Loading...
Chen Duplex TIA.pdfName of Proposed Project- I ';, Y� 1? F . . .............. . . . . . ............ - Owiner/Applicant Narne 62, -_4 � -11 , � A---,-4- StTeet/.Mailing Address City State Zip Telephone: i Applicant Contact Perswu 2 4-- 4� .............................. . .......... . ...... . Street/Mailing Address, cit -.Y State Zip Telephone: Traffic Engineer who prepared the Traffic Impact Analysis (if appficable)� Firm Name 'Telephone: Contact Name E-mail: 11, , , 111, ............ . . . . . . . . . . . . . . . .................... I ............ THRESHOLD LEVELS OF ANA -LYSIS Project Traffic Levels Sections to Con) lete 1. Less than 25 peak -hour trips generated I and 7 only (Worksheet/Check list) 11. More than 25 peak -hour trips generated All sections 1. PROJECT DESCRI[PTION 7 a. Location - Street address: Z I G--/P� ft ACt,- -o T �, Id -t— a vicinity map and site plan.) b. Speci,�y existing land use: _—WN -Az "Al c. Specify proposed type an(] size ofdevetopmcflt; Z;4 .................. . . . . (11 ,Q residended omdls 1e(T1fi5wd on 6124/10 h ff? 'fir r�/ Pagm / of 5 fic lwpac� ,1madY,Tr,.7 Mlorlrshe(,,�l - 110A., 'T'raf, 'ic Ar,,�,allysis "ifti ks", Ir"i e t Name of Proposed Project- I ';, Y� 1? F . . .............. . . . . . ............ - Owiner/Applicant Narne 62, -_4 � -11 , � A---,-4- StTeet/.Mailing Address City State Zip Telephone: i Applicant Contact Perswu 2 4-- 4� .............................. . .......... . ...... . Street/Mailing Address, cit -.Y State Zip Telephone: Traffic Engineer who prepared the Traffic Impact Analysis (if appficable)� Firm Name 'Telephone: Contact Name E-mail: 11, , , 111, ............ . . . . . . . . . . . . . . . .................... I ............ THRESHOLD LEVELS OF ANA -LYSIS Project Traffic Levels Sections to Con) lete 1. Less than 25 peak -hour trips generated I and 7 only (Worksheet/Check list) 11. More than 25 peak -hour trips generated All sections 1. PROJECT DESCRI[PTION 7 a. Location - Street address: Z I G--/P� ft ACt,- -o T �, Id -t— a vicinity map and site plan.) b. Speci,�y existing land use: _—WN -Az "Al c. Specify proposed type an(] size ofdevetopmcflt; Z;4 .................. . . . . (11 ,Q residended omdls 1e(T1fi5wd on 6124/10 h ff? 'fir r�/ Pagm / of 5 fic lwpac� ,1madY,Tr,.7 Mlorlrshe(,,�l - d.. Date (,;oi1struc6wj,wflJ begin. ai.-j.d bc cornptetcd: . . .......... -------- ... . . . . ... .... eDefine proposed access localiom f. Define proposed sight distaiiec at, site egress locations 2, TRIP GIENE14ATION Source shall be dic Eighth Edition of the Institute ofTransportation Eiigii.)eers (ITE) Tiip (.3'eneration alanil'-fl" F`6i i6dependent f.ee calculations, the CLIDTYA edition of the ITE rnarival may be used. AJ -)T = Average Daily'Traffic PM Peah - houi - trips (A,M, noon or school peak may also apply as dUected by the City Engineei) a. Existing Site: Tdp Generation Table: PM Peak -4-1 our'"F rips Land Use Daily (ADT) OUT . . ........................................................... . . — — ------ .... . . . . . ................... ...... -- — ----- ------ . . . ........................ . . . . b. Proposed Project Trip Generation Table: PM Peak -Hour Trips Land Use Daily (ADT) IN OUT c. Net New Project Trip Generation'T'able: PM Peak -Hour Trips Land Use Daily (ADT) I I—` l"N OUT d. State assumptions Aad methodology for internal, link -diverted or passby trips: Rew"';ed on 6121110 1,182 '�'rqfflc 2' o�1'5 T kHTK-'vAT10N State recommerided measures and Pecs required. W iniligatc, pi, 'ect. specific traffic irripacts, -i-raffic irnpact I've shall be calculaced ftom the Edi-nonds R.oad.aipact- Fce Rate Study Table 4 (attached.) and as identified In E(MC1.13.81 120, except as otherwiso prf.)vided fi.)r independent- fee calcu.1-itions hi E( , DC 18.82.130. Cllr LkNGE iINmm USE Fee for prior use shall be based on fee established at ti -10 tiMe the Prior rase was permitted, If the previous use was permitted prior k) [tie adoption of Ordinance 3516 (effective date- 09/12/04), the 2004,. ECDC 18,82, 120 impact fee shall. be used. ITE I -And Use Category New Us, [1�4cvv 6sc Fee-, Af' NEW DEVELOPMENT ITE Land Use Category El OTHER Units in Per Unit square feet, Fee Rate # of dwelling, v etc. $ x MITIGATION FEE RECOMMENDAT101\1: Units in WDEPENDENT FEE CALCULATION: $200.00 (+ consultantJee) Per Unit square fiect, Fee Fee Rate 4 of dwelling, .... . . . ... . ... . .. . ... o Use Fee: �f�� "X mm�% — ��� � � � Units in Per Unit square feet, Fee Rate # of dwelling, v etc. $ x MITIGATION FEE RECOMMENDAT101\1: WDEPENDENT FEE CALCULATION: $200.00 (+ consultantJee) TOT ALTRAFFIC FEE IMPACT $ /Y J 11 0 cfty7of� P" monds, "T, Engineering Division Approval Date I No hljlp,�wi. fbes Will be due, nor will a cucidit begim�4�, (im- ��m irnpm;( cak.,mlati.0f.A. FCAAliag ii.1 'inct ti.cgaivc, Rm)i,wd on W-2,1// 0 17"82 'Fraffic Wier IcAes,�(, Page 5 oj'5 1�