City of Edmonds Pre-App Form_FILLED OUT (2).pdfI' "'I N{ ( 'S' I ' �l \"FLOWFNIFF
12 1 5dh A"Ir me "'I
P 4 L0 2 2()
REAPPLICATION MEETING
SUBMITTAL REQUIRMENTS
0 FORMAL PRE-APPLICA-110N MEETING
(SEE BACK PAGE)
$1,000LO (1/ wfli be applied toward the future
permit Submittal)
Staff frorn the Building, Planning, Engineering and
I" ire Departments attend the meeting, provide written
comments and answer questions regarding the
proposed project, This meeting is encouraged for
major projects j,')Hor to a formal application submittal
to the City. The goal is to identify MAJOR issues and
cllscuss processing procedures applicable to the
project.
Submit I set of plans with Loq4f,rg
2(LJaLo,[L)2ikCJq,g per
page 2.
NOTE: PRE -APP Meetings are scheduled for the next
available date with a rninimurn of two weeks lead
time & DRC Meetings a minimum of one week.
DEVELOPMENT REVIEW COMMi FTEE. MEE'FING
�o mplementary, inforrnal meeting
This is an inforr-nal opportunity to rneet with staff
and discuss your preliminary ideas and concepts
for a project, The intent is to help identify the
rrojor code requ4rements, that rill need to be
addressed and any significant site development
issues that may relate to the project, The intent is
for this to occur prior to considerable investment
in plans and/or design work. YOU rnay wish to
have your design professional(s) accompany you,
Submit 1 set of the following:
1) Site Man
2) Vidnity Map
3) This completed form
4) Pertinent background information
5) Floor plans if applicable
6) list of quesflons regarding your proposed project
COMPLETE ALL REQUESTED lNFORMA-FION
Zoning:.(l Lot Size: Sno CountyTax Account Parcel
Site Address(s):
Existing Use/Occupancy:
Pre -Submittal for: 0 Building Permit Only Z Land Use Approval/ Permit
Description of Project:
Revised on 0110412017