CN_Given_2-27-13.pdf
Lambert, Jennifer
From:Lambert, Jennifer
Sent:Wednesday, February 27, 2013 2:28 PM
To:'Ryan Balas'
Subject:RE: Stonebridge Attached
Attachments:CN_2-22-13.pdf
Ryan,
th
Ijustwentoutto21918Α78PlW.Items2&5fromthecorrectionnoticegivenon2/22/13stillneedtobeaddressed.
Item2Itappearsthattheyarddrainlocatedonthesouthsideof21918doesnothaveaconcretebase.Alsoasyou
recallfromtheinspectionon2/25/13theyarddrainwillneedtobecleanedout(whichIassumewillhappenwhenthe
concretebaseisputin).
Item5ΑTheasbuiltsprovideddonothavesufficientenoughinformation.TheasbuiltshouldbeaduplicateoftheUtility
Plan.Itshouldshowdimensions(triangulationmethodispreferred),pipematerialandsize,depthofpipes,property
lines,andoutlineofthehome.Thepurposeoftheasbuiltistoprovideadrawingthatallowsforanypersontolocate
theirutilitiesinthefuture.
Pleaseletmeknowifyouhaveanyquestions.
Thanks,
Jennifer
From: Ryan Balas \[mailto:ryanb@sundquisthomes.com\]
Sent: Tuesday, February 26, 2013 10:26 AM
To: Lambert, Jennifer
Subject: FW: Stonebridge Attached
Jennifer,
HerearetheasbuiltsforlotscurrentlycompletedatStonebridge.CajunremindedmethatthiswastheplanwithEd,to
sendthemallinattheend.
LetmeknowifthisķƚĻƭƓƷwork.
Thanks,
RYAN BALAS
Field Manager
SUNDQUIST HOMES, a Family of Companies
16108 Ash Way, Suite 201, Lynnwood, WA 98087
| 425.742.8469 fax |
Designed for Better Living. | Facebook| YouTube| Twitter
For more information visit www.sundquisthomes.com
Each member of the Sundquist Homes Family of Companies is an
independently owned and operated limited liability entity.
1
From: Sharon Galloway \[mailto:SharonG@cajunexc.com\]
Sent: Monday, February 25, 2013 3:32 PM
To:cajundispatch@aol.com
Subject: Stonebridge Attached
2