Loading...
Building Structural Comments 2.pdf April 28, 2010 Ann Bullis, CBO Building Official City of Edmonds th 121 5 Avenue North Edmonds, WA 98020-3145 Subject: Holy Rosary Parish (Structural Only Review) Address: 760 Aloha Street, Edmonds, WA 98020 Permit: 2010-0013 Per your request, Beck & Associates has completed a review of second structural only the drawings and calculations for conformance with the 2006 International Building Code (IBC), as adopted and amended by the State of Washington and the City of Edmonds. Our review of the plans and calculations indicates that corrections are necessary prior to permit issuance. The applicant should address the following comments in itemized letter format in addition to making corrections & revisions to the drawings. _______________________________________________________________________ Legend: Plain text = initial comment Blue text = additional comment in response to the resubmittal Lock Block Retaining Wall 1) This item remains to be addressed. While the geotechnical engineer and I had a telephone conversation about the approach, a formal written response is required to be provided. Retaining walls are required to be designed considering a safety factor of 1.5 against sliding and overturning. The current design provides a factor of safety of 1.1 against sliding and 1.3 against overturning. The design of the Lock Block Retaining wall should be revised utilizing the required safety factors. IBC 1806.1 S2.2 – Main Floor Framing Plan 14) Provide detailing for the connection of the S/HD15B holdowns to the WF beams below. Provide calculations to justify the design. Reference grid N. The SW3 shear walls and associated holdowns from above are supported by the framing at the Main Floor level. The calculated holdowns are shown along the grid Q shear line in lieu of the grid N shear line. Provide an analysis for framing along grid N that supports the shear walls and overturning holdowns from above. Permit 2010-0013 April 28, 2010 Page 2 of 2 Please contact me should you have any questions or require clarification on any of the items contained in this letter. Respectfully, Douglas Beck, PE, SE Beck & Associates, PLLC