Burleigh Eng Final SP Approval.pdf
CITY OF EDMONDS
ENGINEERING DIVISION
Date:
March 7, 2017
To:
Jen Machuga, Planner
From:
JoAnne Zulauf, Engineering Technician
Subject:
PLN20150047, Burleigh - Final Plat
nd
22930 102 Pl W 4 lot Short Plat
The Engineering Division has found that the subject 4-lot short plat meets the requirements
established for civil subdivision improvements in accordance with Edmonds Community
Development Code (ECDC) 20.75.
Preliminary plat approval was issued by the Planning Division on January 29, 2016 and
included engineering conditions of approval in Attachment 12 of the staff report.
Civil construction plans were submitted to the Engineering Division on March 17, 2016
consistent with the conditions of approval and ECDC 20.75.120. The plans were approved
for construction on May 20, 2016. While most of the improvements have been installed and
inspected, the plat construction has yet to be completed in its entirety. On February 28, 2017,
the Engineering Division received a Performance Bond in the amount of $48,516.00 reflecting
the total cost to construct the remaining improvements consistent with ECDC 20.75.130.
Consistent with ECDC 18.30.090, a permanent access easement has been granted to the City
of Edmonds for access to the private stormwater facility located on Lot 4. Access is for
inspection purposes to ensure that stormwater facilities are properly operated and maintained
in accordance with City of Edmonds Code.
The subject development did not include street dedications to the City.
City of Edmonds