Cedar St - 961_Difinitive Homes SFR - BLD20070109.doc
City of Edmonds
TH
121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221
Website: www.ci.edmonds.wa.us
DEVELOPMENT SERVICES DEPARTMENT
Planning • Building • Engineering
Plan Review Corrections
Plan Check : Date:
# BLD20070109 March 12, 2007
Project Name/Address:
Difinitive Homes SFR / 961 Cedar Street
Contact Person/Address/Fax:
William Phillips / DIFINITIVE.HOMES@COMCAST.NET
Reviewer: Edward SibrelDivision:Engineering
During review of the subject submittal it was found that the following information, corrections, or
clarifications will need to be addressed:
1.Grading, Excavation, Shoring:
Excavation quantities are estimated at 250 cubic yards.
o
2.Detention / Drainage:
The drainage plan is incomplete.
Show the detention system on the site plan. Include rim and invert elevations.
o
Show how the tightline ties into the detention system.
o
Show how and where the footing drains are to drain.
o
The detention system must connect to the City storm system. The closest storm line is on Walnut Street.
o
Show the new storm line between the detention system and its connection on Walnut Street.
o
th
The new storm line running in the unimproved 10 Ave N right-of-way shall be built to City Standards.
o
3.Utilities:
Please include the locations of the proposed sewer line on the site plan from main to house.
o
A 6” cleanout is required on the sanitary sewer line at the property line with a 12” locking CI lamphole
o
cover. Please show this requirement on the site plan.
If you wish to reuse the existing sewer lateral, contact Public Works (425-771-0235) for an assessment of
o
the current line’s condition.
Engineering notes the new power service shall be undergound.
o
Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please
contact me at 425-771-0220 or by email at sibrel@ci.edmonds.wa.us if you have specific questions
regarding these plan corrections.
DATE E-MAILED 3/12/07 1 PAGES