BLD2018-0842 Talbot Email 2.msg
IPM.Note
Fwd: 907 Dayton St - Permit Drawings for 1st Floor
Fwd:
Carter, Eric
Troy Chapman
Carter, Eric
SMTP
troy@chapmanprojects.com
907 Dayton St - Permit Drawings for 1st Floor
EX
/O=CITY OF EDMONDS/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=CARTER, ERIC7EC
EX
/O=CITY OF EDMONDS/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=CARTER, ERIC7EC
X-Vipre-Scanned: 0B02E004012B480B02E151
Received: from barracuda.edmondswa.gov (192.168.100.38) by
EDMSVR-EXCH02.edmonds.local (10.10.3.20) with Microsoft SMTP Server id
14.3.439.0; Thu, 18 Jul 2019 10:22:46 -0700
X-ASG-Debug-ID: 1563470564-0932526c1251bc0001-IgVcN0
Received: from mail.ess.barracuda.com (mail.ess.barracuda.com
[209.222.82.139]) by barracuda.edmondswa.gov with ESMTP id KtgC4i3Pf1ug3zkH
(version=TLSv1.2 cipher=ECDHE-RSA-AES256-GCM-SHA384 bits=256 verify=NO) for
<eric.carter@edmondswa.gov>; Thu, 18 Jul 2019 10:22:44 -0700 (PDT)
X-Barracuda-Envelope-From: troy@chapmanprojects.com
X-Barracuda-RBL-Trusted-Forwarder: 209.222.82.139
Received: from mail-pl1-f175.google.com (mail-pl1-f175.google.com
[209.85.214.175]) by mx113.us-east-2b.ess.aws.cudaops.com (version=TLSv1.2
cipher=ECDHE-RSA-AES128-GCM-SHA256 bits=128 verify=NO); Thu, 18 Jul 2019
17:22:41 +0000
Received: by mail-pl1-f175.google.com with SMTP id k8so14235238plt.3
for <eric.carter@edmondswa.gov>; Thu, 18 Jul 2019 10:22:41 -0700 (PDT)
X-Barracuda-RBL-IP: 209.85.214.175
X-Barracuda-Effective-Source-IP: mail-pl1-f175.google.com[209.85.214.175]
X-Barracuda-Apparent-Source-IP: 209.85.214.175
X-Barracuda-BBL-IP: 209.85.214.175
DKIM-Signature: v=1; a=rsa-sha256; c=relaxed/relaxed;
d=chapmanprojects-com.20150623.gappssmtp.com; s=20150623;
h=from:content-transfer-encoding:mime-version:date:subject:message-id
:references:to;
bh=+yqqhKGfY7GmlFpLmyBwpqFLvPoQEoERrx4W3AtUQug=;
b=yTrdi1ZaWAlXMsNgaQ0pU1i3ws2u8sg/GUwgGUx+Q5QKy83WXinGZzp5cHag2W6A/f
kSvjAiR91t+nELisfgXNBhj3Mzh41IT1wIKjnC7ipvp97UWMwiyTHkQLuJYHL4E+m1Sk
J7nG4BmtejB5Q/YetUHturJs6pbz1sfUKBaa85M+EfEYV/GjGlh/A3GJCAU9+s9UgoTT
zrpK44qWX7TbmOfrbnelN9km1mDbOlLOgovyrtGAXsLIQ/7LLA5uirMMeM25KrNsNSi6
qygehYuzg8jjl9YH32rMBnMObxtsWE8RJBDxQwzOJDjm3VrNS0VT3Y00wEQHgkwrtmVf
CWZA==
X-Google-DKIM-Signature: v=1; a=rsa-sha256; c=relaxed/relaxed;
d=1e100.net; s=20161025;
h=x-gm-message-state:from:content-transfer-encoding:mime-version:date
:subject:message-id:references:to;
bh=+yqqhKGfY7GmlFpLmyBwpqFLvPoQEoERrx4W3AtUQug=;
b=OIiVt8PcMcr0VawlRJahtAa3bQXphJnBvWOmcS7f0b+x9l4vaBV8WZEeurm9OOqXwc
SsLaDAIuI6DDPZHTJzQUfN7sUo3J1qnpBDxd6rjmoFFf6ZPiYetVViXYQeQMVb2SGSQq
1liFx2kmOUqm+17cH9/g9PezEFGfd7hLkx8vo09bDcuT7MbH7tjYglMBzRueNzWpaHdf
yFMVuE5zoW9/Hbkzxc/eWisTHaobu4G9UTst0ec1wwiJepaAp3y1xvWfvOw6+4opFaCr
Vd5k90TZ+D56ozxzXP3QU5GiOawcCDlrZzZoNjsZH8Ifh7RMKqjCMKiQd2QHTUJaM2Np
ql1Q==
X-Gm-Message-State: APjAAAXmx03zT0CDvYxOXFTwJPlPhU+Ul0lfIBlPaWyd7fQ79XuYRcSw
An4zu7iPhTRnOzcLd/oF19Pr/j6ka6c=
X-Google-Smtp-Source: APXvYqz3b3amMcgfK/VmX/lOKF8OrAcCnWkxLWdlUYDi4Zggxf4sGkyhP/eIJyctyb3e+v0nXvAR9Q==
X-Received: by 2002:a17:902:28c9:: with SMTP id f67mr11606734plb.19.1563470560885;
Thu, 18 Jul 2019 10:22:40 -0700 (PDT)
Received: from ?IPv6:2600:100f:b014:cfe3:8d36:88a3:6f0a:e6ec?
([2600:100f:b014:cfe3:8d36:88a3:6f0a:e6ec]) by smtp.gmail.com with
ESMTPSA id k70sm31660140pje.14.2019.07.18.10.22.40 for
<eric.carter@edmondswa.gov> (version=TLS1_2
cipher=ECDHE-RSA-AES128-GCM-SHA256 bits=128/128); Thu, 18 Jul 2019
10:22:40 -0700 (PDT)
From: Troy Chapman <troy@chapmanprojects.com>
Content-Type: multipart/alternative;
boundary="Apple-Mail-2C3E8662-D2E9-4EDD-97F1-E64B4FE08CE0"
Content-Transfer-Encoding: 7bit
MIME-Version: 1.0 (1.0)
Date: Thu, 18 Jul 2019 10:22:29 -0700
Subject: Fwd: 907 Dayton St - Permit Drawings for 1st Floor
Message-ID: <B8AC54E5-B3D0-4D1E-A6DB-827B620621BD@chapmanprojects.com>
X-ASG-Orig-Subj: Fwd: 907 Dayton St - Permit Drawings for 1st Floor
References: <DM5PR15MB1802E53830C16EBBC47BBE11B5F10@DM5PR15MB1802.namprd15.prod.outlook.com>
To: <eric.carter@edmondswa.gov>
X-Mailer: iPhone Mail (16F203)
X-BESS-ID: 1563470561-893225-3558-25476-1
X-BESS-VER: 2019.1_20190716.2103
X-BESS-Apparent-Source-IP: 209.85.214.175
X-BESS-Spam-Status: SCORE=0.00 using account:ESS78875 scores of QUARANTINE_LEVEL=0.0 KILL_LEVEL=5.0 tests=HTML_MESSAGE, MIME_QP_LONG_LINE
X-BESS-Spam-Report: Code version 3.2, rules version 3.2.2.216122 [from cloudscan13-
226.us-east-2a.ess.aws.cudaops.com]
Rule breakdown below
pts rule name description
---- ---------------------- --------------------------------
0.00 HTML_MESSAGE BODY: HTML included in message
0.00 MIME_QP_LONG_LINE RAWBODY: Quoted-printable line longer than 76 chars
X-BESS-Spam-Score: 0.00
X-BESS-BRTS-Status: 1
X-Barracuda-Connect: mail.ess.barracuda.com[209.222.82.139]
X-Barracuda-Start-Time: 1563470564
X-Barracuda-Encrypted: ECDHE-RSA-AES256-GCM-SHA384
X-Barracuda-URL: https://barracuda.edmondswa.gov:443/cgi-mod/mark.cgi
X-Virus-Scanned: by bsmtpd at edmondswa.gov
X-Barracuda-Scan-Msg-Size: 10788
X-Barracuda-BRTS-Status: 1
X-Barracuda-Spam-Score: 0.00
X-Barracuda-Spam-Status: No, SCORE=0.00 using global scores of TAG_LEVEL=1.0 QUARANTINE_LEVEL=2.5 KILL_LEVEL=8.0 tests=HTML_MESSAGE
X-Barracuda-Spam-Report: Code version 3.2, rules version 3.2.3.74130
Rule breakdown below
pts rule name description
---- ---------------------- --------------------------------------------------
0.00 HTML_MESSAGE BODY: HTML included in message
Return-Path: troy@chapmanprojects.com
X-MS-Exchange-Organization-AuthSource: EDMSVR-EXCH02.edmonds.local
X-MS-Exchange-Organization-AuthAs: Internal
X-MS-Exchange-Organization-AuthMechanism: 10
Troy Chapman
SMTP
troy@chapmanprojects.com
Carter, Eric
907 Dayton St - Permit Drawings for 1st Floor
Here you go. See attached.
Sent from my iPhone
Begin forwarded message:
From: Ty Bartley <tbartley@fossatti.com>
Date: July 8, 2019 at 5:29:55 PM PDT
To: Troy Chapman <troy@chapmanprojects.com>
Subject: RE: 907 Dayton St - Permit Drawings for 1st Floor
The exterior door header out of the kitchen is shown on S2.2 Roof framing plan. Called out as a 4x6.
There is no special detail needed for the header. I can add a header detail if you think the building department will like to see it, but header construction falls under the nailing
of IBC table 2304.10.01 as called out in the general notes.
Let me know if you want the detail added and I will resend in the AM.
Ty Bartley S.E.
Associate
1735 Westlake Ave N, Suite 205, Seattle, WA 98109
p 206.456.3071 x111 f 206.456.3076
www.fossatti.com <https://linkprotect.cudasvc.com/url?a=http%3a%2f%2fwww.fossatti.com%2f&c=E,1,UK8ouXsDODZCUVHWn0XGpmdobpGUQ9sQPDFaUrB0s6o4Fp4j6DxQM0wKPiC0O6H54hym7FyGLHOIJ9Dshgp-tdEbg31GK8PzxKNxLxW
ANI9D&typo=1>
From: Troy Chapman <troy@chapmanprojects.com>
Sent: Monday, July 8, 2019 5:22 PM
To: Ty Bartley <tbartley@fossatti.com>
Subject: Re: 907 Dayton St - Permit Drawings for 1st Floor
Hey Ty,
Thanks for these. It looks like the header alteration for the one exterior door to accommodate the new floor height was left off of these.
Do you have a typical header detail you can put in quickly? I urgently need to get this permit submitted so we can continue working/keep the guys going.
Thanks, Troy
Sent from my iPhone
On Jul 8, 2019, at 5:02 PM, Ty Bartley <tbartley@fossatti.com> wrote:
Troy,
Attached are the drawings and a page of stamped calculations stating the only work is to the 1st floor diaphragm. Please let me know if there is anything additional requested by the
building department.
Thank you,
Ty Bartley S.E.
Associate
<image001.jpg>
1735 Westlake Ave N, Suite 205, Seattle, WA 98109
p 206.456.3071 x111 f 206.456.3076
www.fossatti.com <https://linkprotect.cudasvc.com/url?a=http%3a%2f%2fwww.fossatti.com%2f&c=E,1,xwXHvx_5hrnJ9QTEN1i7Gk7YE9kNtI2-UsuzsLeuJ4J6-9zoKg-rC38mhGsuRIsyMWmDNWMQvWgWWjXuKh-asYHt6NOyx-G1K3UyVv
zTi3ckZD8,&typo=1>
<2019-07-08 907 Dayton St - Permit Drawings.pdf>
<2019-07-08 907 Dayton St Permit Calcs.pdf>
36B17359DDC9304AB28604094FCD9D8D@ci.edmonds.wa.us
<B8AC54E5-B3D0-4D1E-A6DB-827B620621BD@chapmanprojects.com>
<DM5PR15MB1802E53830C16EBBC47BBE11B5F10@DM5PR15MB1802.namprd15.prod.outlook.com>
Carter, Eric
Carter, Eric
troy@chapmanprojects.com
troy@chapmanprojects.com
Internal
BT=1;II=<invalid>;SBMID=1;SBT=2;THA=3543129632;FIXUP=8.093;Version=Version 14.3 (Build 439.0), Stage=H8
EDMSVR-EXCH02.edmonds.local
10
https://barracuda.edmondswa.gov:443/cgi-mod/mark.cgi
1563470564-0932526c1251bc0001-IgVcN0
0B02DFF5012B480B02E142
Eric.Carter@edmondswa.gov
00000002/o=City of Edmonds/ou=Exchange Administrative Group (FYDIBOHF23SPDLT)/cn=Recipients/cn=Carter, Eric7ec
Carter, Eric
EX
/O=CITY OF EDMONDS/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=Carter, Eric7ec
Eric.Carter@edmondswa.gov
Carter, Eric
Here you go. See attached.
Sent from my iPhone
Begin forwarded message:
From: Ty Bartley <HYPERLINK "mailto:tbartley@fossatti.com"tbartley@fossatti.com>
Date: July 8, 2019 at 5:29:55 PM PDT
To: Troy Chapman <HYPERLINK "mailto:troy@chapmanprojects.com"troy@chapmanprojects.com>
Subject: RE: 907 Dayton St - Permit Drawings for 1st Floor
The exterior door header out of the kitchen is shown on S2.2 Roof framing plan. Called out as a 4x6.
There is no special detail needed for the header. I can add a header detail if you think the building department will like to see it, but header construction falls under the nailing
of IBC table 2304.10.01 as called out in the general notes.
Let me know if you want the detail added and I will resend in the AM.
Ty Bartley S.E.
Associate
1735 Westlake Ave N, Suite 205, Seattle, WA 98109
p 206.456.3071 x111 f 206.456.3076
HYPERLINK "https://linkprotect.cudasvc.com/url?a=http%3a%2f%2fwww.fossatti.com%2f&c=E,1,UK8ouXsDODZCUVHWn0XGpmdobpGUQ9sQPDFaUrB0s6o4Fp4j6DxQM0wKPiC0O6H54hym7FyGLHOIJ9Dshgp-tdEbg31GK8PzxKNxLxWANI9D&ty
po=1"www.fossatti.com
From: Troy Chapman <HYPERLINK "mailto:troy@chapmanprojects.com"troy@chapmanprojects.com>
Sent: Monday, July 8, 2019 5:22 PM
To: Ty Bartley <HYPERLINK "mailto:tbartley@fossatti.com"tbartley@fossatti.com>
Subject: Re: 907 Dayton St - Permit Drawings for 1st Floor
Hey Ty,
Thanks for these. It looks like the header alteration for the one exterior door to accommodate the new floor height was left off of these.
Do you have a typical header detail you can put in quickly? I urgently need to get this permit submitted so we can continue working/keep the guys going.
Thanks, Troy
Sent from my iPhone
On Jul 8, 2019, at 5:02 PM, Ty Bartley <HYPERLINK "mailto:tbartley@fossatti.com"tbartley@fossatti.com> wrote:
Troy,
Attached are the drawings and a page of stamped calculations stating the only work is to the 1st floor diaphragm. Please let me know if there is anything additional requested by the
building department.
Thank you,
Ty Bartley S.E.
Associate
<image001.jpg>
1735 Westlake Ave N, Suite 205, Seattle, WA 98109
p 206.456.3071 x111 f 206.456.3076
HYPERLINK "https://linkprotect.cudasvc.com/url?a=http%3a%2f%2fwww.fossatti.com%2f&c=E,1,xwXHvx_5hrnJ9QTEN1i7Gk7YE9kNtI2-UsuzsLeuJ4J6-9zoKg-rC38mhGsuRIsyMWmDNWMQvWgWWjXuKh-asYHt6NOyx-G1K3UyVvzTi3ckZD8
,&typo=1"www.fossatti.com
<2019-07-08 907 Dayton St - Permit Drawings.pdf>
<2019-07-08 907 Dayton St Permit Calcs.pdf>