Loading...
Car Star Spray Booth.DOC MEMORANDUM Date:March 12, 2008 To:Building Department/Ann Bullis From:Mike Smith, Acting Fire Marshal 425-775-7720 th Subject: Car Star BLD 2008-0143 7323 224 St SW The Fire Department has the following comments: 1) The plans show the sanding station being moved from the East wall to the West wall and it appears to have increased in size. Is this a pre engineered design constructed at the factory and assembled on site? Please provide more detail on the sanding station including curtain detail, sidewall and top detail. 2) The Ultra Work Station appears to have several different uses. Is the primary use in this instance a spray booth? The handout had no door, curtain, wall or roof detail. Please provide more info on the station. 3) 2006 IFC 1504.3.2.5 requires 3 feet of clear space around the booth. Please justify the lack of clear space around the new booth install. 4) Please provide your contact at PSCA so I can converse if the need arises regarding this project. Please call with any questions. City of Edmonds Fire Department