Calais Civil Repairs & Site Dewatering from Eng.pdfTo: Jeannine Graf, Bldg Official, Ann Bullis Assistant Bldg Official Date: July 27, 2007
City of Edmonds, Building Division
From: Mark Heinzig, PE Heinzig Enterprises, Inc.
16909 3d Ave SE, Mill Creek WA 98012
CC: Monte Clouston, Property Owner, Bend, Or
JUL 3 0 2001
Project: Calais Apartment,1115 4h Ave S Edmonds, WA BUILDING I)EPARTM
Re: Civil Site Repairs & Temporary Dewatering for SDMONDENTg
Circa 2007 Calais Apartment Seismic Upgrade/Foundation Repairs
Ref Plans: PE stamped, Permit Approved Calais Temporary Dewater Plans, Dated 4116107
Ref Plans: PE stamped, Permit Approved Calais Seismic Rehab Drawings, Dated 5/8107
Rehab Repairs by: Monte Clouston, et al (Property Owner & Builder, his subcontractors & workers)
As E.O.R. for the Calais Apartment Seismic Rehab of 2007, and associated foundation repairs, I am writing this
engineer letter to inform the City of Edmonds (Bldg Dept & Public Works Dept) that Monte Clouston
(Owner/Contractor) has satisfactorily:
• completed the Temporary Dewatering for the Circa 2007 Calais Apartment Seismic/Found Repairs
• repaired the (E) onsite storm drainage pipe damaged during install of the Temporary Dewatering System_
• repaired the (E) onsite water supply pipe damaged during install of the Temporary Dewatering System.
• repaired the (E) onsite sewer pipe damaged during install of the Temporary Dewatering System.
• repaired the (E) onsite driveway payment cut/replaced during install of the Temporary Dewatering System.
It is my understanding the circa 2007 Calais Apartment civil & structural upgrades was undertaken by the Owner as a
prelude to a rental -to -condo conversion, and this letter & completed repairs may help satisfy both the City of
Edmonds & WA State Housing Bill, EHB 1848.
During construction, I performed periodic civil site observation (site visits) at intervals appropriate to the stage of
construction, to observe the progress and quality of work completed by the Owner/Contractor. I found the install of
the temporary dewatering system & repairs to the existing utilities to be in general conformance with the design intent
of the PE stamped, permit approved drawings referenced above, and PE stamped post -permit, engineer field repair
details.
Finally, while all circa 2007 onsite civil infrastructure repairs that I field observed were performed by the
Owner/Contractor in general conformance with design intent of the above referenced, permit approved pians & field
details, I am not providing any direct or implied construction warranty on the recent utilities repairs. Further, I am not
responsible for any acts or omission of the Owner, Contractor or subcontractor providing any portion of the circa.
2006 — 2007 repairs. Finally, I am not responsible for, nor providing any guarantee concerning the existing condition,
or future performance of the exposed/concealed civil utilities & pavements, historically designed/installed by other
parties. ..,,• _
Respectfuil ours,
MarHemzig, PE
Heinzig Enterprises, Inc.
16909 3`d Ave SE, Mill Creek, WA 98012
425-208-6877 cel, Heinzig@MSN.com