Loading...
Building Comments.pdfCity of Edmonds DEVELOPMENT REVIEW MEETING COMMENTS BUILDING DIVISION DATE: September 7, 2017 TO: Snohomish County Parks & Recreation Logan Daniels, P.E., Parks Engineer FROM: Chuck Miller, Plans Examiner RE: Plan Check: DRC2017-0037 Project Address: 15433 75th Place W Project: Meadowdale Beach Park and Estuary Restoration Design Project Scope: Replace culvert under railroad tracks with bridge — restore/enhance stream and estuary — improvements to park facilities The following are the concerns regarding that portion of the above noted proposed scope of work subject to the regulatory oversight of the City of Edmonds Building Division: 1. All work must meet the applicable provisions of the 2015 International Building Code (IBC) and any other codes/standards referenced therein (i.e. Accessible and Usable Buildings and Facilities — ICC Al 17.1-2009). Of particular concern are the `exterior accessible route' and any amenities required to be `accessible' or be provided with `equivalent accommodations', such as the beach access path, bench seating, and picnic tables, per IBC Chapter 11/ICC Al 17.1-2009. 2. Grading, fill, and excavation must meet the applicable provisions of IBC Appendix J'. 3. Retaining walls over 4 feet in height (measured vertically from the finished grade at the exposed toe of the retaining wall to the highest point of the wall), or supporting a surcharge, must be designed by an engineer. fit:° i %, g; PERMITTING & DEVELOPMENT 121 5th Avenue N P: 425.771.0220 OPTION 1 ❑ FORMAL PRE -APPLICATION MEETING (SEE BACK PAGE) $1,000.00 (1/2 will be applied toward the future permit submittal) Staff from the Building, Planning, Engineering and Fire Departments attend the meeting, provide written comments and answer questions regarding the proposed! project. This meeting is encouraged for major projects prior to a formal application submittal to the City, The goal is to Identify MAJOR issues and discuss processing procedures applicable to the project. Submit 1 set of plans with regyhydinf L_at1Qn per page 2. NOTE: PRE-APP Meetings are scheduled for the next available date with a minimum of two weeks lead time & DRC Meetings a minimum of one week. OPTION 2 Rf DEVELOPMENT REVIEW COMMITTEE MEETING Complementary, informal meeting This is an informal opportunity to meet with staff and discuss your preliminary ideas and concepts for a project. The intent is to help identify the major code requirements that will need to be addressed and any significant site development issues that may relate to the project. The intent is for this to occur prior to considerable investment in plans and/or design work. You may wish to have your design professional(s) accompany you. Submit 1 set of the following: 1) Site Plan 2) Vicinity Map 3) This completed form 4) Pertinent background information 5) Floor plans if applicable 6) List of questions regarding your proposed project COMPLETE ALL REQUESTED INFORMATION approx. 50 acres 27040500200100, 27040500200200, and Zoning: R-9,600 Lot Size: (combined) Sno County Tax Account Parcel #: 00502900000500 Site Address(s): 15433 75th PI W, Edmonds, WA 98026 access via ADA ateK call Parks for access code) Existing Use/Occupancy: Park and Tidelands Pre -Submittal for: ❑ Building Permit Only [Z Land Use Approval/ Permit Description of Project: The Meadowdale Beach Park and Estuary Restoration Design Project includes replacement of a culvert under the railroad tracks with a bridge designed to pass flows and sediment, allow fish passage, and address edestri'rran access safety issues; restoration and enhancement of the stream and estuary, an Improvements to park facilities. Revised on 0110412017 Page 1 of 2 �' 1 q, 1 w Development eyrieMeeting Pertinent Background Information Meadowdale Beach County Park is located at 6026 156th Street SW, Edmonds, Washington 98036. The Park's main access is an earthen trail from the upper parking lot, accessed from 156th Street SW. Americans with Disabilities Act (ADA) access is provided from 75th Place W in Edmonds. The 108- acre Park consists of several parcels and is owned by Snohomish County with Snohomish County Parks and Recreation as the custodial operator. The park extends from the rim of Lund's Gulch down to tidelands at the northern end of Browns Bay on Puget Sound. Snohomish County Parks and Recreation conducted a feasibility analysis and alternatives evaluation in 2015 to develop a preferred conceptual design plan to address beach access, flooding, maintenance, and fish barrier issues associated with sediment deposition within the 6-foot-wide culvert for Lund's Gulch Creek under the BNSF railroad at Meadowdale Beach County Park. The feasibility study addressed public safety issues involving the existing railroad crossintmproving ADA access to the beach, and improving habitat conditions for salmon in the lower creek and creek delta. The feasibility study included completion of numerous scientific and engineering studies and a significant stakeholder review process, providing several opportunities throughout the process for the community, local organizations and municipalities, tribes, permitting agencies, and BNSF to provide input and comment. Separate meetings were held with BNSF and appropriate permitting agencies to review the preferred alternative, which is now under design. The proposed Meadowdale Beach Park and Estuary Restoration Design Project is intended to address beach access, flooding, maintenance, and fish barrier issues associated with sediment deposition within the 6-foot-wide culvert for Lund's Gulch Creek under the BNSF railroad at Meadowdale Beach County Park. There arublic safety and ADA access issues involving the existing railroad crossing, and there is a need to improve habitat conditions for salmon in the lower creek and delta. The project would include replacement of the culvert with a bridge, restoration and enhancement of the stream and estuary, and'improvements to park facilities. City of Edmonds staff have attended stakeholder meetings and the City has been involved in the planning efforts to date. A Development Review Meeting is requested at this time to further discuss the project, including coordination of the necessary permits and approvals. y. Development Review Meeting List of Questions Regarding Proposed Project As shown on the Existing Conditions figure, the majority of the project lies within Snohomish County, with a portion of the project falling within the City of Edmonds jurisdiction. Habitat restoration and pedestrian access improvements that are planned within the park would occur within Edmonds city limits. In addition, some improvements to the access road (75th Place West) would also occur within the City of Edmonds. These improvements include roadway stabilization/addition of retaining walls and resurfacing. We would like to review the following topics and questions: 1. Review elements of the project that could occur within the City of Edmonds 2. Confirm the necessary permits and approvals: - State Environmental Policy Act process coordination; confirm ability for City to adopt the County's SEPA decision - Shorelines and Critical Areas; confirm materials prepared for Snohomish County will meet City's needs, or determine need additional information/site review Grading, fill, and excavation -°.°.� - Retaining walls .., ,,,. ,.. . J 1 1e*-, - Haul road access - Are there other approvals that need to be considered? - Is there additional information on the necessary materials and expectations from the City for the various permit applications? 3. Confirm stormwater approach and plan for coordination with utilities 4. Discuss the anticipated project schedule and confirm the anticipated permitting timeframe for the City LEGEND: OHWM Wetland I Project Area OHWM Buffer 1,MMON, Wetland Buffer Edmonds City Limits c h --- Shoreline Zone (aft ANCHOR Existing Conditions and Critical Areas Overview QEA `"'"" Meadowdale Beach Park Recreation and Habitat Improvements Project �,.� 2\�,z§ � \ y, cm M m Ll. C: LLJ E m I Proposed Railroad Bridge PRECAST RIIMML STEEL RILES Proposed Railroad Bridge: Profile View 1 8" -2" FACE-TO-FACE OF PARAPETS w_,1,0 PT.-1O 2T -1O" ai,-1d1* 1'-1 * o•4� b 7E EMT CAPS '-8' MINIMUM VERTICAL CM IOPOSED GRAVITY -BLOCK VALL [STING BOX CULVERT TO BE REWWEO DPOSEO GROUND LINE / 80TTOM OF CHANNEL 0.4 AV tl ell . . . ........ -z 1. C CIF U Lai C) . . . ........ -z 1. C CIF U Lai C) CIF U Lai C) '2 t05 O�d -2-zHz 19 2g — -- — — — — — — — .. YiLw Hale-J — — — j ---Mff.M —AiraML — — — — — - A AL o c m dew A1luBlA 1331 NI31VDS OOOb............_.OWZ 0 HINON Ad bL INS3 :3ounoS