Loading...
BLDG COMMENTS 1 2008-0197.pdfEagle Eye Consulting Engineers, P.S. PO Box 523 Olalla, WA 98359 hoytjeter@centurytel.net 360 874 0562 Fax 360 874 0591 To: Theresa Umbaugh 121 5th Ave. N Edmonds, WA 98020 Re: Oliver Sunroom Addition 1201 8th Ave. S Edmonds, WA 98020. Plan Review # 2008-0197 EECE # EDM 08-23 Plan review number 01 Structure Stated Area S.F. Existing First floor 835 Existing Second floor 1042 Second floor 128 Total 2005 Deck Existing 457 DeckNew 45 rand total 2507 The above referenced project is in the process of plan review for compliance with Edmonds ordinances and applicable codes. The following comments, deficiencies/corrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back -check time. SCOPE OF REVIEW The scope of this review is for the Structural, Ordinance, Energy, Ventilations and Indoor Air Quality (V&IAQQ requirements of this project. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. Page 2of3 Plan Review Number 01 EECE#: EDm 08-23 Oliver Sunroom Addition 2008-0197 ORDINANCE COMMENTS Sheet A2.1 Floor and Roof Plans 1. Please note the window next to the door off the new deck to be safety glazed. It appears this is required based off the submitted plans. 8308.4 2. Please provide guard details for the upper floor deck. R312 STRUCTURAL COMMENTS Sheet S1.2 Structural Connection Details 3. Shearwall Schedule 10: Engineer of Record (EOR), please modify the plate washer to the adopted 2006 internationals codes. The code requires the late washer to be 3x3 and not 2x2. R602.11.1. and 113C 23 05.3.11 Sheet S2.1 Framing Plans 4. EOR, please specify the spacing of the lag bolts used at the ledger to support the floor deck framing. 5. EOR, please specify the required hanger to be used at the 2x10 joist noted for the second floor framing on this sheet. 6. EOR, please specify the required connections of the 2x10 roof rafter to the 4x12 header and the new 3-1.8X 12 glu-lam beam. It was not clear what would be used here to support the design loads. 7. EOR, please specify the required connection of the new 3-118X12 glu-lam beam to the supporting post. I was unable to determine this from the submitted information. 8. EOR, please specify the required connection of the new 4x 12 header beam to the supporting post. I was unable to determine this from the submitted information. 9. EOR, please specify the required connection of the new 4x10 header beam to the supporting post. I was unable to determine this from the submitted information. 10. Please specify on the plans the new location of the shear wall as per the shear wall schedule. Energy Comments 4 Page 3 of 3 Plan Review Number 01 EECE#: EDm 08-23 Oliver Sunroom Addition 2008-0197 Less then 750 square feet added to this structures and the new addition is in compliance with the state energy code. WSEC 101.3.2.1 exception. No comment at this time. V&IAQ Comments The new additions are less then 500 square feet and the whole house ventilation is not required to be updated. WSV&IAQC 101.3.1.1 No comment at this time. Additional corrections may be required following receipt of corrections and additional information as requested. Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, clarifications or additional corrections may be required subsequent to the Building Department plan review when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please contact Hoyt Jeter at (360) 874- 0562 between 8:00 a.m. and 5:00 p.m. By: Z�� Hoyt Jeter, P.E. President 3