Building Comments 1.pdfCity of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: January 2, 2019 TO: Nancy Nygren Hoover Commercial Refrigeration nancy!1y.hcr(a), gmail.com FROM: Chuck Miller, Senior Plans Examiner chuck.miller(2edmondswa. gov RE: Plan Check: BLD2018-1602 — I" review Project Address: 22828 100th Avenue W Project: QFC walk-in freezer replacement Scope: Replace existing walk-in freezer and evaporator coil — Mercantile group M occupancy — NFPA 13 sprinkler system — plumbing, fire sprinkler, fire alarm, etc. under separate permits Please be advised that the building plans for the above referenced project have been disapproved for the purposes of obtaining a building permit. During a review of the plans by the Building Division for compliance with the applicable building codes, it was found that the following information, clarifications, or changes are needed. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments that require attention beyond the scope of this letter. A complete review cannot be performed until the revised plans/documents, including a written response in itemized letter format indicating where the `clouded' or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. Only those sheets specifically referenced as follows need to be resubmitted. Resubmittals must be made at the Development Services Department on the 2nd Floor of City Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm and from 8:30am-12pm on Wednesdays. On sheet 2 (as numbered by the plans examiner) — AD 1 OF 2: 1. Provide information from the manufacturer regarding the insulation values of the walk-in freezer walls, ceiling, and door for verification of that required per Washington State Energy Code (WSEC) C410.2, Item 3. 2. Indicate on the plans the required `strip' doors, curtains, or other method of minimizing infiltration at the doorway of the walk-in freezer when the door is open per WSEC C410.2, Item 2. 3. Indicate on the plans the method of providing the required insulation of the walk-in freezer floor per WSEC C410.2, Item 4. 4. Indicate on the plans the required lighting efficacy, or occupancy sensor controlling the operation, of the walk-in freezer lighting per WSEC 410.2, Item 11. Page 2 of 2