DATE: October 13, 2005
TO: Michael Painter
PO BOX 3203
Lymiwood, WA 98046
FROM: Jenny Readwin, Plans Examine
RE: Plan Check # 05-446
Project: Emerson SFR
Project Address: 7211 Meadowdale Beach Rd.
During review of the above noted application, it was found that the following information,
corrections, or clarifications are needed.
1) Some information is missing from the site plan (i.e. covered porch, pergola, structure setbacks to
property lines, height calculation box -including covered porch, any easements, etc.). See
enclosed sample plot plan for minimum submittal requirements.
2) Provide reduced plot plan scaled 1"=20' on legal size paper or smaller, that matches the large
site plan for microfilming purposes.
3) It appears that rockeries or retaining walls will be needed on the site. Show location of any
proposed rockeries or retaining wails on the site plan with top and bottom wall elevations (see
enclosed handout).
4) Smoke detector is required in the den and office and in the hallway outside the rooms because
they have closets. Note on plans.
5) Show size and location of attic access.
6) Provide attic ventilation calculations per R806.
7) Provide letter from Geotechnical Engineer of record stating that they've reviewed the final
construction plans and they are consistent with their report recommendations.
8) Special inspections are required by the Geotechnical Engineer of Record for the following.
Complete the enclosed special inspection agreement signed by the owner, the general contractor
and the special inspector and submit to the City for approval prior to issuance��.
• Start of Work letter
• General site monitoring
• Excavation/grading/site preparation
• Trench drain construction
• Soil bearing verification
• Proof rolling
• Placement of fill and compaction
• Subsurface drainage installation
• Temporary and final erosion control
• Final letter from Geotech of Record
9) See attached structural comments from city consultant. Respond to each item in writing.
Please redline glans or submit two (2) sets of revised plans/documents (affected sheets only) with a
written response to each of the above items to a Permit Coordinator.
Page 2 of 2
Eagle Eye Consulting Engineers, PS
PO Box 523
Olalla, WA 98359
hoytjeter@centurytel.net
253 857-4151
Fax 253 857-5759
To: Edwin Baker
123 4th Ave. N
Edmonds, WA 98020
Re: Emerson Residence
7211 Meadowdale Beach Road
Edmonds
Plan Review # 05-446
Structure
Area S.F.
Lower floor
1560
Main floor
1588
Total
3148
Garage
576
Total
3742
av'd Patio
162
Porch
310
rand total
4196
EECE # ED 05-61
The above referenced project is in the process of plan review for compliance with
Edmonds ordinances and applicable codes. The following comments,
deficiencies/corrections must be addressed prior to completion of plans review and
subsequent issuance of permits.
Provide revised plans and calculations along with a written response to each of the items
listed below to facilitate a shorter back -check time.
SCOPE OF REVIEW
The scope of this review is far the Structural Only requirements of this project.
All features were checked only to the extent allowed by the submittals provided. All
portions of this project are assumed to meet or will meet other departmental requirements,
conditions and concerns before permit approval.
Project Name: Emerson Residence
Plan Review # 05-446
STRUCTURAL COMMENTS
General
Page 2 of 3
EECE # 05-61
1. EOR please clarify how the seismic factor was determined in the analysis. All it
states is use .143 times the weight then you increase it by 1.29%. How was this
determined? Please clarify on the response_
3. Geotechnical report states to use static fluid density of 60 PCF for long term
loading. Analysis used 42 PCF which is fine for the construction but please submit
analysis that when the structure is complete that it can resist the 60 PCF.
Sheet Al
4. Please provide detail on the drawing for the construction of the guards (guardrails).
They are required to resist a 200 pound horizontal force applied in any direction.
IBC 1607.7.1
Sheet A5
5. Please provide details on the framing of the 2d floor deck. All that is stated is the
member sizes. Are knee braces required at the column? How are the lateral loads
being transferred at this location? IBC 2304.9.7
6. EOR please clarify beam size call out at the deck. One beam is a 4X12 and the
other is 6X12 with the same span. It appears based off the drawing and the
analysis the larger beam is for the support of the spa. But how do you know the
spa will be placed on this side. The spa could be placed on either span. Also with
the different width beam, how are the members being connected at the center
column. Please either modify drawings accordingly.
7. Please provide details for the footing at the deck post. These are being placed on a
sloped surface.
Sheet S 1
8. Detail D. Geotechnical report recommends the interior footing shall be placed a
minimum of 12" below the finished grade. But this detail states 10". Please modify
accordingly.
Project Name: Emerson Residence Page 3 of 3
Plan Review # 05-446 EECE # 05-61
9. Detail D and C: The Geotechnical report states they recommend the strip footing to
be a minimum of 18" wide but this detail states 16". Please submit letter from
Geotechnical engineer that as detail this is acceptable.
Sheet S2
10_ Shearwall table exceeds the capacity set forth in table 2306.4.1 _ Please submit
analysis for Shearwall mark W6G and W4G. Gypsum wall board on one side and
plywood on other does not equal the sum of both capacities. See IBC 2305.3.8.
Additional corrections may be required following receipt of corrections and
additional information as requested.
Your plans are being reviewed concurrently with the Building Department, Fire
Department, Zoning Department and Public Works Engineering_ Changes,
clarifications or additional corrections may be required subsequent to the Building
Department plan review when comments are received from the other concerned
departments.
Should you have any inquiries regarding this letter, please contact Hoyt Jeter at
(253) 857-4151 between 8:00 a.m. and 5:00 p.m.
By:
Hoyt Jeter, P.E.
President