Comments #3 combined pdf.pdf City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORKS DEPARTMENT Engineering Division Plan Review Corrections nd Plan Check : Date: # BLD20160215-2, 3rd May 31, 2016, September 12, 2016, Nov. 4, 2016 th Project Name/Address: Dale Fonk Single Family Residence 18626 94 Ave W Contact Person/Address/Fax: Randy Munson randy.munson@comcast.net Reviewer: JoAnne ZulaufDivision:Engineering During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts and Standard Details referred to in these comments can be accessed at our website: www.edmondswa.gov by choosing the “Services” tab and “Permits and Development”. Choose GIS Web Map. Use the layers tab on the bottom left to look at specific utilities and other information. Use the “Identify” on the tool bar to get more detailed information. **This property has access and utility easements crossing adjacent properties. All of these easements are part of this project. Show the full extent of the project for all plans.** A set of Marked up Civil sheets are included indicating areas with needed corrections/revisions. 1.11/4/16 Completed but may need revising per other comments. Please complete site plan (sheet A-1) to include all required information. Remove spot elevations for clarity, the contours are sufficient. See example. 2.9/12/16 Done. 3.9/12/16 Done. 4.11/4/16 See Plan Markups (attached) for remaining items to correct/revise. 9/12/16 Incomplete. 1)11/4/16 Completed. 2)11/4/16 Completed. 3)11/4/16 Completed. 4)11/4/16 Completed. 5)11/4/16 Completed. 6)11/4/16 Completed. 7)11/4/16 Currently waiting for word back from the Water Division on the configuration. Please contact Kris Kuhnhausen for more information at Operations 425-771-0235. Water meter must be installed on the right of way side of the property line. 8)11/4/16 Completed. 9)11/4/16 Completed. DATE FAXED/E-MAILED 11/10/2016 PAGE _1__ OF _3_ 10)11/4/16 Completed. 5.11/4/16 Completed. 6.11/4/16 Completed. 7.9/12/16 Completed. 8.9/12/16 Completed. 9.9/12/16 Completed. 10.11/4/16 Completed. 11.11/4/16 Completed. 12.9/12/16 Complete. 13.9/12/16 Complete. 14.11/4/16 Completed 15.9/12/16 Complete. 16.11/4/16 Completed. 17.11/4/16 No longer applicable. 18.11/4/16 See Stormwater Pump Report Comments below. 9/12/16 This review will be deferred to the next submittal due to the changes required to the stormwater system. Note, current stormwater report, th page 2, states the force line is to be installed all the way to 94. Please provide a stormwater pump report as described in detail in the City of Edmonds Handout E62 Regulations for Private Residential Sewage Pumps in Edmonds (Single Family Residential Only). The handout is for sewage but the requirements for pump submittal is the same. Please review handout carefully to ensure that all required information is provided in the resubmittal. 19.11/4/16 Completed. 20.11/4/16 Completed 21.9/12/16 Completed. 22.9/12/16 Completed. 23.9/12/16 Completed. 11/4/16 Stormwater Pump Comments: Michele (Mike) De Lilla, PE, LEED AP City of Edmonds Senior Utilities Engineer mike.delilla@edmondswa.gov (425)771-0220 Review of: · · Review Comments: DATE FAXED/E-MAILED 11/10/2016 PAGE _2__ OF _3_ Please contact Mike De Lilla at the contact information above with any questions concerning the stormwater pump comments. The Engineering Division may have additional comments during review of the resubmittal. Please resubmit 3 copies of the revised plans/documents with a written response letter to a Development Services Coordinator. Please contact me at 425-771-0220 if you have specific questions regarding these plan corrections. DATE FAXED/E-MAILED 11/10/2016 PAGE _3__ OF _3_ The submittal has thearrow pointing to the94th Ave easement. shown. (it is shown Please adjust as correctly here-I changed it) See utility engineer'scomments re: pump X Storm CB should beplaced at edge oflocation to captureeasement area. TheCB shall be placed onthe private side of theproperty line. Therunoff should then be piped under road towith a riprap pad.stormwater easementfor the ditch area. should be located asclose to the right ofwhere functionality is outfall in the ditch property line in aThere is a public The new outfall the access roadway as possible achievable. runoff in the notes and arrows clearer. Separate Make this a little Captures ground Footing drain? Add or move YD? water? Runoff needs to becollected from the asphalton the property.Please show howthe runoff will beconveyed to thedetention. Arrowsmay be employedto help show thedriveway area tothe collection point.Please indicatethicken edge orberms if necessaryto guide runoff. Road section ineasement shall notbe directed to thedetention facility. captured and slope of the driveway See notes on the locationoverflow for storm on of catch basin and sheet 1 The water division was reviewingprovided a response yet. Pleasecall Kris Kuhnhausen, Water Leadat 425-771-0235 to confirm location this configuration but has not Please note: to be removed approval. Please add "water line shall be sleeved with 20' pvc centered at point of crossing". Handout E-86 Add size and material of roof drain tightline pipe. overflow pipe and calloutfall or overflow atthe control structure connecting to the out. System will pump. My error. Please remove approximate volume for Please provide the drywells. Add size of yard drains or add See notes on sheet 1 reference to a detail.