Loading...
Cambridge Condo CG Eng letter dated 3-14-08.pdfENGINEERING MICROFILM RECEIVED MAR 14 2008 Memorandum �`�CITY OF0EDMO DS To: City of Edmonds Building Inspector From: C. Chevy Chase, PE, SE Date: March 14, 2008 Re: Cambridge Condominiums Dry Rot Repairs (Permit No.'s; BLD20071183, BLD20071184, BLD20071185, BLD20071186, BLD200711.87)+ 4.4p? -- 04$—'1 It is our understanding that the City's Inspector was unable to view the framing repairs during the final framing inspection. CG Engineering was on site to observe the repair work ort 12/1412007. At the time of the site visit, portions of the floor sheathing and .bottom. plate had .been replaced in like kind In units 101 and 201. The repair work appeared to be in conformance with our recommendations outlined in structural sketches SS -1, SS -2, SS -4, and SS -5. Please refer to the previous memorandum, dated January 4, .2008, regarding nailing of the wall sheathing.