Loading...
BLD2018-1622 Hwy 99 Edmonds Shoring Deferral Plan Review PC2.docx REVIEWWC3 Project #:City of Edmonds Project#: BLD2018-1622121 5th Ave. NEdmonds, WA 98020Phone: (425)771-0220 Attention: Subject: –2ndPlan Review Comments : West Coast Code Consultants, Inc. (WC3) has completed the review of the proposed project located in , . This review was based upon the following:Revised Temporary Shoring Wall Plans dated 11/11/2019 by Ground Support, PLLC, sealed and signed by R. John Byrne, Registered Professional Engineer.Design Memorandum dated 06/05/2019 by Ground Support, PLLC, sealed and signed by R. John Byrne, Registered Professional Engineer.The , as adopted by , were used as the basis of our review. Specific comments regarding this project are enclosed with this cover letter. If you have any questions regarding this review, please contact me. Sincerely, Attachment: Comments Plan Review CommentsProject Name: Location(s):, , GENERAL INFORMATION: The submitted documents for the above-mentioned project, as outlined in the cover letter, have been reviewed. The following comments address areas of concern, non-compliance with the governing code, potential errors, or omissions in the proposed design. The appropriate design professional must address each comment below and submit a written response in addition to revised plans and calculations if necessary. Please cloud any revisions made to the construction drawings and provide the date of the latest revision on each revised sheet. GENERAL COMMENTS: Please confirm the location of piles. Sheet SH4.0 detail SU3 appears to show the soldier pile extending beyond the property line. This is either not permitted or will require an easement related to the adjoining property owner. 2nd Review:Please provide documentation demonstrating that easements or other approvals have been granted. Please see additional comments from the PW division. Resolved. Please provide detailing if soldier piles will remain after the completion of the foundation, showing how damp proofing or water proofing will be applied. 2nd Review: Please obtain easements and drainage review approval for drainage located within theright of way. provide documentation demonstrating that easements or other approvals have been granted. Please see additional comments from the PW division. STRUCTURAL COMMENTS: - S6. All structural review comments have been resolved. If you have any questions regarding the above comments, please contact at  or by phone at .