Loading...
campbell sp.pdf... as g 0r peg the e- A Wall De maintenance of any currently existing illegal, nonconforming or un ermitted building, structure )r site Condition which is outside the scope of the }ermit application, r &rdle of whether such yuilding, structure or condition is shown on the 40 Ian or drawing. Such building struct��� PLAN audition may be the subject of a separate +�1 L nforeement action. --I? �F \ IMPERVIOUS SU -AMS CAMS orner Setbacks Note: No drainage plan / detention Front 102_ required since post Jule 1977 im.pem ions 5 r r surfaces are less than -000a sq. ft. Rear Existing Impemious Surfacers >- Caustructed i `b. . Building roof outline: 350€ s:f. 1. Existing Deck (to be ivinoved): io8 s1 Landing: 10 91 i4g Concrete Porch: 39 s.#. ,qtr`• EI 96.5 Scale, x'w- 20,. re4-•ba+' • vim hW- 1n�- 0k - City R'Edmands"UndeveToped Alley El. 93.5 1 Existing Lampe Portes and Ominage ISE: CEPA 2006J 1W C r ALL E fPOSEp S RFACE� TO f RE COVEREP WI AIN Pv DAYS DATUM cis Top of. Hydrant -1 fif3' N RZ 'c,4A 129, P DEVELOPMENT SERVICES CTR. CITY, OF EDMONDS 48, .4 too' APPR®VEp By PLANNING TPXVOR ANO STAR CAWBEU 733 HMMOCK ST., PBMONDS, "WA 98020 PABM # 0048¢50050290C LOT COURAGE Existing House 1310 S -f Kitchen. Addition 348 s:l New deck, landing, stairs 504 s.f. Total sf: fa, , S. -f. DA Area 7t5a si. Lot Coverage S+% g4 d/ HuGtrr CAI.cs A-9� q4.2 smwia,er laf.S C = 95-5 D=9 . Ac -F- -94,16 4G • Co AC'it 1AL = 115 30' Ut Sim 7.6% (Slope fr front to rear of lot) Gradin .. 10 -sa c.y. + - but less than 5o e.y. IMPERVIOUS SU -AMS CAMS orner Setbacks Note: No drainage plan / detention Front 102_ required since post Jule 1977 im.pem ions 5 r r surfaces are less than -000a sq. ft. Rear Existing Impemious Surfacers Caustructed i `b. . Building roof outline: 350€ s:f. 1. Existing Deck (to be ivinoved): io8 s1 Landing: 10 91 Drive av- 540 s1 Concrete Porch: 39 s.#. I. 1(33 Total. Existing: 2205 &f. Nov IMRW-im Area 0PowerPole Roof Area of Addition. 35oS, (lines overhead) .Deck, Stairs, Landings 504 s.f: Total Neem: 4o6 -y& Sqq s ,-q 30' Ut Sim 7.6% (Slope fr front to rear of lot) Gradin .. 10 -sa c.y. + - but less than 5o e.y. Other Hey �rP l $. `f IBM orner Setbacks g uired Actual Front Sides 5 r r IR �7— Rear Other Hey �rP l $. `f