Loading...
BLD2018-1622 Hwy 99 Edmonds Shoring Deferral Plan Review PC1.docx REVIEWWC3 Project #:City of Edmonds Project#: BLD2018-1622121 5th Ave. NEdmonds, WA 98020Phone: (425)771-0220 Attention: Subject: – 1stPlan Review Comments : West Coast Code Consultants, Inc. (WC3) has completed the review of the proposed project located in , . This review was based upon the following:Temporary Shoring Wall Plans dated 6/11/2019 by Ground Support, PLLC, sealed and signed by R. John Byrne, Registered Professional Engineer.Design Memorandum dated 06/05/2019 by Ground Support, PLLC, sealed and signed by R. John Byrne, Registered Professional Engineer. Sincerely, Attachment: Comments Plan Review CommentsProject Name: Location(s):, , GENERAL INFORMATION: The submitted documents for the above-mentioned project, as outlined in the cover letter, have been reviewed. The following comments address areas of concern, non-compliance with the governing code, potential errors, or omissions in the proposed design. The appropriate design professional must address each comment below and submit a written response in addition to revised plans and calculations if necessary. Please cloud any revisions made to the construction drawings and provide the date of the latest revision on each revised sheet. GENERAL COMMENTS: Please confirm the location of piles. Sheet SH4.0 detail SU3 appears to show the soldier pile extending beyond the property line. This is either not permitted or will require an easement related to the adjoining property owner. Please specify how foundation drainage which is shown on the building plans will be located on the podium property. If the soldier piles will stay after the construction of the foundation occurs, there appears to be no space provided for the drainage. This also may require an easement with the adjoining property owner. Please provide detailing if soldier piles will remain after the completion of the foundation, showing how damp proofing or water proofing will be applied. STRUCTURAL COMMENTS: Calculation: Page 3: Reference indicates AISC 360-05 is used. The current standard is AISC 360-10. Please verify that the design complies with current requirements. (IBC Chapter 35) Pages 6-11: Factor of safety indicates 1.2. The value may need to be 1.5. Please verify safety factor. (IBC 1807.2.3) Sheet SH1.1: Special inspections are required. Please provide statement of special inspections on the drawing, identifying the following: (IBC 1704.3.1) The materials, systems, components and work required to have special inspections The type and extent of each special inspection. The type and extent of each test. Additional requirements for special inspections or tests for seismic or wind resistance as specified in Sections 1705. For each type of special inspection, identification as to whether it will be continuous special inspection, periodic special inspection or performed in accordance with the notation used in the referenced standard where the inspections are defined. For steel special inspections, please provide requirements from AISC 360 Chapter N. (IBC 1705.2.1) Sheet SH3.A: Pile Schedule lower South Wall: Pile SL3, SL4 shows W14x22. Calculation page 5 shows W10x26. Please verify and confirm members change. (IBC 107) Pile Schedule West Wall: Pile W4 shows W21x111. Calculation of page 5 shows W21x122. Please verify and confirm member change. (IBC 107) Sheet SH4.0: Detail 1: Surcharge indicated appears low. Please verify that construction equipment (concrete trucks and outriggers) surcharge loads have been considered. Any fire lanes may also have loads from fire trucks and outriggers. Along GL-CA, it appears to have rockery loads. Please verify that all these loads and their associated distance away from the shoring have been considered. (IBC 1607.7, 1808.3.2) The Geotech’s report referenced is dated Feb. 28th 2018. That is not the latest version of the Geotech’s report. Please verify that the design complies with the current Geotech’s report. (IBC 107) Please clarify if drainage is required for the shoring. (IBC 1805.4) If you have any questions regarding the above comments, please contact at  or by phone at .