TO: Snohomish County Parks & Recreation
Logan Daniels, P.E., Parks Engineer
FROM: Chuck Miller, Plans Examiner
RE: Plan Check: DRC2017-0037
Project Address: 15433 75th Place W
Project: Meadowdale Beach Park and Estuary Restoration Design Project
Scope: Replace culvert under railroad tracks with bridge — restore/enhance stream
and estuary — improvements to park facilities
The following are the concerns regarding that portion of the above noted proposed scope of work
subject to the regulatory oversight of the City of Edmonds Building Division:
1. All work must meet the applicable provisions of the 2015 International Building Code (IBC)
and any other codes/standards referenced therein (i.e. Accessible and Usable Buildings and
Facilities — ICC Al 17.1-2009). Of particular concern are the `exterior accessible route' and
any amenities required to be `accessible' or be provided with `equivalent accommodations',
such as the beach access path, bench seating, and picnic tables, per IBC Chapter 11/ICC
Al 17.1-2009.
2. Grading, fill, and excavation must meet the applicable provisions of IBC Appendix J'.
3. Retaining walls over 4 feet in height (measured vertically from the finished grade at the
exposed toe of the retaining wall to the highest point of the wall), or supporting a surcharge,
must be designed by an engineer.
fit:°
i %, g;
PERMITTING & DEVELOPMENT
121 5th Avenue N
P: 425.771.0220
OPTION 1
❑ FORMAL PRE -APPLICATION MEETING
(SEE BACK PAGE)
$1,000.00 (1/2 will be applied toward the future
permit submittal)
Staff from the Building, Planning, Engineering and
Fire Departments attend the meeting, provide written
comments and answer questions regarding the
proposed! project. This meeting is encouraged for
major projects prior to a formal application submittal
to the City, The goal is to Identify MAJOR issues and
discuss processing procedures applicable to the
project.
Submit 1 set of plans with regyhydinf L_at1Qn per
page 2.
NOTE: PRE-APP Meetings are scheduled for the next
available date with a minimum of two weeks lead
time & DRC Meetings a minimum of one week.
OPTION 2
Rf DEVELOPMENT REVIEW COMMITTEE MEETING
Complementary, informal meeting
This is an informal opportunity to meet with staff
and discuss your preliminary ideas and concepts
for a project. The intent is to help identify the
major code requirements that will need to be
addressed and any significant site development
issues that may relate to the project. The intent is
for this to occur prior to considerable investment
in plans and/or design work. You may wish to
have your design professional(s) accompany you.
Submit 1 set of the following:
1) Site Plan
2) Vicinity Map
3) This completed form
4) Pertinent background information
5) Floor plans if applicable
6) List of questions regarding your proposed project
COMPLETE ALL REQUESTED INFORMATION
approx. 50 acres 27040500200100, 27040500200200, and
Zoning: R-9,600 Lot Size: (combined) Sno County Tax Account Parcel #: 00502900000500
Site Address(s): 15433 75th PI W, Edmonds, WA 98026 access via ADA ateK call Parks for access code)
Existing Use/Occupancy: Park and Tidelands
Pre -Submittal for: ❑ Building Permit Only [Z Land Use Approval/ Permit
Description of Project: The Meadowdale Beach Park and Estuary Restoration Design Project includes replacement of a
culvert under the railroad tracks with a bridge designed to pass flows and sediment, allow fish passage, and address
edestri'rran access safety issues; restoration and enhancement of the stream and estuary, an Improvements to park facilities.
Revised on 0110412017 Page 1 of 2
�' 1 q, 1 w
Development eyrieMeeting
Pertinent Background Information
Meadowdale Beach County Park is located at 6026 156th Street SW, Edmonds, Washington 98036.
The Park's main access is an earthen trail from the upper parking lot, accessed from 156th Street SW.
Americans with Disabilities Act (ADA) access is provided from 75th Place W in Edmonds. The 108-
acre Park consists of several parcels and is owned by Snohomish County with Snohomish County
Parks and Recreation as the custodial operator. The park extends from the rim of Lund's Gulch down
to tidelands at the northern end of Browns Bay on Puget Sound.
Snohomish County Parks and Recreation conducted a feasibility analysis and alternatives evaluation
in 2015 to develop a preferred conceptual design plan to address beach access, flooding,
maintenance, and fish barrier issues associated with sediment deposition within the 6-foot-wide
culvert for Lund's Gulch Creek under the BNSF railroad at Meadowdale Beach County Park. The
feasibility study addressed public safety issues involving the existing railroad crossintmproving
ADA access to the beach, and improving habitat conditions for salmon in the lower creek and creek
delta. The feasibility study included completion of numerous scientific and engineering studies and a
significant stakeholder review process, providing several opportunities throughout the process for
the community, local organizations and municipalities, tribes, permitting agencies, and BNSF to
provide input and comment. Separate meetings were held with BNSF and appropriate permitting
agencies to review the preferred alternative, which is now under design.
The proposed Meadowdale Beach Park and Estuary Restoration Design Project is intended to
address beach access, flooding, maintenance, and fish barrier issues associated with sediment
deposition within the 6-foot-wide culvert for Lund's Gulch Creek under the BNSF railroad at
Meadowdale Beach County Park. There arublic safety and ADA access issues involving the existing
railroad crossing, and there is a need to improve habitat conditions for salmon in the lower creek
and delta. The project would include replacement of the culvert with a bridge, restoration and
enhancement of the stream and estuary, and'improvements to park facilities. City of Edmonds staff
have attended stakeholder meetings and the City has been involved in the planning efforts to date. A
Development Review Meeting is requested at this time to further discuss the project, including
coordination of the necessary permits and approvals.
y.
Development Review Meeting
List of Questions Regarding Proposed Project
As shown on the Existing Conditions figure, the majority of the project lies within Snohomish County,
with a portion of the project falling within the City of Edmonds jurisdiction. Habitat restoration and
pedestrian access improvements that are planned within the park would occur within Edmonds city
limits. In addition, some improvements to the access road (75th Place West) would also occur within
the City of Edmonds. These improvements include roadway stabilization/addition of retaining walls
and resurfacing.
We would like to review the following topics and questions:
1. Review elements of the project that could occur within the City of Edmonds
2. Confirm the necessary permits and approvals:
- State Environmental Policy Act process coordination; confirm ability for City to adopt the
County's SEPA decision
- Shorelines and Critical Areas; confirm materials prepared for Snohomish County will meet
City's needs, or determine need additional information/site review
Grading, fill, and excavation -°.°.�
- Retaining walls .., ,,,. ,.. . J 1 1e*-,
- Haul road access
- Are there other approvals that need to be considered?
- Is there additional information on the necessary materials and expectations from the City
for the various permit applications?
3. Confirm stormwater approach and plan for coordination with utilities
4. Discuss the anticipated project schedule and confirm the anticipated permitting timeframe for
the City
LEGEND:
OHWM Wetland I Project Area
OHWM Buffer 1,MMON, Wetland Buffer Edmonds City Limits c h
--- Shoreline Zone
(aft
ANCHOR Existing Conditions and Critical Areas Overview
QEA `"'"" Meadowdale Beach Park Recreation and Habitat Improvements Project
�,.�
2\�,z§ �
\
y,
cm
M
m
Ll.
C:
LLJ
E
m
I
Proposed Railroad Bridge
PRECAST RIIMML
STEEL RILES
Proposed Railroad Bridge: Profile View
1 8" -2" FACE-TO-FACE OF PARAPETS
w_,1,0 PT.-1O 2T -1O" ai,-1d1* 1'-1
* o•4� b 7E EMT CAPS
'-8' MINIMUM VERTICAL CM
IOPOSED GRAVITY -BLOCK VALL
[STING BOX CULVERT TO BE REWWEO
DPOSEO GROUND LINE / 80TTOM OF CHANNEL
0.4
AV
tl
ell
. . . ........
-z 1.
C
CIF
U
Lai
C)
. . . ........
-z 1.
C
CIF
U
Lai
C)
CIF
U
Lai
C)
'2
t05
O�d
-2-zHz 19
2g
— --
— — — — — — —
.. YiLw
Hale-J — —
— j
---Mff.M
—AiraML
— — — — — -
A
AL
o
c m
dew A1luBlA
1331 NI31VDS
OOOb............_.OWZ 0
HINON
Ad bL
INS3 :3ounoS