Loading...
Buildingcomments2.pdffar EDS City Of Edmonds PLAN REVIEW COMMENT'S BUILDING DI"SION �St, rs9° (425) 771-0220 DATE: March 20, 2007 TO; Terri (Murphy) Gietzen and Daniel .Gietzen murphyts@comcast.net FROM: Jenny Readwin, Plans Ex= e RE: Plan Check # 2006-1215 Project: Addition Project Address: 8715 Talbot Rd. During re -review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plansldocurnents (affected sheets only) with a written response to each of the items below to a Permit Coordinator. 1) 3120107 Still need both proposed covered porches labeled Label both proposed covered porches on the site plan and outline the second floor addition as well. 2) Ok 3) Ok 4) 3120107 Still need ventilation calculations and vent locations on the plans for this area. Provide crawlspace ventilation calculations for small crawlspace area under the stairs and show size and location of crawlspace vents on foundation plan. 5) 3120107 still need all detail call outs referenced at their location on the plans. Reference all details to their location on the plans. Cross out any details that do not apply to this project. 6) Ok 7) 3120/07 On sheet 6 specify what beam is to be used for beam A. Structural calculations provided call out 5118 x 9: Note on plans. Provide calculation for header in the master bath that is carrying a point load from the girder truss. There are also point loads on two of the main floor bedroom headers, Provide calculation for these as well. 8) 3120107 Specify what beam is to be used for beam R. Structural Calculation provided call out 5 118 x 16 !. Note on plans. Revise beam calculation for beams A, C and E to show that all point loads were accounted for. 9) 3120107 G was removed off the plans but now nothing is specified for beam F. Please add this to the plans with supporting calculations. Provide beam calculation for beam marked G (nothing was specified on the plans). 10) 3120/07 Point load from ridge was removed. Please clarify how all loads are being carried to bearing at this area (Ridge, beams, etc). Plans are not clean Provide beam calculations when necessary. Provide calculation for double floor joist in master bedroom with point loads from headers above. 11') Ok 12) Ok 13) Ok 14) Ok 15) 3/20/07 Still need. No Response givenand now all shearwall, holdown, drag strut, etc. in is missing off the new plans Please re -add all applicable information to the plans. Specify how interior SW -1 in the garage is carried to bearing. According to the foundation plan there is no foundation support under this wall. Please clarify. 16) 3/20/07. Will need prior to permit issuance. Special inspections are required for the following. Complete the enclosed special inspection agreement signed by the owner, the general contractor and the special inspector and submit to the City for approval prior to issuance. • Epoxy anchor bolts and holdowns Page 2 of 2