deck/Cvrd Porch/Patio: s . ft. Bedrooms # Full-3/4 Bath # Half -Bath # Other: sq. ft. Fire Sprinklers: Yes NoTJ I Retaining Wall: Yes NoEl Grading: Cut cu. yds. Fill cu.yds. I CuUFill in Critical Area: Yes No El I declare under penalty of perjury laws that the information I have provided on this form/application is true, correct and complete, and that I am the property owner or duly authorized agent of the property owner to submit a permit application to the City of EDinds. Print Name. a L, 4i—Owner D�-A ent/Other ❑ (specify): Signature: J Date: "l 3 FORM A L:\Building New Folder 2010\DONE & x-ferred to L-Building-New drive\Form A2014.docx Updated: 1/17/2014 EDM -lOF O v DEVELOPMENT SERVICES r RESIDENTIAL BUILDING PERMIT APPLICATION FORM A Est 1 x90 121 5`h Avenue N, Edmonds, WA 98020 City of Edmonds Phone 425.771.0220 Q Fax 425.771.0221 Equipment Type MECHANICAL Appliance/Equipment Information (new and relocated) Total # Furnace Gas #LElec #_Other: #_ BTUs: <100kj >100k_ Location(s)_�I'1 Air Handler / VAV (circle selected) Gas #_Elec #_Other: # CFM: <10k_ >10k_ Location(s) AC / Compressor / Boiler / Heat Pump / Gas #Elec #_Other: # BTUs: <100k, 100k-500k, 500k-1Mil Roof Top Unit HP: <3, 3-15, 15-30 Location(s) (circle selected) Hydronic Heating Gas #_Elec #_In -Floor _Wall Radiant_ Boiler BTUs: Location Exhaust Fans (single Bath # 2 Kitchen # 1 Laundry # ( Other: # ' 1 duct) / Fireplace Gas #_Elec #_Other: # Location(s) Dryer Duct FUEL GAS Appliance Type Appliance/Equipment Information (new and relocated) Total # AC Unit BTUs: Location(s): Furnace BTUs: Location(s): Water Heater BTUs: Location(s): Boiler BTUs: Location(s): Other: BTUs: Location(s): Fireplace/Insert BTUs: Location(s): Stove/Range/Oven Dryer Outdoor BBQ TOTAL OUTLETS PLUMBING Fixture Type (new and relocated) FIXTURE COUNT Total # Fixture Type (new and relocated) Total # Water Closet (Toilet) Pressure Reduction Valve/Pressure Regulator Sink (kitchen, laundry, lavatory, bar, eye wash, etc.) Water Service Line Tub/Shower Drinking Fountain Dishwasher I Clothes Washer Hose Bib Backflow Prevention Device (e.g. RBPA, DCDA, AVB) Water Heater Tankless? Yes ❑ No F] Hydronic Heat in: Floor ❑ Wall Floor Drain/Floor Sink Other: Refrigerator water supply (for water/ice dispenser) Other: FORM A L:\Building New Folder 2010\DONE & x-ferred to L-Building-New drive\Form A2014.docx Updated: 1/17/2014 City of Edmonds Critical Area Notice of Decision Applicant: Property Owner: (�7's Critical Area File #: ,. a1z)q _ of y -4_ Permit Number: &C) �p 1 _ i 15 Site Location: q q 3�a( Parcel Number: Op Sy 0000 Project Description: a S M a ryl Conditional Waiver. No critical area report is required for the project described above. 1. There will be no alteration of a Critical Area or its re uired buffer. t foc-OK SAS arm1- 2. The proposal is an allowed activity pursuant to ECDC 23.40.220, 23.50.020, and/or t+'A Slopes c,Lon� 23.80.040. 11--� 3. The proposal is exempt pursuant to ECDC 23.40.230. ba�O c� Erosion Hazard. Project is within erosion hazard area. Applicant must prepare an erosion and sediment control plan in compliance with ECDC 18.30. ❑ Critical Area Report Required. The proposed project is within a critical area and/or a critical area buffer and a critical area report is required. A critical area report has been submitted and evaluated for compliance with the following criteria pursuant to ECDC 23.40.160: 1. The proposal minimizes the impact on critical areas in accordance with ECDC 23.40.120, Mitigation sequencing; 2. The proposal does not pose an unreasonable threat to the public health, safety, or welfare on or off the development proposal site; 3. The proposal is consistent with the general purposes of this title and the public interest; 4. Any alterations permitted to the critical area are mitigated in accordance with ECDC 23.40.110, Mitigation requirements. 5. The proposal protects the critical area functions and values consistent with the best available science and results in no net loss of critical functions and values; and 6. The proposal is consistent with other applicable regulations and standards. ❑ Unfavorable Critical Area Decision. The proposed project is not exempt or does not adequately mitigate its impacts on critical areas and/or does not comply with the criteria in ECDC 23.40.160 and the provisions of the City of Edmonds critical area regulations. See attached findings of noncompliance. Favorable Critical Area Decision. The proposed project as described above and as shown on the attached site plan meets or is exempt from the criteria in ECDC 23.40.160, Review Criteria, and complies with the applicable provisions of the City of Edmonds critical area regulations. Any subsequent changes to the proposal shall void this decision pending re -review of the proposal. ❑ Conditions. Critical Area specific condition(s) have been applied to the permit number referenced above. See referenced permit number for specific condition(s). ❑ Notice on Title. Critical area notice on title recorded under AFN 00i C a� i-t / q7- 0 l Reviewer Signature Date Appeals: Any decision to approve, condition, or deny a development proposal or other activity based on the requirements of critical area regulations may be appealed according to, and as part of, the appeal procedure, if any, for the permit or approval involved. Revised 1112912016 i i i —t OL 61 0 F4 CONCRETE DRIVEWAY 941 0 -1, 1 % I - � -twhing in this ppe wit appi�avtd in vvited as allow or perWl mahMnanoe of any carreat!v at or I or she condition w is out" application, wucwn of site pplan or drawing. Suds oolrcdit.ioal may he the awed d it enforcement actim." " he K T- , 5 SIDE SETBACK I IQ m W d) I � 0 LL !n C4 L — LEGAL DESCRIPTION: PREVIEW HOMES WESTGATE VILLAGE 5LK 000 D-00 - LOT 5 r lr-�Rli AN 0 ~"' I M OR N f N PROPERTY INFO. EPLAN L &pl , �4 _0 , PARCEL 00547600000500 Lb_I 6 PRESENT USE: SINGLE FAMILY JURISDICTION: SNOHOMISH COUNTY done � Corner JUr Fla PAYER NAME: AXS INDUSTRIES SCANNED TAX LLC ADDRESS: 218I S 53RD PL W, EDMONDS, Setbacks Required Actual RECEIVED Front Lw� o 5' - 9 5 SEP 12 2017. WA,98020 APPRAISED VALUE: $ 3550 ,80.00: Sides(ty,,S� 4.5" R `�� I ' �.5_+ I AUG?ale LOT AREA OAS AG - 8,245 SF2 Other DEVELOPMENT SERVICES Height ��._.� .�� 5LORLI r7 f l '5q- COUNTER -114 Z Z3 N zW O? U� y < 9 a 0 �m>,n "m w Q m �3m� o ( (pm0 w �zB �=gym > N 1p 9 N Z 0 J Q J � � V N t a m o Z iu o w W 1p O/ J N m N a NO. REV151ONI155UE DATE 01 AS-BULT 05120 R-2105-I10 C7 8/21h01, \/ Il4"=1-6� GENERAL NOTES LIFE SAFETY NOTES (continued) FRAMING NOTES ( continued Nothing in this permit approval process shall be interpreted as allowing or permitting the maintenance of any currently existing illegal, nonconforming, or unpermitted building, structure, or site condition which is outside the scope of the permit application, regardless of whether such building, structure, or condition is shown on the site plan or drawing. Such building, structure, or condition may be the subject of a separate enforcement action. Sound/noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits only during the hours of 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits, unless a variance has been granted. ECC Chapter 5.30 All changes in plans and field modifications shall be approved by the local jurisdiction. The design professional shall prepare drawings as required for approval. IBC 107.4 Temporary address shall be clearly visible from street during all phases of construction. Failure to properly post house/building numbers may result in no inspection by the City Inspector. Curb signage is not acceptable. Address numbers (4" min. ht. & 1/z" min. stroke width) shall be posted to be plainly visible from the street or road fronting the property. IRC R319 LIFE SAFETY NOTES Smoke alarms shall be installed in each sleeping room, outside of each separate sleeping area in the immediate vicinity of the bedrooms, and on each level (including basements and habitable attics) in new construction and in existing dwellings when alterations, repairs or additions requiring a permit occur. Smoke alarms shall be hard -wired with battery backup, and when more than one smoke alarm is required within an individual dwelling unit, they shall be interconnected. Discuss exceptions to the power source requirements with the Building Inspector. IRC R314 IBC 907.2.11.2 Carbon monoxide alarms shall be installed outside of each separate sleeping area in the immediate vicinity of the bedrooms and on each level in new construction and in existing dwellings when alterations, repairs or additions requiring a permit occur, or when one or more sleeping rooms are added or created. IRC R315 Handrails and guards must be capable of resisting a concentrated loau of 200 pounds per square foot applied in ally direction at any point along the top. Guard in -fill components must be capable of resisting 50 pounds per square foot. IRC Table R301.5 IBC 1607.8 Handrails shall be continuous through stair flights of four or more risers, without interruption by newel posts (unless at a turn) or other obstructions, and return to a wall, newel post, or safety terminal. The grip -size shall be Type I or 11 or of equivalent graspablity. IRC 311.7.8 ide one operable escape window in the basement, habitable and in each sleeping room meeting all of the following -An operable area of not less than 5.7 sq. ft. (5 sq. ft. for grade floor opening) •A minimum clear opening height of 24 inches •A minimum clear opening width of 20 inches -Not more than 44 inches between the finished floor and the bottom of the clear opening. Escape windows located under decks or porches must have a path 36 inches in height to a yard or court. R310 IBC 1029 The greatest riser height within any flight of stairs or the greatest tread depth within any flight of stairs shall not exceed the smallest by more than 3/8 inch. IRC R311.7.5.1 IRC R311.7.5.2 IBC 1009.7.4 FOOTINGS/FOUNDATIONS Footing drains are required around concrete/masonry foundations that retain earth and enclose habitable or usable spaces located below grade, or for crawl spaces when a minimum 6 inch slope within the first 10 feet of the foundation wall is not achieved. A separate footing drain inspection by the Building Inspector is required. IRC R401.3 IRC R405.1 Slab -on -grade floors shall be a minimum 3.5-inch thick concrete over a 6 mil vapor barrier and 4-inch base of sand/gravel/etc. There shall be a thermal -break for slabs inside a foundation wall, and if the slab is less than 24" below the exterior grade, 24" wide R-10 perimeter insulation must be provided. Slabs used as part of a hydronic heating system shall have R-10 insulation provided throughout the entire slab area. IRC R506 WSEC R402.2.9 WSEC Table R402.1.1 Vertical rebar must be hooked and tied in place at time of footing inspection. Maintain minimum 3" clearance to earth, 1-1/2" to form -work for reinforcement. R403.1.3 R404.1.2.3.7.4 Anchor bolts shall be at least 1/2 -inch in diameter and extend 7 inches into concrete. There shall be a minimum of two bolts per plate, with one bolt within 12 inches but not closer than seven bolt diameters from the end of the plate. The bolt spacing shall not exceed 6 feet o.c. and shall have a nut and 3"0"0.229" washers unless engineered. IRC R403.1.6 FRAMING NOTES Hardware and fasteners in contact with preservative -treated wood shall be of !iot-clipped zinc galvam-edsteel, stainless steel, silicon bronze or copper. IRC R317.3.1 IBC 2304.9.5.1 oists less than 18" and beams less than 12" to grade and all wood xposed to weather shall be preservative -treated or naturally esistant to decay. IRC R317 IBC 2304.11 oists shall have not less than 1.5 inches bearing on wood or metal nd 3 inches on concrete. Joists shall be prevented from rotating .t the ends and at intermediate support by approved hangers, 2 inch nominal blocking, or attachment to a rim board. IRC 502.6/502.7 IBC 2308.8 Foundation cripple walls shall be framed of studs not less in size than the studs above. Walls over 4 feet in height shall be framed of studs having the size required for an additional story. Cripple walls studs less than 14 inches in height shall be sheathed on at least one side with a wood structural panel that is fastened to both the top and bottom plates in accordance with Table R602.3(1), or cripple walls shall be constructed of solid blocking. Cripple walls shall be supported on continuous foundations. IRC R602.9 Prior to the framing inspection, the building must be dried in with a minimum of roofing, windows, and siding paper installed. Truss layouts showing girder truss/hip-master locations are not permitted to change and must be followed correctly. If the truss manufacturer requests to change, in part or in whole, the layout shown, they must contact the architect/designer to ensure that the structural design of the building is maintained. If the layout shown is changed, in part or in whole, the Building Division requires new engineering calculations and must approve the changes prior to the installation of the roof sheathing. Exterior and bearing wall studs may be notched <25% and bored <40% of the stud width. Non -bearing wall studs may be notched <40% and bored <60% of the stud width. Any bore located <5/8" from the stud face is considered a notch. Rafters and joists may be notched in the outer thirds of the span with a maximum notch depth 1/6th and a notch width 1/3rd the depth of the member. Rafters and joists may be bored up to 1/3rd the depth of the member no closer than 2" to each edge or to another bore. Top plates notched or bored >50% of the width must have a 16ga. strap, 6 inches past and fastened with 8-10d nails at each side of the opening. IRC R502.8 IRC R602.6 IBC 2308 Attic access openings are required for buildings with combustible ceiling or roof construction over an area >30 sq. ft. and with a 30" vertical space between ceiling and roof framing members. The rough -framed opening shall be 22"x30" and located in a hallway or other readily accessible location. The access cover shall be weather-stripped and insulated to a level equal to the surrounding surfaces. IRC R807.1 WSEC 402.2.4 Attic ventilation openings shall not be less than 1/150 of the area of the space ventilated. It may be reduced to 1/300 if at least 50 percent and not more than 80 percent of the required openings are at least 3 feet above the eave vents with the balance provided by the eave vents. The net free cross -ventilation area may also be reduced to 1/300 when a Class I or II vapor barrier is installed on the warns -in -winter side of the ceiling. IRC R806.2 ADDITIONAL REQUIREMENTS A survey may be required prior to the foundation wall inspection if the Building Inspector is unable to verify setbacks. Lot line stakes should be in place at the time of the foundation inspection and established property pins should be made visible. CN MECHANICAL NOTES VLUMB1NC_i 1NU1LJ P1KK-KA h1) UUN J I K U C TIUN Provide outdoor air inlets in all habitable spaces.IRC 1507.3.4.4 A 30"00" level working space shall be provided in front of the control side to service appliances. In attics and underfloor areas, a passageway a minimum of 30 inches high and 20 inches wide traveling not more than 20 feet from the access shall be provided. A 24 inch wide solid pathway shall be provided in attics. A switch -controlled luminaire is required at the passageway opening and a receptacle outlet at or near the appliance. A means of electrical disconnect is required within sight of the appliance or the breaker is to be capable of being locked in the open position. IRC M1305 IMC 306 NEC 422.31(B) Provide the combustion air required for the proper operation of the appliance(s). The minimum required volume per the standard method is 50 cubic feet per 1000 BTU/hr. Where exhaust fans, clothes dryers, and kitchen ventilation systems interfere with the operation of appliances, makeup air shall be provided. Fuel -fired appliances shall not be located in sleeping rooms, bathrooms, toilet rooms, or storage closets unless specific installation requirements are met. IRC G 2406.2 G2407.4 G2407.5.1 IFGC 303.3 304.4 304.5 An exhaust hood/system of >400cfm installed or required by the range or cooktop manufacturer must be provided with makeup air equal to the exhaust air rate. IRC M1503.4 IMC 505.2 Provide required makeup air in the laundry room. Louvered doors or openings/grilles into other spaces may be used to meet the requirements. Other limitations may arise if a gas dryer is installed. IMC 504.5 G2407.4 G2407.9.1 Dryer ducts shall terminate outside of the building, 3 ft. from any openings into the building. The termination shall have a backdraft damper and no screen. The dryer duct shall be a minimum .016-in. (27 ga.) thick, a minimum 4 inches in diameter, have a smooth interior finish, have sections joined with the insert end in the direction of airflow without the use of fasteners, be supported at 4 ft. intervals, and secured in place and protected by nail plates that extend 2" above/below bottom/top plates. The joints shall be sealed with UL181A listed mastic or tape. Dryer duct maximum lengths are 25 ft. for electric and 35 ft. for gas with deductions for fittings (or sized/length per manufacturer). If concealed, the equivalent length of the duct shall be permanently labeled or tagged within 6 ft. of the dryer connection. IRC M1502 M1601.4.1 G2439 IMC 504 IFGC 614 Hydronic heating system piping shall be tested at 100 psi water pressure or 1 1/' timos the operating pressure, whichever is greater, for a minimum of 15 minutes. Piping embedded in concrete shall be pressure tested prior- to the placing of concrete and be maintained at operating pressure during concrete placement. The test must be observed by the Building Inspector prior to concrete placement. Note: a means of providing outdoor air per IRC R303.4, M1507 and IMC 403.2 is required. IMC 1208 - 1209 Refrigerant circuit access ports located outdoors shall be fitted with locking -type tamper- resistant caps. IRC M1411.6 IMC 1101.10 (tures installed on a floor level that is lower than the next stream manhole cover of the public or private sewer shall be )tected from backflow of sewage by installing an approved type backwater valve. Fixtures on floor levels above such elevation Ishall not discharge through the backwater valve. UPC 710.1 Vent all plumbing fixtures through the roof per UPC 906.0 or with a loop vent per UPC 909.0. Air admittance valves are not permitted unless first approved by the Building Inspector on a case by case basis. Water heaters installed in attics, attic -ceiling assemblies, floor -ceiling assemblies or a floor/sub-floor assembly, where damage may occur from a leak, shall be installed in a watertight pan made of corrosion -resistant materials. The pan shall have a inimum 3/a" drain and the drain shall terminate in a visible location. The drain cannot empty into the crawlspace beneath a building. Discharge from a relief valve into a water heater pan shall be prohibited. UPC 507.4 UPC 507.5 Access will be required for the whirlpool/jetted tub pump and the tempering valve for all tubs. The tempering valve may also be installed at the water heater. UPC 409 Showers shall be a minimum of 900 square inches and be capable of encompassing a 30 inch circle. The shower receptor shall have a finished dam, curb, or threshold between 2" and 9" above the top of the drain. The floor of the shower shall slope a minimum of 1/a" and a maximum of 1/z". Lining materials for built-up showers and shower seats shall be sloped, extend upward 3" above the horizontal surface, and over the top of the dam or threshold. Shower receptors shall be tested by filling with water to the top of the rough threshold while plugged at the drain. Protect the weep in the sub -drain clamping ring from clogging. JUPC 408.5 - 408.7 1 [Main building shut-off required on water supply line. UPC 606.2 Pressure reduction valve on main water supply line required by City code. Vent hot water tank relief valve directly to the outside. UPC 608.5 Hot water heater must be seismically anchored or strapped at points within the upper one-third and lower one-third of its vertical dimensions. At the lower point, a minimum distance of 4" must be maintained above the controls with the strapping. UPC 507.2 All pressure absorbing devices (e.g. air chambers, mechanical devices, hammer arrestors) shall be accessible or installed per manufacturer. UPC 609.10 Minimum 1" air -gap required at dishwasher. UPC 414.3 Hose bibs (exterior faucets) are required to have a permanently affixed anti -siphon device installed. UPC 603.5.7 Soaker and jetted tubs shall be installed and supported per the manufacturer's installation specifications. UPC 409.6 Dwelling/garage separation shall be maintained by installing 1/2" gypsum wallboard on the garage side from the foundation to the underside of the roof sheathing. Ceiling of garages with habitable space above shall have 5/8-inch Type X gypsum wallboard attached with 1-7/8 inch 6d coated nails or equivalent drywall screws and the structural elements supporting the ceiling protected with 1/2 gypsum wallboard. Enclosed accessible space under stairs shall have walls, under -stair surface and any soffits protected on the enclosed side with 1/2" gypsum wallboard. Water resistant gypsum shall not be used as a tile backing board where there will be direct exposure to water, or in areas subject to continuous high humidity (showers, etc.). IRC R302 IRC R702.3.8.1 Fireblocking shall be provided to cut off all concealed draft openings (both vertical and horizontal) and to form an effective fire barrier between stories, and between a top story and the roof space. Fireblocking shall be provided in wood -frame construction in the following locations: 1) In concealed spaces of stud walls and partitions, including furred spaces and parallel rows of studs or staggered studs as follows: 1.1 Vertically at the ceiling and floor levels. 1.2 Horizontally at intervals not exceeding 10 feet. 2) At all interconnections between concealed vertical and horizontal spaces such as occur at soffits, drop ceilings and cove ceilings. 3) In concealed spaces between stair stringers at top and bottom of the run. 4) At openings around vent, pipes, and ducts at ceiling and floor level, with an approved material to resist the free passage of flame and products of combustion. For additional requirements see IRC 302.11 IDraftstobs shall be installed in combustible construction where there is I usable space both above and below the concealed space of a floor/ceiling assembly, so that the area of the concealed space does not exceed 1000 sq. ft. and shall divide the space into approximately equal areas. Where the assembly is enclosed by a floor membrane above and a ceiling membrane below, draftstopping shall be provided in floor/ceiling assemblies under the following circumstances: 1.Ceiling is suspended under the floor framing. 2.Floor framing is constructed of truss -type open -web or perforated members. Draftstopping materials shall not be less than 1/2 inch gypsum board, 3/8 inch wood structural panels or other approved materials adequately supported and installed parallel to the floor framing membersIRC R302.12 ADDITIONAL REQUIREMENTS Height verification shall be done by the applicant's agent/contractor and observed by the Building Inspector on site. The agent/contractor shall set up the equipment (transit/builders level), establish the datum point, and the point of average grade. These items must he consistent with the approved plans. If the proposed height of a building (as shown on the plans) is within 12 inches of the maximum height permitted for the zone, an elevation survey is required. An elevation survey consists of three components to be conducted by a licensed surveyor. 1) Prior to construction, the surveyor shall establish average grade as specified in ECDC 21.40.030, and shall establish a reference datum point that will be and can be freely accessed. 2) The surveyor shall locate the elevation of the first floor prior to the City under -floor inspection. 3) A final letter of height confirmation shall be provided upon completion of the structure. CN 2 SYMBOL LEGEND U NEW WALL 0 Z EXISTING WALL 0 J WALL TO 5E REMOVED C = = C N 43/-4 5RIGK WALL O Lu Uw 3 18•_9Q ,• � 3 16,_5„ 3:L IDm>� 3630 SL g 100GFM WSH 56 FAlq 10 W DR BATHROOMx CIA LL 3 Q m O PLAYROOM = 3, z 9 co � � m > N WH �LD)- �s I 1 GARAGE 23,_3,/ UP 2 4 12 N r-------------- - - - - - - - - - - - - - ---- z_ PLAYROOM Q I I i UP 8 w Noom i I „ u 13W 0 5-9 0 �W�° Lu � LW 2412 F -' s 6'X6'6" GARAGE DOOR 8'X6'6" GARAGE DOORi WSH 12 m 3-0 Q 5630 2-c249LL RECEIVED D WSH48 NO. REVISION/ISSUE DATE 2, 8 4._2., a� 4'-3'/ �, 01 AS BULL 05/10 _3 aI�G `' 3 2�17 DEVELOPMENT, SERVICE COUNTER �E�ENT FLAN— AS—BUILT14 L:� r14%—- . 41-0// Rre1105-110 aee 5/21/2011 A21 43'-4" 9,_5„ 14,_1„ ,_6„4„ 2'-103, ,_50 4, 2,—l„ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 5636 SL 3636 SL 4848 SL WSH 41 WSH 41 WSH 35 I I o � o I I I I I BEDROOM #1 m ICE II II \ ITT 2-8 r— '—II 2_5 I I CLOSET I 2-8 2'4" I I I I I I I 11 �-5Y I BEDROOM #2 I I I I I I 9636 S WSH 45 2-8 2-4 SYM50L LEGEND NEW WALL 0 1 g,-10„ EX STING WALL O WALL TO BE REMOVED C = —10 -BRICK WALL�����.�• 3fo36 SL WSH 41 1068 SL DOOR I I I DW I - -I- I I I j KITCHEN j I tu U I i I I I I I 23'-4$1 14ro -- 3 13 4 12 11 LIVINGROOM BEDROOM #3 9 I DN UP 8 I 5'-10" I 6934 FX I WSH 51 I 9636 SL 5458 2-24" SL WSH 4i WSH 24 — — — — — 1rl l — — — — — 1� 6�-��� 4'-7l'-10" 4'-4"' I L- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - J ALL WORK SUBJECT TO FIELD INSPECTION FOR CODE COMPLIANCE 1ST FLOOR PLAN- AS-5UILT 1/4 11 /T// = 1 I-011 z J N zLu ULu �Q3 lQ m ) w Q m Lu o No�mo� w N z Q J � � Q 0 w w w s m f N Q `® NO. REV1510NII.E Dd BI A9-IMLT 0B �J RECEIVED ` R-il B5-I10 AUG0 3 2017 8121/2011 Al DEVELOPMENT SERVIC _l I�<, COUNTER min 21 SYMBOL LEGEND 43,_4„ NEW WALL 0 EXISTING WALL 0 g,-r✓' ,1 �-1 19,-18„ WALL TO BE REMOVED C = _ ,. , u •, , „ , , , „ , , „ • , BRICK WALL51 2 -10 3 -�✓ � 2 -7" i _8 3 5 -3 •_10•, 1 -2 9636 SL 3636 SL 4845 SL T636 SL l068 SL DOOR WSH 41 WSH 41 WSH 35 WSH 41 I _ I I I I I I c j l _L L KITCHEN IBEDROOM #1 Lr-- IrjjL= -A !- -1- �Wua IT"� / I i� I I �� r� 1711 1 II i I II II I I IL F---2 2-8 C-- �i 2-8 - - - - - - - - - I R---\ II \ CLOSET 7A n Li -- 2-8 1 2-8 II 2-4 \ �..���������� 23'-4" 0 15 � -- 1 /I Ti r 14 uu �r 3 13 4 12 $ 11 LIVINGROOM BEDROOM #2 BEDROOM #3 DN UP 8 6934 FX WSH 91 9636 SL 9636 9L c3458 2-24" SL WSH 45 WSH 41 WSH 24 - . T -1 l 2 -2 T -11 - ro,-l" 4'-l" 1j-10" 4,_4„ NOTES: THERE'S NO DEMOLITION Or- UTALLS IN THE BASEMENT 1ST FLOOR DEMOLITION AUG 2 3 201 DEVELOPMENT SE COUNTER Z H J Z3 N ZW OZ Uw �Q� �= m fQ m > m I m � w p m 113 m3 N0m6 w NO. REV15IOWI55UE I DATE 01 A.I.LT 99/10 R-2105-110 8�71 �3011 111'_i61' 1 SYM50L LEGEND A6 NEW WALL 0 43'_4„ EXISTING WALL 0 WALL TO 5E REMOVED 13'-10" 20'-1" BRICK WALL —�" SMOKE/GO DETECTOR O — — — —7-11— — — 2 -1401 -� 3 0 5 -4 -10 3 5 -3 „ 1 -2 sa co _10 SMOKE DETECTOR Sro SL 3636 SL 13- 6316 SL sp LUSH 44 LUSH 4l WSH 4l 1068 SL DOOR I CH S4 N o 00 i- - O cFM IDLU- --- I F i I BATHRM #1 „ 5EDROOM #1 5ATHRM #2 100 l2r cFM Ori 2-8 SA�CA CLOSET fl I ' 2'-4'I CLOSET sslk 013' 5EDROOM #2 WSH 44 FLOOR AREAS 1ST FLOOR AREA 1,050 SF BASEMENT AREA 510 SF GARAGE AREA 450 SF TOTAL AREA 2,100 SF CLOSET 2-8 sn 5EDROOM #3 WSH 44 mlml� KITCHEN 3 -(o I RANGE 3' 5000 GFM I lie 4X14 BEAM 14 3 13 so ca - - 4 12 -- 11 6 10 l 5 DN UP 8 6934 FX LIVINGROOM an- 23'-4" 5455 2-24" SL I Q WSH 24 4'-1" 1'-10" 4'-4" NO. REVI5IONI189UE DATE -J BI AS-BWLT 08/36 1 ST FLOOR PLAN -PROPOSAL AUG23 201781i11i011 DEVELOPMENT SERVIC 1/4"1 COUNTER A /A 3,_ro„ i� N 4' c4 N 43'-4" I8'-9" (0 4' 3' 8 3630 S WSW 56 WH 10 CFM F W OR 5ATHROOM TILE GARAGE N 23'_3„ _�_—---- 1 6X14 5EAM �- Eo 2-6 UP" ----13 -----12 ----I1 1 10 2 3 4 5 6 5 uP 81 II II 2412 F WSH 12 3-0 '_ 2' '. 1 SYMBOL LEGEND ArJ NEW WALL EXISTING WALL WALL TO BE REMOVED C= BRICK WALL SMOKE/CO DETECTOR SD GQ SMOKE DETECTOR 8D f- w O U OFFICE Q a' CARPET s>7 I &X14 BEAM aD co I 6' I PLAYROOM ( I I 5'-9" 5630 2-249L 1 RECEIVED 4'-2" gWSH48' 4'-3" AUG 2 3 2017 DEVELOPMENT SERVICE COUNTER 1 5ASEMENT PLAN -PROPOSAL 1 /�" _ 1,_0„ N z J Z3 N ZW 0 ? �Q� mmy�,m o��mm 3: Fyn Q�F z Q �3 0 J a J � � 0 z z w O�0 E �w m N a NO. REVISION/10SUE DATE 01 AS-BULT 00/20 RZ10" 10 5/2112011 A 4 I/4"9-9 SYMBOL LEGEND NEW WALL 0 Z EXISTING WALL 0 44 �_�ii WALL TO BE REMOVED C - _ � � N LLI BRICK WALL 0 O Z SMOKE/CO DETECTOR SD co V ui y Q SMOKE DETECTOR SD Q ~ � m I I Lu I �Za �3: to � in I I I 23�-11 jU 9 5 m Q�Q N �m w ao w NO. REV151OJA55UE DOTE 3 01 A5-5UILT 05120 3 ROOF PLAN-AS-5UILT AUG2���, _ N R-2105-110 1 /4„ 1 -e„ DEVELOPMENT SERVICES 8/Ti112011 COUNTER 1/4.1 SYM50L LEGEND WSW 44 3ro" TALL,HANDRAIL 3 3' 1`2 2'- ro'-1 s" I .J 11 21 31 "4 +11 "1 "" RRH +i"10" r-r w .�/✓�///// \/�\%\/// \ice\% OL % DISECTION I S458 2-24" SL WSH 24 2 NE/jUJ STAIiz �DET�AIL� NEW WALL 0 EXISTING WALL O WALL TO 5E REMOVED C = _ Z) BRICK WALL ECOVED AUG 2 3 2017 DEVELO MENTER SERVICES COU Z H J Z3 N ZW V W Q � � LLi m w To-�mm w W w �ol(a� (LN 8__r- `) � � F 9 N Z z� o (V 61 w _Lu a s m I 16 a NO. REV1510N1155UE DATE 01 AS-5ULT 05/20 R-i105-110 8h1h011 #4& Il4`=1-0 44' 2" X 8" RIM JOIST 6" X 6 CEDAR POST 6 " X 14 CEDAR BEAM .. 2 X 8 RIM JOIST 2" X 8" RIM JOIST 6 XX IA CEDAR BEAM 2 X e RIM JOIST SYMBOL LEGEND NEW WALL 0 EXISTING WALL O WALL TO BE REMOVED C = = ZI BRICK WALL 7 7 7777 A6 SMOKE/CO DETECTOR gp CO SMOKE DETECTOR SD N b OC X (V RECEIVd���(�pp.�e�mr.• T--- AUG 2 3 2017 DEVELOPMENT SERviu COUNTER 1 ST FL - FLOOR JOISTS LAYOUT 1/4 4$ _ 1,-04 N �4) 00 J 7 N ZLu u u, Q � F � m �m>,n "m w Q m i �0Lu N6m6� 13 z 3 >� d)m T�i w 9 m N Z OC 3 0 J Q —i(La Lu Q OQm cy z 0 �0,11�� w I-ww w J H m I N Q NO. REVISION/ISSUE DATE 01 AS -BUILT 08/20 R-3105-II0 �C) .121/2011 `I 1 12:3 PITCH 12:3 PITCH Q 2" X 10" FASCIA 2" X 10" FASCIA xI I - - - ---- - --- -- - - --- --- -- --- - - x r -n -n -I-- D D ...... x N rm Z x- -nI -- . . ... ........--------------- � - - - - - v l - - - -- - - I-- --- x x m ................ ........ ------ _- N D -mI _ -D N p NZ. A 1 ` a 0 N o - m N - 2" X 10" FASCIA 2" X 10" FASCIA m RESIDENCE AS -BUILT -PROPOSAL DRAWINGS Et Z 21819 93RD PL W m EDMONDS, WA 98020 I BUILDER MDL GROUP LLC 1316 55TH ST NE MARYSVILLE, WA W210 ul z N D M A AZ F dz 3 e o D F Ol F m D 0 m F I- 3 M o 0 v :n Z O u DESIGNER SMD-B;M CONSULTING 905 130TH AVE. NE BELLEvUE, WA 98005 TEL (206) 201-1014 {1S11-Lloea^i9' CITY OF EDMONDS BUILDING DEPARTMENT WORK �Ya,4 �sri✓5 T.nae.���/ �e v►10 � ADDRESS 21?jo, 93 ?L OWNER &S 77JXJ3.6 APPROVED DATE: BLDG. OFFICIAL: PERMIT NUMBER �D AUG 2 3 2017 DEVELOPMENT SERVICES COUNTER