Bldg Comments 2 (2007-0264).pdfo E� City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: February 26, 2008 TO: TGB Architects madains@tgbarchitects.com FROM: .fenny Readwin, Plans Examiner RE: Plan Check 9 2007-0264 Project: Legend Estates 4 Unit, Building 13 Project Address: 7805 218`x' Street SW During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the items below to Theresa Umbaugh, Senior Permit Coordinator. The numbering follows plan review comments dated May 4, 2007. 1) Ok except the site plan shows a detached garage, submit a separate permit application and plans for this building or remove from site plans. 2) Ok 3) Ok 4) Ok 5) Ok 6) Ok 7) Ok except your response references Sheet A2.01 but this sheet was not submitted. 8) Ok 9) Still outstanding. Building enclosure statement not acceptable see prior comment. 10) Still outstanding. Special Inspection and Testing Agreement form. 11) See attached structural comments from city consultant. Respond to each item in writing. Eagle Eye Consulting Engineers, P.S. PO Box 523 Olalla, WA 98359 �^ hoytjeter@centurytel.net 360 874 0562 Fax 360 874 0591 To: Theresa Umbaugh 121 5th Ane N Edmonds, WA 98020 Re: Legend Estates Condo Bldg B 7805 218th St SW Edmonds, WA 98026 Plan Review # 2007-0264 EECE # EDM 0805 Plan review number 01 Unit 1 Structure Stated Area S.F. First floor 112 Second floor 811 Third Floor 790 Total 1713 Garage 753 Total 2466 Deck Second floor 75 Deck Third floor 75 Grand total 2616 Unit 2 Structure Stated Area S.F. First floor 103 Second floor 808 Third Floor 787 Total 1698 Garage 751 Total 2449 Deck Second floor 85 Deck Third floor 85 Grand total 2619 Page 2 of 7 Plan. Review Number 01 EECEff: EDM 08-05 Legend Estates Condo Bldg B 2007-0264 Unit 3 Structure Stated Area S.F. First floor 103 Second floor 808 Third Floor 787 Total 1698 Garage 751 Total 2449 Deck Second floor 85 Deck Third floor 85 Grand total 2619 Unit 4 Structure Stated Area S.F. First floor 112 Second floor 811 Third Floor 790 Total 1713 Garage 753 Total 2466 Deck Second floor 75 eck Third floor 75 Grand total 2616 The above referenced project is in the process of plan review for compliance with Edmonds ordinances and applicable codes. The following comments, deficiencies/corrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back -check time. SCOPE OF REVIEW Page 3 of 7 Plan Review Number 01 EECE#: EDM 08-05 Legend Estates Condo Bldg B 2007-0264 The scope of this review is for the Structural only requirements of this project. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. Note engineer of record the drawings have information written in pencil and this must be in pen so it may not be erased. Please modify the drawings to have all information in pen. STRUCTURAL COMMENTS General 1. This building is not exempt from requiring structural analysis per IBC 2006. This analysis must be stamped by a licensed professional registered in the state of Washington. Please submit this upon response. (Please note some check analysis will be done but a complete analysis is not done for the review process and should be submitted by the licensed design professional) 2. Seismic analysis must be based off IBC. The seismic parameter maybe obtained for the USGS website. The Ss and Sms must be obtained from the USGS website based off either latitude and longitude or zip code or per the geotechnical report. ( Please note the geotechnical report gives seismic provision per IBC 2003 and not 2006) Resubmit analysis in compliance with the requirements. IBC 1613 and ASCE 7-05 12.8 http://eqLlhquake.usgs.gov/research/hazmqps/design/ 3. Please add to the requirements of IBC 1603. This clearly specifies what is required to be added on the construction documents. For example the Earthquake design data, wind design data, floor live data, etc. Please modify the construction documents accordingly. IBC 1603. 4. Design analysis submitted only applied the minimum wind load as per ASCE 7-05 6.4.2.1.1. ASCE 6.4.2. Based off the height and wind pressure the minimum appears not to control and the wind analysis per 6.4.2.1 will control. Please clarify upon the response. 5. Please add to the drawings a set of general notes stating what is being used for the materials. For example what is the required reinforcement, the concrete strength, wood stresses, etc? Without this information there is no way to complete the review. IBC 106 Sheet R0.10 Page 4of7 Plan Review Number 01 EECEM EDM 08-05 Legend Estates Condo Bldg B 2007-0264 6. Please modify the governing code to state the 2006 version of the code. 2003 is not the adopted code at this time. Sheet A8.00 Details 7. Engineer of Record, (EOR), please specify the required connection of the stair stringer on the drawings. I was unable to find where this information is specified. 8. EOR, provide analysis for the typical deck guard to support a 200 pound force applied at the top rails. The detail is not complete on how the railing will be connected and the 2x2 spaced @ 10" appear not to be able to support this force. Submit engineering analysis to justify what is specified to be used. Sheet S 1.00 Foundation Plan 9. The 2006 code required the anchor bolt washer to be a 3x3X.229. The drawings state 2x2 which his per the old adopted code. Please modify accordingly. IBC 2305.3.11 10. Architect of Record, (AOR), please resubmit analysis for the reinforcement steel to be of grade 40. There was not any foundation analysis in the submitted documents. Please submit this upon response. IBC 1801.2 11. Per check analysis it appear the SWI in the east -west directions will support the lateral forces as shown on the drawings. Submit analysis to justify. 12. Based off the length of the shear wall shown in the east -west direction will meet the minimum height to width requirements. Please submit analysis to justify. (Note this was scaled and the actual dimension should be specified) IBC table 2305.3.4 Sheet 52.00 Second Floor Framing Plan 13. The 2006 code required the anchor bolt washer to be a 3x3X.229. The drawings state 2x2 washers which his per the old adopted code. Please modify accordingly. IBC 2305.3.11 14. EOR, please provide a detail for the connections of the 5-114 PSL to the 8x8 supporting post. Nothing is specified at this time. 15. EOR, please specify the required hanger to support the PSL beams. Nothing is specified at this time. Page 5 of 7 Plan Review Number 01 EECE#: EDM 08-05 Legend Estates Condo Bldg B 2007-0264 16. EOR, please provide a detail for the 8x8 post supporting the 5-114 and 5-118 beams. The post is 7.5" wide and the beam width is smaller then this. How is this member being positively connected? All post to beam connections should be specified on the drawings. Detail 7 will not work in this case when the post is wider then the beam 17. EOR, please provide a detail for the 4x8 post supporting 5-118 beams. The post is 3.5" wide and the beam width is wider then this. How is this member being positively connected? All post to beam connections should be specified on the drawings. Note detail 7 on sheet 56.01 specifies a post cap. Submit analysis for this cap. 18. The code does not allow (2) 2x to be used in place if 3x member unless double the amount of anchor bolts are used and the nailing does not require 3 X only. Please modify accordingly. IBC 2305.3.11 19. EOR, please specify the species of glu-lam on the drawings. And submit analysis to justify the glu-lam specified. 20. EOR, please specify the required diaphragm nailing for this level with analysis to justify. This also should include the plywood thickness and diaphragm nailing. ASCE 12.10 21. EOR, please provide analysis for the cantilever 5-114X9-1/4 shown on the either end of the building. Partial load combinations should also be investigated for these members. ASCE 4.6 22. EOR, please provide analysis for the cantilever TiI floor joist shown on the either end of the building. Partial load combinations should also be investigated for these members. ASCE 4.6 Sheet 53.00 Third Floor Framing Plan 23. EOR, there is no information on either how the balcony will be supported and provide analysis. Please submit this upon the response. IBC 1604.8.3 and IBC table 1607.1 24. EOR, please submit analysis for the PSL beams specified on this sheet. Also the drawing should specify the required connections. (Please note the drawings have the beams written in pencil, when resubmitting please have this written in ink so it may not be field modified) Page 6 of 7 Plan Review Number 01. EECE#: EDM 08-05 Legend Estates Condo Bldg B 2007-0264 25. The 2006 code requires the anchor bolt washer to be a 3x3X.229. The drawings state 2x2 which his per the old adopted code. Please modify accordingly. IBC 2305.3.11 26. EOR, submit analysis for the A35 @22"OIC to transfer the shear forces. This was not submitted as this time. 27. EOR, the SWI in the stair way does not meet the minimum height to width rations. Please submit analysis to justify. IBC 23005.4 28. EOR, please specify the required diaphragm nailing for this level with analysis to justify. This also should include the plywood thickness and diaphragm nailing. ASCE 12.10 Sheet 54.00 Roof Framing Plan 29. EOR, please specify the required diaphragm nailing for this level with analysis to justify. ASCE 12.10 30. EOR, please note on the drawing the required design information for the trusses. This must be a deferred submittal and this information is required to be on the contract documents. IBC 106.3.4.2 31. EOR, please specify the required post to beam connections. It was not clear how this will be constructed based off the submitted drawings. 32. EOR, please provide a details for the required connections of the interior shear wall mark SWI at the stair framing. 33. EOR, the SW 1 in the stair way does not meet the minimum height to width rations. Please submit analysis to justify. IBC 23005.4 34. EOR, please analysis and specify the required collector elements to drag the lateral shear forces into the vertical resisting elements. There is a shear wall with any method to collect the lateral diaphragm forces. Please add this information's and provide analysis to justify. 35. EOR, please add to the drawings sheet G -I as noted in the roof framing notes 7. There is not a sheet G-1. Sheet 55.00 Upper Roof Framing Plan Page 7 of 7 Plan Review Number 01 EECE#: EDM 08-05 Legend Estates Condo Bldg B 2007-0264 36. EOR, please specify the required diaphragm nailing for this level with analysis to justify. ASCE 12.10 37. Based off the layout, the horizontal diaphragm appears it will not meet the required diaphragm ratios, please modify accordingly and clarify the vertical resisting lateral elements. 1BC 2305.2.3. 38. EOR, please add to the drawings sheet G-1 as noted in the roof framing notes 7. There is not a sheet G-1. Sheet 56.00 Structural Details 39. Detail 6: EOR, please clarify where this detail is being used. Also please add the required "A" dimension as noted. Sheet 56.01 Structural Details 40. Detail 7: Detail state 4x8 shall be used but the plans state 4x6. Please clarify which will be used and justify by analysis. 41. Detail 4: EOR, please complete the nailing reference noted in the detail The detail state "NAILING PER DET XISX.XX 42. Detail 10: EOR, please submit analysis for the A35 to resist the lateral loads of the manufactures truss supporting the horizontal diaphragm Please provide this information upon response. ASCE 12.14.7.5.1 ASCE 12.14.7.1 Additional corrections may be required following receipt of corrections and additional information as requested. Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, clarifications or additional corrections may be required subsequent to the Building Department plan review when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please contact Hoyt Jeter at (360) 874- 0562 between 8:00 a.m, and 5:00 p.m. Hoyt Jeter, P.E. President