CA_geotech_report.pdfGary A. Flowers, P'LLC
Geological & Geotechnical Consulting
1953212th Avenue NE
Shoreline, WA 98155-1106
August 1.4, 2012
Project No. GF05079
,.
Mike & Anne Meiers
1901694 1h Ave West RECEIVED
Edmonds, WA 98026
Subject: Critical Area Report AUG10
Meiers Residence/City of Edmonds R -O -W ^NEVE, M OPM 11. S RVIOTS
19016 94th Ave West �: 0U N � E1`1
Edmonds, Washington
Dear Mike & Anne:
This report presents information required by the City of Edmonds for construction or
development projects to be located within a defined geologically hazardous area as per the
Edmonds Critical Area Code. Mitigation of the landslide that occurred on your property and the
City of Edmonds right-of-way for 190th Place SW during December 2007 will occur within a
defined geologically hazardous area for both erosion hazard and landslide hazard. As such a
Critical Area Report is a code requirement prior to issuance of a construction permit for the
mitigation to occur. Documents reviewed for this study include reports by HWA GeoSciences,
Inc. dated February 17, 2004, September 21, 2004 and November 22, 2004, the published
geological map of the area titled "Geologic Map of the Edmonds East and part of the Edmonds
West Quadrangles, Washington" by Minard, 1983, and the Edmonds Municipal Code, Chapter
23.80, Geologically Hazardous Areas.
Existing Conditions
Previous studies on the subject slope area by this firm and by HWA GeoSciences, Inc, consultant
to the City of Edmonds, have determined that the overall slope angle of the subject site is on the
order of 1 H:1 V (horizontal to vertical) and is greater than 10 feet in height. As such, as per the
city code it is defined as a landslide hazard area.
Due to the steeply sloping site and the presence of Alderwood and Alderwood/Everett series soil
the site is also defined as an erosion hazard area.
The subject site is not considered to be a seismic hazard area as the core of the slope is
comprised of glacially consolidated sediments.
Gary A. Flowers, PLLC.
19532 12'h Avenue NE Shoreline, Washington 98155-1106 206-417-7640
Meiers Property Geological/Geotechnical Assessment
Edmonds, Washington
Background
On December 6, 2007 the landslide was reconnoitered by personnel from this firm. The slide
scarp is 40 to 45 feet wide at the top, narrows to about 25 feet at the bottom and extends from the
top of the slope to the bottom of the slope along 190th Place SW. The headwall scarp at the top
of the slide ranges from 3 to 5 feet high. Overall slope height is approximately 25 feet. The
slide scarp extends about 10 feet into the backyard area beyond the original top of slope.
Debris run out from the landslide area was observed to extend across the roadway at the toe of
the slope, down the roadway embankment, across a portion of the adjacent property to the
northwest and pooled against a driveway embankment for an adjoining property. This covers a
distance in excess of 100 feet and indicates that the soils were saturated and flowed down the
hillside as a mud flow or debris flow event.
Soils exposed in the slide scarp include 6 to 10 feet of fill soils comprised of gray, silty sand with
gravel. This fill was likely placed at the time of the original house construction. Underlying the
fill soils an 8 to 12 inch thick layer of relic topsoil was observed. These soils were in a loose to
medium dense condition. Beneath the relic topsoil an approximate 3 foot thick layer of medium
dense, brownish -gray silty sand to sandy silt was observed. This material is interpreted to be
Vashon age recessional glacial drift. Underlying the glacial drift dense, gray, silty sand with
gravel was observed. This material is interpreted to be Vashon age glacial till.
The inclination of the landslide scarp can be broken down into five distinct areas. The exposed
scarp headwall at the top of the slope is about 80° or near vertical. The next approximate 10 feet
of scarp is inclined at 28° to 30°. These two areas are fully within the fill soil zone on the slope.
At this point there is an oversteepened nick point that is only about 3 feet tall but is inclined at
55° to 60°. This nick point is immediately above the noted seepage zone on the slope and
includes the base of the fill slope, the relic topsoil layer and the top of the glacial drift layer. At
the base of the nick point is a scoured area that is 12 to 18 inches deep, 2 to 4 feet wide and
extends about 6 feet down the slope entirely within the recessional glacial drift. The area below
the nick point and within the glacial drift soils is inclined at 22° to 28°. Near the contact with the
glacial till, and immediately above the roadway, the slope inclination increases to 40°. A cross
section down the landslide scarp is attached as Figure 1.
The published geological map of the area titled "Geologic Map of the Edmonds East and part of
the Edmonds West Quadrangles, Washington " by Minard, 1983, indicates that the slope is
located close to a contact between glacial till and advance outwash. Our findings indicate that
glacial till is present underlying the fill. The glacial drift sediments observed overlying the till
are likely a recessional drift unit. Our findings are in agreement with the published geology map
of the area.
Linear cracks in the ground at the top of the slope were observed along a portion of the top of
slope adjacent to the concrete driveway and the trellis work on the north side of the house. The
Gary A. Flowers, PLLC.
1953212 Ih Avenue NE Shoreline, Washington 98155-1106 206-417-7640
2
Meiers Property Geological/Geotechnical Assessment
Edmonds, Washington
cracks were on the order of 8 to 12 feet long and about I/2 inch wide. The slope along this area is
very steep but only about 10 feet tall.
Ground water was observed seeping from the silty sand to sandy silt glacial drift soils that
overlie the glacial till soils. This seepage zone is near the midpoint of the slope. Supersaturated
soil was observed oozing from several mountain beaver holes adjacent to the landslide scarp and
within the glacial drift soils.
During previous reconnaissance of the slope no evidence of ground water seepage or hydrophilic
vegetation was ever observed.
Geological Hazards Assessment
Soil characteristics for the steep slope are defined above based on our reconnaissance of the
landslide scarp in 2007 which exposed the soils throughout the slope face. These soils consist of
fill soils overlying recessional glacial drift soils overlying glacial till soils.
At the base of the slope a series of three (3) exploration borings were drilled and sampled in
January 2012. The borings were located within the asphalt roadway of 190th Place SW. A copy
of the borings is attached in the Soldier Pile Wall Design Memorandum dated May 18, 2012.
These borings encountered 3 to 11 feet of fill soils overlying dense glacially consolidated soils
(glacial till and advance outwash deposits).
Across 190th Place SW from the project site is another steep slope area. This steep slope
includes the roadway embankment for the street. To the best of our knowledge this steep slope
area has not been impacted by any landslides other than the debris runout from the Meier's slide
that flowed across the street and down this steep embankment.
Both of the steep slopes (above and below 190th Place SW) are heavily vegetated and not subject
to erosion under normal conditions. No ground water seepage has been observed on the subject
slope or the nearby embankment slope except immediately following the landslide in 2007. No
ground water seepage has been observed within 200 feet of the subject site. No known or
recorded landslides are located within 200 feet of the subject site. The core of the slope is
comprised of glacially consolidated sediments which are known to have a slope stability factor of
safety greater than 2 for static conditions and greater than 1.2 for pseudostatic conditions. Fill
soils near the top of the Meiers' slope and fill soils within the roadway embankment will have a
lower factor of safety. Modeling of the slopes to determine actual stability factors of safety are
not considered to be necessary for this project as the purpose of the project is to construct a
soldier pile wail to stabilize the slope above the roadway. Construction of the wall will not have
any adverse impact to the steep slope below the roadway and will protect the lower slope area
from any future landslide runout.
Gary A. Flowers, PLLC.
19532 12i6 Avenue NE Shoreline, Washington 98155-1106 206-417-7640
3
Meiers Property GeologicallGeotechnical Assessment
Edmonds, Washington
As per EMC Chapter 23.80, Part IV, Development Standards in Geologically Hazardous Areas,
22.80.060 Development standards, alterations of geologically hazardous areas or associated
buffers may only occur for activities that 1) will not increase the threat of the geological hazard
to adjacent properties beyond predevelopment conditions; 2) will not adversely impact other
critical areas; 3) are designed so that the hazard to the project is eliminated or mitigated to a level
equal to or less than predevelopment conditions; and 4) are certified as safe as designed and
under anticipated conditions by a qualified engineer or geologist, licensed in the state of
Washington.
The project, i.e. construction of a soldier pile wall at the toe of the subject slope, meets all of the
above requirements.
As per EMC 22.80.070, Development Standards for Specific hazards a buffer shall be
established from all edges of landslide and erosion hazard areas. Alterations of an erosion or
landslide hazard area or buffer may only occur for activities for which a hazards analysis is
submitted and certifies that 1) the development will not increase surface water discharge or
sedimentation to adjacent properties beyond predevelopment conditions; 2) the development will
not decrease slope stability on adjacent properties, and 3) such alternations will not adversely
impact other critical areas.
The soldier pile wall construction meets all of the requirements for this code section and will be
placed within the hazard area.
In addition, the proposed development does not decrease the factor of safety for landslide
occurrences below the limits of 1.5 for static conditions and 1.2 for pseudostatic or dynamic
conditions and in fact dramatically increases these factors of safety for the subject slope.
Construction is anticipated to be completed prior to the October 1 deadline for dry season
grading. Vegetation will only be removed in the area of the planned wall construction and
backfilling. Backfill will primarily be quarry spalls which have no potential for erosion.
Drainage from behind the wall will be placed into the city storm water system via a catch basin
located about 20 feet from the end of the soldier pile wall. Drainage will in no way promote
erosion or increase saturation of the slope.
CONCLUSIONS AND RECOMMENDATIONS
The project as planned and designed meets all the requirements of the Edmonds Municipal Code
for construction in geologically hazardous areas and should proceed as planned.
Gary A. Flowers, PLLC.
19532 121' Avenue NE Shoreline, Washington 98155-1106 206-417-7640
4
Meiers Property Geological/Geotechnical Assessment
Edmonds, Washington
Thank you for the opportunity to be of service on this project. Should you have any questions
regarding this matter, please do not hesitate to contact our office.
Sincerely,
A 'Y a
Gary A. Flowers
Gary A. Flowers, P.G., P.E.G.
Principal Engineering Geologist
Attachment: May 18 Wall Design Memorandum and Exploration Logs
Gary A. Flowers, PLLC.
19532 12°i Avenue NE Shoreline, Washington 98155-1106 206-417-7640
Gary A. Flowers, PLLC
19532 12th AvenueLTE
Shoreline, WA 98155-1106
May 18, 2012
Project No. 05079
To: Anne and Mike Meiers
Phil Williamson — City of Edmonds
From: Gary Flowers, P.E.G. and Jamey Battermann, P.E.
Ile: Meiers Property and 190th Place SW Slope Stabilization
19016 94t11 Avenue West, Edmonds, WA
This memo presents the results of our recent exploration borings and resultant geotechnical
design parameters for the planned soldier pile wall along the east side of 190th Place SW in
Edmonds. The soldier pile wall is required in order to repair a landslide that occurred on the
steep slope to the east of 190th Place SW and to stabilize the remainder of the slope in this area.
Other methods of retainage for the slope have been proposed and discussed with a soldier pile
wall at the toe of the slope being the preferred option of all parties. Stability of the slope has
been an issue since about 2003. The steep slope above the roadway is owned in common
between the Meiers and the City of Edmonds.
Summary of Field Exploration and Results
A total o1`3 exploration borings were placed along the east side of 1908' Place SW on January 24,
2012. The approximate location of the borings is shown on Figure 1, Site & Exploration Plan.
The borings were advanced to depths ranging between 16 t/2 to 31 "/2 feet. Borings were drilled
by Geologic Explorations, Inc. using a DeepRock XL drill rig. Samples were obtained at either
2.5 or 5.0 foot increments as deemed appropriate at the time in the field. Samples were obtained
via the Standard Penetration Test methodology.
Boring EB -1 encountered approximately 2 feet of medium dense, blackish -brown, silty sand with
gravel (road fill) overlying dense to very dense, silty sand with gravel to medium to coarse sand
with trace silt (glacially consolidated sediments). Ground water was not observed in the boring.
Borings EB -2 and EB -3 encountered approximately 10 feet of very loose to loose sand with silt
and occasional fine gravel to silty sand with gravel and sandy gravel (road fill) overlying dense
to very dense silty sand with gravel to medium to coarse sand with trace silt (glacially
consolidated sediments). Ground water was not observed in these borings.
Gary A. Flowers, PLLG.
19532 12th Avenue NL Shoreline, Washington 98155-1106 206-417-7640
190`h Place SW Slope Stabilization Geotechnical Set -vices Memorandum
Edmonds, Washington
Although no free ground water was observed within the borings, mottling of the soils was
observed below a depth of 10 feet in EB -2. The mottling indicates that ground water is often
present within these soils.
Asphalt thickness on the roadway was observed to range from 5.5 to 7.0 inches in 2 to 3 lifts.
Since this is not a main arterial it would seem to indicate that the road has bad
settlement/movement issues in the past which has necessitated adding additional layers of
asphaltic pavement.
Upon auger withdrawal from the borings EB -1 caved in to a depth of 8 feet. Borings EB -2 and
EB -3 experienced only minor caving that filled in 2 to 3 feet of the bottom of the bore hole.
Our evaluation indicates that a soldier pile wall that is approximately 125 feet long will stabilize
the areas of concern along the slope face. The wall should begin at approximate street elevation
of 84 feet (undated survey by Reid Middleton for City of Edmonds and provided by City of
Edmonds) and extend southerly to an approximate street elevation of 66 feet. Due to the
presence of a storm drain pipe along the edge of the roadway the soldier piles should be installed
about 2 feet behind the pipe. This will require some excavation at the toe of the slope to prepare
the drill pad and base of wall.
• Based on the survey information it appears that wall heights ranging from 6 to 10 feet
will be required.
® Quarry rock backfill should have a maximum slope inclination on the order of 2H: IV in
order to provide suitable support to the upper portions of the slope and to restore the yard
area on the Meiers' property that was lost by the landslide.
® Poor soil conditions in the upper portion of the borings will have an adverse affect on the
allowable soil design parameters and require either larger beam sizes or tiebacks.
® The wall should be designed for an active equivalent fluid pressure of 45 pef.
® A uniform surcharge of 8H should be applied for seismic loading.
• Lateral resistance to toe kickout can be developed from passive resistance on the front of
the pile portion that is embedded into the ground. The upper 2' should be ignored. From
2' to 7' passive resistance of 100 pef may be used and applied over 2 pile diameters.
• Passive resistance below a depth of 7' will be 500 pcf and should be applied over 2 pile
diameters.
® Tie back anchors, if required, should extend into the dense glacial sediments a sufficient
distance to provide the required tensile forces for wall restraint. A shear strength value of
1,500 psf around the perimeter of the grouted anchor may be used for design purposes.
This value must be confirmed by 200% load testing performed on at least two anchors
during installation of the soldier pile anchor system. Performance testing to 130% must
be performed on the remaining anchors. The shear value typically begins outside of the
Gary A. Flowers, PLLC:.
19532 12°i Avenue NF shoreline, Washington 98155-1106 206417-7640
190ih Place SW Slope Stabilization Geotechnical Services Memorandum
Edmonds, Washington
no load zone which starts 6 feet behind the wall and extends upwards at an angle of 60
degrees. In the area of the landslide the shear value begins a minimum of 10 feet into the
exposed sediments behind the wall. Anchor orientation should be approximately 15 to 20
degrees from the horizontal.
® A perforated drain pipe should be installed at the base of the wall that connects into the
existing storm system. The drain pipe should be sewer quality (ASTM 3034) due to the
depth of burial with quarry spalls.
® Prior to backClling, earthwork contractor to remove all vegetation down to ground
surface and cover the slope with landscape fabric to prevent regrowth. Quarry spall
backfill to be placed atop fabric.
Attachments: Site and Exploration Plan
Exploration Logs
xc: Lucia Engineering, 12014 86th Ave NE, Kirkland, WA 98034
Gary A. Flowers, PLLC.
19532 12'h Avenue NE Shoreline, Washington 98155-1106 206-417-7640
94V AVEW
VIPWPRM�
waft-blb*m-
m 3nN3Av ONZ:6
MN -IAV Hlk6
94V AVEW
VIPWPRM�
waft-blb*m-
Number EB=1
Approximate Elevation 83'
Subsurface
Subsurface conditions depicted represent our observations at the time and location of this exploratory hole, modified by geologic
Interpretations, engineering analysis, and judgment. They are not necessarily representative of other fimes and locations. We will not
accept responsibility for the use or interpretation by others of information presented on this log.
METERS RESIDENCE
19016 94TH AVENUE WEST
EDMONDS, WASHINGTON
JANUARY 24, 2012
PROJECT NO. 05-079
W Q cl�
STANDARD PENETRATION
SEDIMENT DESCRIPTION
C a � �
RESISTANCE
W ®B
BlowslFoot
®
(9
cU)
10 20 30 40
ACP in 3 lifts
__... - - -- -- ------------
Loose, moist, blackish -gray, silty SAND with gravel (fill)
i
27
92
- 42
Very dense, moist, brownish -gray, silty SAND with
50
gravel (glacial till)
------------------------------------------------------------------
Very dense, moist, brown, medium to coarse SAND,
19
100+
trace to some silt (advance outwash deposits)50/3
10
--
i 50/3
100+
1 100/5*
15 19--
24
61
37
BOH @ 16.5'
-
No free water observed.
During auger withdrawal, hole caved in so only upper 8'
-
remained open.
f
*bouncing; blow count overstated
i
30
i
--- --
Subsurface
Subsurface conditions depicted represent our observations at the time and location of this exploratory hole, modified by geologic
Interpretations, engineering analysis, and judgment. They are not necessarily representative of other fimes and locations. We will not
accept responsibility for the use or interpretation by others of information presented on this log.
METERS RESIDENCE
19016 94TH AVENUE WEST
EDMONDS, WASHINGTON
JANUARY 24, 2012
PROJECT NO. 05-079
Number EB -2 EXPLORATION BORING LOG
-7Approximate Elevation 74'
STANDARD PENETRATION
-J 2!W RESISTANCE
SEDIMENT DESCRIPTION® Q Blows/Foot
U) (�
10 20 30 40
6" ACP in 2 lifts
- - --- ------ -..----- -----
---Very
Veryloose to loose, moist, brown and gray SAND
8
10
with silt, occasional fine gravel (fill)
7
A
3
5
5
2
- -
A4
2
0
A2
Asphalt chips at 10'
10
-
1
Some mottling of soils
A 5-
-
4
Very dense, moist, gray, silty SAND with gravel
45
95
(glacial till)
50
Becomes less silty; some mottling
50/5
100+
--------------------------------------------------------------- -
20
—�
Very dense, moist, gray to brown SAND, trace silt,
significant mottling in upper portion of unit
(advance outwash deposits)
_
I
50/6
100+
25
-
50/6
i
100+
i
- - ----------- ----------- ---
BOH @ 29'
30
-- -- -
No free water observed.
Minor caving following auger withdrawal.
Subsurface conditions depicted represent our observations at the time and location of this exploratory hole, modified by geologic
Interpretations, engineering analysis, and judgment. They are not necessarily representative of other times and locations. We will not
accept responsibility for the use or interpretation by others of information presented on this log.
EXPLORATION BORING LOG
Number EB -3 Approximate Elevation 64'
STANDARD PENETRATION.
W
RESISTANCE
SEDIMENT DESCRIPTION
Blows/Foot
U)
10 20 30 40
5.5" ACP in 2 lifts
------------- -------- - ---- ----------------
Loose, moist, interbedded, gray, brown, and black,
gray,
8,
A
SAND
silty SAND with gravel, medium SAND with silt, and
5
sandy GRAVEL (fill)
3
8
A5
3
2
3
9
4
Al
5
10
6
48 A
18
Dense to very dense, moist, brown and gray, silty
30
SAND with gravel (glacial till)
15
50/6
C -
100+
Thin silt interbed at 20'
--- 20
41
1
Mottling from 20' to 25'
50/4
25
1100+
50/5*
------------------------------------------------------------------
Very dense, moist, brown, medium to coarse SAND
(advance outwash deposits)
-- 30
21
77
--------- - - ------ ------------- - ----------- ---------
43
BOH @ 31'
34
No free water observed.
Minor caving following auger withdrawal.
*bouncing; blow count overstated
Subsurface conditions depicted represent our observations at the time and location
of this exploratory
hole, modified
by geologic
Interpretations, engineering analysis, and judgment. They are not necessarily representative
of
other times and locations.
We VAII not
accept responsibility for the use or interpretation by others of information presented
on this log.
%
METERS RESIDENCE
19016 94TH AVENUE WEST
EDMONDS, WASHINGTON
JANUARY 24, 2012
PROJECT NO. 05-079