Loading...
CN_Given_2-27-13.pdf Lambert, Jennifer From:Lambert, Jennifer Sent:Wednesday, February 27, 2013 2:28 PM To:'Ryan Balas' Subject:RE: Stonebridge Attached Attachments:CN_2-22-13.pdf Ryan, th Ijustwentoutto21918Α78PlW.Items2&5fromthecorrectionnoticegivenon2/22/13stillneedtobeaddressed. Item2Itappearsthattheyarddrainlocatedonthesouthsideof21918doesnothaveaconcretebase.Alsoasyou recallfromtheinspectionon2/25/13theyarddrainwillneedtobecleanedout(whichIassumewillhappenwhenthe concretebaseisputin). Item5ΑTheasbuiltsprovideddonothavesufficientenoughinformation.TheasbuiltshouldbeaduplicateoftheUtility Plan.Itshouldshowdimensions(triangulationmethodispreferred),pipematerialandsize,depthofpipes,property lines,andoutlineofthehome.Thepurposeoftheasbuiltistoprovideadrawingthatallowsforanypersontolocate theirutilitiesinthefuture. Pleaseletmeknowifyouhaveanyquestions. Thanks, Jennifer From: Ryan Balas \[mailto:ryanb@sundquisthomes.com\] Sent: Tuesday, February 26, 2013 10:26 AM To: Lambert, Jennifer Subject: FW: Stonebridge Attached Jennifer, HerearetheasbuiltsforlotscurrentlycompletedatStonebridge.CajunremindedmethatthiswastheplanwithEd,to sendthemallinattheend. LetmeknowifthisķƚĻƭƓ͸Ʒwork. Thanks, RYAN BALAS Field Manager SUNDQUIST HOMES, a Family of Companies 16108 Ash Way, Suite 201, Lynnwood, WA 98087 | 425.742.8469 fax | Designed for Better Living. | Facebook| YouTube| Twitter For more information visit www.sundquisthomes.com Each member of the Sundquist Homes Family of Companies is an independently owned and operated limited liability entity. 1 From: Sharon Galloway \[mailto:SharonG@cajunexc.com\] Sent: Monday, February 25, 2013 3:32 PM To:cajundispatch@aol.com Subject: Stonebridge Attached 2