Building Comments 1.pdfCity of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: February 23, 2018 TO: Monarch Trading Corporation monarchtcolp k email. com FROM: Chuck Miller, Plans Examiner chuck.miller(a-),,edmonmdswa. gov RE: Plan Check: BLD2018-0152 - I" review Project Address: 21940 Highway 99, Suite B Project: Patty's Eggnest type I hood Scope: Install type I hood/makeup air for commercial kitchen — nonseparated IBC 303.1.1 B occupancy group — 49 occupants — VB construction — NFPA 13 fire sprinkler system — fire suppression system under separate permit Please be advised that the building plans for the above referenced project have been disapproved for the purposes of obtaining a building permit. During a review of the plans by the Building Division for compliance with the applicable building codes, it was found that the following information, clarifications, or changes are needed. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments that require attention beyond the scope of this letter. A complete review cannot be performed until the revised plans/documents, including a written response in itemized letter format indicating where the `clouded' or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. Only those sheets specifically referenced as follows need to be resubmitted. Resubmittals must be made at the Development Services Department on the 2nd Floor of City Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm and from 8:30am-12pm on Wednesdays. On sheet M1.0 — Project Data — Site Plan / Roof Plan — Equipment Plan: 1. Floor Plan - Provide on the plans information regarding the proposed required equipment access per International Mechanical Code (IMC) 306.5. Details should include the access hatch and its location (or other means to be used) and the equipment access ladder (or other means to be used) and its location. On sheet M2.0 — Hood Plan — Hood Elevation — Shaft / Wrap Detail: 2. Front Elevation a. Clarify on the plans the indicated extent of the application of the specified material to be used as a field -applied grease duct enclosure. It does not comply with the requirements of IMC 506.3.11.2 or reflect that required by the manufacturer when evaluated in accordance with ASTM E 2336. b. Clarify on the plans the indicated function of the makeup air duct at the front of the Type I hood. c. Change on the plans the IMC reference regarding the canopy location from `507.12' to `507.4.1'. 3. Side Elevation a. Clarify on the plans the difference in the indicated model number, weight, voltage, `FLA', and RPM of `Fan #1' and of that specified on the `Front Elevation' and on the `Fan Information' on sheet `M3.0'. b. Clarify on the plans the difference in the indicated weight, horsepower, voltage, `FLA', and RPM of `Fan #2' and of that specified on the `Front Elevation' and on the `Fan Information' on sheet `M3.0'. c. Clarify on the plans the difference in the indicated size of the grease duct and of that specified on the `Front Elevation'. d. Change on the plans the IMC section reference regarding the clearance to combustibles of a grease duct from `506.3.10' to `506.3.11.1'. e. Clarify on the plans the indicated extent of the application of the specified material to be used as a field -applied grease duct enclosure. It does not comply with the requirements of IMC 506.3.11.2 or reflect that required by the manufacturer when evaluated in accordance with ASTM E 2336. f. Clarify on the plans the difference in the indicated size of the grease duct riser and of that specified on the `Front Elevation'. g. Change on the plans the IMC section references regarding the compensating makeup airflow from `506.3.10' and `507.4' to `508.2'. h. Change on the plans the IMC section reference regarding the mounting position of the grease filters from `507.11.2' to `507.2.8.2'. i. Change on the plans the IMCC section reference regarding the clearances for Type I hoods from `506.3.10' to `507.2.6'. j. Clarify on the plans the indicated type of material used to construct the `demising wall (existing)'. It does not appear to correspond with that completed under permits `BLD2015-0520'. The `existing' wall was constructed using 2x6 wood studs and requires that every portion of the Type I hood to be, at a minimum, 18 inches from the combustible construction unless a clearance to combustibles reduction method is utilized to reduce the required distance, or a wall framed with noncombustible materials may be installed per IMC 507.2.6 in front of the `existing' wall. k. Clarify on the plans the difference in the indicated model number of the Type I hood and of that specified on the `Front Elevation' and on the `Hood Information' on sheet `M3.0'. 1. Change on the plans the IMC reference regarding the canopy location from `507.12' to `507.4.1'. Page 2 of 3 4. Notes a. Note 12 — Change on the plans the IMC section reference regarding the operation of the Type I hood from `507.2.1.1' to `507.1.1'. b. Add to the list of provided notes on the plans information regarding the required label indicating the minimum exhaust flow rate in CFM per linear foot of hood based on the defined cooking appliance duty classification per IMC 507.2.1. c. Add to the list of provided notes on the plans information regarding the required `performance test' per IMC 507.6. On sheet M3.0 — Hood Detail Plan: Plan View a. Clarify on the plans the difference in the indicated model number of the Type I hood and of that specified on the `Hood Information' and on the `Front Elevation' on sheet `M2.0' . b. Clarify on the plans the difference in the indicated width of the Type I hood and of that specified on the `Section View' and on the `Side Elevation' on sheet `M2.0'. 6. Section View - Clarify on the plans the difference in the indicated model number of the Type I hood and of that specified on the `Hood Information' and on the `Front Elevation' on sheet `M2.0'. On sheet FW-1 — Fire Wrap Manufacturer Specifications/Install Manual: Eliminate from the plans the provided information regarding the installation of `3M Fire Barrier Duct Wrap 615' as a field -applied grease duct enclosure. The use of the product has not been evaluated in accordance with ASTM E 2336 by the manufacturer. Provide on the plans as part of a complete submittal updated/current manufacturers installation requirements for the use of `3M Fire Barrier Duct Wrap 615+' as a field -applied grease duct enclosure to guide proper installation and inspection. Regarding the provided `Seismic Bracing and Equipment Supports' information prepared by CJR Engineering: 9. Incorporate into the plans the specified construction for the support of the Type I hood and the makeup air unit to guide proper installation and inspection. The sheet(s) representing the details must be `stamped/sealed' by the project engineer per Revised Code of Washington (RCW) 18.43.070. Page 3 of 3