Loading...
Brackett's Corner - Traffic Impact Analysis Worksheet.pdf City of Edmonds Traffic Impact AnalysisWorksheet Brackett'sCornerRedevelopment Name of Proposed Project: Owner/ApplicantApplicant Contact Person: JacobLyon PrideVenturesLLC Name Name P.O.Box429 P.O.Box429 Street/Mailing Address Street/Mailing Address EdmondsWA98020 EdmondsWA98020 City State Zip City State Zip (425)775-1591 (425)-422-0053 Telephone: Telephone: Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): Lovell-Sauerland&Associates JeffreyTreiber Firm Name Contact Name (425)-775-1591 jefft@lsaengineering.com Telephone: E-mail: THRESHOLD LEVELS OF ANALYSIS Project Traffic Levels Sections to Complete I. Less than 25 peak-hour trips generated1 and 7 only (Worksheet/Checklist) II. More than 25 peak-hour trips generated All sections PROJECT DESCRIPTION 1. 8000212thSTSWEdmonds,WA98026 a.Location - Street address: (Attach a vicinity map and site plan.) CommercialandResidential b.Specify existing land use: 14singlefamilyresidences(18,241sf) c.Specify proposed type and size of development: (# of residential units and/or square footage of building) 1 of 5 Revised on 6/24/10 E82 - Traffic Impact Analysis Worksheet Page 3/2016-3/2017 d.Date construction will begin and be completed: Twopointsalong80thAvenueW.(Seecivilplans) e.Define proposed access locations: Approximately100ftfornorthern f.Define proposed sight distance at site egress locations: accessand50ftforsouthernaccess. TRIP GENERATION 2. Source shall be the Eighth Edition of the Institute of Transportation Engineers (ITE) Trip Generation manual. For independent fee calculations, the current edition of the ITE manual may be used. ADT = Average Daily Traffic PM Peak-hour trips (AM, noon or school peak may also apply as directed by the City Engineer) a. Existing Site Trip Generation Table: PM Peak-Hour Trips Land Use Daily (ADT) INOUT b.Proposed Project Trip Generation Table: PM Peak-Hour Trips Land Use Daily (ADT) INOUT c.Net New Project Trip Generation Table: PM Peak-Hour Trips Land Use Daily (ADT) INOUT d.State assumptions and methodology for internal, link-diverted or passby trips: 2 of 5 Revised on 6/24/10 E82 - Traffic Impact Analysis Worksheet Page TRIP DISTRIBUTION 3. Prepare and attach a graphic showing project trip distribution percentages and assignments. For developments that generate over 75 peak-hour trips, the City Engineer reserves the right to require 1 trip distribution to be determined through use of the City traffic model. SITE ACCESS ROADWAY/DRIVEWAYS AND SAFETY 4. a.Have sight distance requirements at egress location been met per AASHTO requirements? b.Intersection Level of Service (LOS) Analysis: Intersections to be evaluated shall be determined by the City of Edmonds Traffic Engineer Existing Conditions LOSDelays Year of Opening LOSDelays Five Years Beyond Change of LOSDelays Land Use c.Describe channelization warrants: (Attach striping plan.) d.Vehicle Storage/Queuing Analysis (calculate 50% and 95 % queuing lengths): 50 % 95 % Existing Conditions Year of Opening Five Years Beyond Change of Land Use e.If appropriate, state traffic control warrants (e.g. stop sign warrants, signal warrants): 2 f.Summarize local accident history (only required for access to principal and minor arterials): 1 Available upon request at City of Edmonds Development Services Department 2 Available upon request at City of Edmonds Police Department 3 of 5 Revised on 6/24/10 E82 - Traffic Impact Analysis Worksheet Page TRAFFIC VOLUMES 5. 1 Provide the following and other planned development traffic within the city. a.Describe existing ADT and peak-hour counts (less than two years old), including turning movements, on street adjacent to and directly impacted by the project. b.Describe the estimated ADT and peak-hour counts, including turning movements, the year the project is fully open (with and without project traffic). c.Describe the estimated ADT and peak-hour counts, including turning movements, five years after the project has been fully open (with and without project traffic). d.State annual background traffic growth factor and source: LEVEL OF SERVICE (LOS) ANALYSIS 6. a.Summarize Level of Service Analysis below and attach supporting LOS analysis documentation. Provide the following documentation for each arterial street or arterial intersection impacted by 1 ten or more peak-hour trips. Other City-planned developments must also be factored into the LOS calculations. LOSLOS Existing Conditions ExistingDelays Year of Opening With ProjectWithout Project Five Years Beyond Change of With ProjectWithout Project Land Use b.Note any assumptions/variations to standard analysis default values and justifications: 1 A list of planned developments are available at the City upon request for public records 4 of 5 Revised on 6/24/10 E82 - Traffic Impact Analysis Worksheet Page MITIGATION RECOMMENDATIONS 7. State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the Edmonds Road Impact Fee Rate Study Table 4 (attached) and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. X CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used. Units in Per Unit square feet, ITE Land Use Category Fee Fee Rate # of dwelling, vfp, etc. = $16,748.62 1,196.33 14units X New Use $ SingleFamily GeneralOffice(2)$1.81 $ 9,676.26 5,346sf = X Prior Use SingleFamily(1)$840.72+$840.72 1=$10,516.98 $ 6,231.64 1 -= New Use Fee: $Prior Use Fee:$ 16,748.62 10,516.98 NEW DEVELOPMENT Units in Per Unit square feet, ITE Land Use Category Fee Fee Rate # of dwelling, vfp, etc. = $ X New Use $ OTHER 6,231.64 $ MITIGATION FEE RECOMMENDATION: 200 INDEPENDENT FEE CALCULATION: $200.00 (+ consultant fee)$ TOTAL TRAFFIC IMPACT FEE $6,431.64 City of Edmonds, Engineering Division Approval Date 1 No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. 5 of 5 Revised on 6/24/10 E82 - Traffic Impact Analysis Worksheet Page 2009 - Impact Fee Rate Table EFFECTIVE 5/1/2010 3 of 4 Revised on 6/24/10 E82 - Traffic Impact Analysis Page 2004 - Impact Fee Rate Table EFFECTIVE 9/12/2004 4 of 4 Revised on 6/24/10 E82 - Traffic Impact Analysis Page Vicinity / Property Parcel Map th Lovell-Sauerland and Associates 8000212Street S.W. DrainageReport September, 2015 LSA No. 5537