Loading...
BW_PDF_PLN20190062.pdfaw" 1 /4 OF NW 1 /4, SEC. 29 TWP. 27N, RGE. 4E., W.M. o� 1" = 20' 1' COUNTOUR INTERVAL 10' 0' 10' 20' FOUND MON. NO CASE IRON PIN DOWN 0.9' LOT COVERAGE UNIT 1 - TOTAL AREA = 2318 SF BUILDING & ASPHALT AREA = 913 SF UNIT 2 - TOTAL AREA = 1343 SF BUILDING & ASPHALT AREA = 915 SF UNIT 3 - TOTAL AREA = 1343 SF BUILDING & ASPHALT AREA = 921 SF UNIT 4 - TOTAL AREA = 2251 SF BUILDING & ASPHALT AREA = 932 SF VICINITY MAP Q 212TH ST SW F- � 3 EDMONDS �' HIGH SCHOOL a Al 215TH ST SW 3 SITE - a-z 0 216TH ST SW r 216TH ST SW SWEDISH/EDMONDS HOSPITAL 218TH STSW zl� SITE INFORMATION SITE ADDRESS: 7528 215TH ST SW EDMONDS, WA 98026 TAX PARCEL NO. 00501200001600 240A G TOTAL SITE AREA: 10,245 SQ. FT. OR 0.24 ACRES MORE OR LESS. z ZONING: RM-2.4 = MULTI -FAMILY RESIDENTIAL Q J 4 PROPOSED DWELLING UNITS UNIT LOT SUBDIVISION � Q - p= S BASIS OF BEARINGS PROFF" NAD83 CORS (CONSTANT OPERATING REFERENCE STATIONS) USING VRS PROCEDURES. BEARING = NORTH 87'57'41" WEST AS MEASURED BETWEEN THE THE INTERSECTION MONUMENT AT 73RD PL W & 215TH ST SW O AND THE INTERSECTION MONUMENT AT 76TH AVE W & 215TH ST SW a W LEGAL DESCRIPTION w w z E­4 QN LOT 16, LUSCHEN'S TRACTS DIVISION NO. 2, ACCORDING TO THE p R! O PLAT THEREOF RECORDED IN VOLUME 17 OF PLATS, PAGE 21, 0-4 Q pp RECORDS OF SNOHOMISH COUNTY, STATE OF WASHINGTON Cr O O 00 � 3 VERTICAL DATUM Q w NAVD88 CORS (CONSTANT OPERATING REFERENCE NETWORK) USING CPS VRS PROCEDURES. ALL ELEVATIONS SHOWN ARE RELATIVE TO THE SITE BENCHES j SITE BENCHMARK 1 = TOP OF MONUMENT IN CASE AT THE INTERSECTION 76TH AVE W & 215TH ST SW ELEVATION = 412.81' W Z SITE BENCHMARK 2 = MAG NAIL IN ASPHALT AT ACCESS DRIVEWAY W a `� TO 7528 215TH ST SW ELEVATION = 405.87' O O N LEGEND- 0 SET 1/2" X 24" REBAR & CAP LS 30444 Z 0 FOUND MONUMENT 1 1/2" DOMED BRASS W/X oil FOUND MONUMENT IN CASE O �p FOUND MAC NAIL Z WATER VALVE WATER METER YARD LIGHT ^ U� � � w 0 STORM DRAIN CATCH BASIN, TYPE 2 L■J STORM DRAIN CATCH BASIN, TYPE 1 O 0 SEWER MANHOLE O � NOTES THIS MAP IS A REPRESENTATION OF THE F--� CONDITIONS AT THE TIME THE FIELD SURVEY WAS PERFORMED. r , PRECISION OF CONTROL TRAVERSE IS AT HIGHER LEVEL THAN MINIMUM STANDARDS. Q REQUIRED BY WAC 332-130-090. FIELD SURVEY CONDUCTED USING A COMBINATION RECEIVED Z' OF CPS USING THE WASHINGTON STATE REFERENCE xj NETWORK (WSRN) AND/OR A 5 SECOND DIRECT READING TOTAL STATION. C1=C O 3 ZO19 Q METHOD: CPS, TRAVERSE AND RADIAL SURVEY. w _v ELOPMENT SERVICES COUNTER ~ w � O �i U SHT. 1 OF 1 JOB NO: 19-85