Car Star Spray Booth.DOC
MEMORANDUM
Date:March 12, 2008
To:Building Department/Ann Bullis
From:Mike Smith, Acting Fire Marshal 425-775-7720
th
Subject: Car Star BLD 2008-0143 7323 224 St SW
The Fire Department has the following comments:
1) The plans show the sanding station being moved from the East wall to the West
wall and it appears to have increased in size. Is this a pre engineered design
constructed at the factory and assembled on site? Please provide more detail
on the sanding station including curtain detail, sidewall and top detail.
2) The Ultra Work Station appears to have several different uses. Is the primary
use in this instance a spray booth? The handout had no door, curtain, wall or
roof detail. Please provide more info on the station.
3) 2006 IFC 1504.3.2.5 requires 3 feet of clear space around the booth. Please
justify the lack of clear space around the new booth install.
4) Please provide your contact at PSCA so I can converse if the need arises
regarding this project.
Please call with any questions.
City of Edmonds Fire Department