Building Special Inspection.pdfPrior to issuance of a permit, this form must be completed in its entirety and returned to the City for
approval. The completed form must have signatures of acknowledgment by all parties.
DUTIES AND RESPONSIBILITIES
Special Inspection Firm and Special Inspectors:
The Special Inspection firm of ''�"i e "5 - �.� .,� C 1-�� p?' will perform special
inspection for the following types of work (separate forms must be submitted if more than one firm is to be
employed):
Structural Fill
Welding
All individual inspectors to be employed on this project will be WA -130 certified for the type of work they are to
inspect. If inspection is for work that is not covered by the WABO categories, or the inspector is not WA -BO
certified, a detailed resume of the inspector and firn-i must be submitted. The resume must show that the
inspector and the firm are qualified by education and experience to perform the work and testing required by the
project design and specifications.
The work shall be inspected for conformance with the plans and specifications approved by the City. Revisions
and addenda sheets will not be used for inspection, unless they have been approved by the City. Inspection
records shall include:
A daily record to be maintained on site, itemizing the inspections performed. Any nonconforming work
shall be brought to the immediate attention of the contractor for resolution.
A weekly report shall be submitted to the City; detailing the inspections and testing performed, listing
any nonconforming work and resolution of nonconforming items.
A final report shall be submitted to the building department prior to the Certificate of Occupancy being
issued. This report will indicate that inspection and testing was completed in conformance with the
approved plans, specifications and approved revisions or addenda. Any unresolved discrepancies must
be detailed in the final report.
Contractor:
The contractor shall provide the special inspector or agency adequate notification of work requiring inspection.
The City approved plan and specifications must be made available, at the jobsite for the use of the special
inspector and the City inspector. The contractor shall maintain all daily inspection reports, on site, for review by
all parties.
The special inspection functions are considered to be in addition to the normal inspections performed by the City
and the contractor is responsible for contacting the City to schedule regular inspections. No concrete shall be
poured or other work covered until approval is given by the City inspector.
\\EDMSVR-DEPTFS\Building\llandouts Information by Chud6inspections\special inspection and testing agreement COE.doe4/11/2013
hlw o`t�v �„Iwd:an✓ 0!c olllv1(, phws. Vic COY mspcohil )aH be
, h'wG J'J'/ 8 ffwAmns Oao. sllws;Olc" (d spc',I,'d
Tlw %olmjo-A Yifld/ol v6il
O -w MI )r:qukd C)Y
N i i v ,, bun
Y))�",
at (,i hw �mh,�, ot, dic ~qwcial unspector or
JM, MW �WY
v, 1o 1/, al Cil I offlb:�
�sh'n mvL/(: lye ml loo In in irl a
oc w 1 n
vl; dw J J,%Pf
Datc, q ( (,3,
ol,
C)+{:; ", I
h�chm du11 t)),0