CANOD_BLD20140795.pdfCity of Edmonds
Critical Area Notice of Decision
Applicant:
Property Owner:
Critical Area FileC
'
Permit Number:
I Ite �7 C
Site Location:
ry
Parcel Number:
Project Description:
J
2"&' nditional Waiver. No critical area report is required for the project described above.
There will be no alteration of a Critical Area or its required buffer.
2,,"`T'he proposal is all allowed activity pursuant to ECDC 23.40.220, 23.50.220, and/or
23.80.040.
The proposal is exempt pursuant to ECDC 23.40.230.
❑ Erosion Hazard. Project is within erosion hazard area. Applicant must prepare an erosion and
sediment control plan in compliance with ECDC 18.30.
[] Critical Area Report Required. The proposed project is within a critical area and/or a critical area
buffer and a critical area report is required. A critical area report has been submitted and evaluated
for compliance with the following criteria pursuant to ECDC 23.40.160:
1. _ The proposal minimizes the impact on critical areas in accordance with ECDC 23.40.120,
Mitigation sequencing;
2. The proposal does not pose an unreasonable threat to the public health, safety, or welfare
on or off the development proposal site;
3. The proposal is consistent with the general purposes of this title and the public interest;
4. Any alterations permitted to the critical area are mitigated in accordance with ECDC
23.40.110, Mitigation requirements.
5. The proposal protects the critical area functions and values consistent with the best
available science and results in no net loss of critical functions and values; and
6. _ The proposal is consistent with other applicable regulations and standards.
❑ Unfavorable Critical Area
ea Decision. The proposed project is not exempt or does not adequately
mitigate its impacts on critical areas and/or does not comply with the criteria in ECDC 23.40.160 and
the provisions of the City of Edmonds critical area regulations. See attached findings of
noncompliance.
Favorable Critical Area Decision. The proposed project as described above and as shown oil the
attached site plan meets or is exempt from the criteria in ECDC 23.40. 160, Review Criteria, and
complies with the applicable provisions of the City of Edmonds critical area regulations, Any
subsequent changes to the proposal shall void this decision pending re -review of the proposal.
F
Conditions. Critical Area specific condition(s) have been applied to the permit number referenced
above. See referenced permit number for specific condition(s).
Reviewer
Signature
Date
Appeals: Any decision to approve, condition, or deny a development proposal or other activity based or) the
requirements of critical area regulations may be appealed according to, and as part of, the appeal procedure, if any,
for the permit or approval involved,
Reed 12/1612010
02086 YM `SONOWO3
1S TdVH 6ZL
30N3(]IS3N HIMS n
oN
roma
II
nxQ®`
$�Fs�,°'�+ VllIWfi!'S3N IWd3d pT15016]
i:/
p4°- blllKEt'S3ti IWY3d�trTJ5�1&0
ivlllM(i511Wk3d SIL/LLj8Q
02086 YM `SONOWO3
1S TdVH 6ZL
30N3(]IS3N HIMS n
m
D
J
i
II
r
m
D
J
i