Community Transit - BRT.DOC
PRE-APPLICATION MEETING
Pre-App Date:
March 20, 2008, 1:30pm
Developer / Applicant:
Virginia Ponce de Leon
thth
Property Address:
238 & Hwy 99 and 216 & Hwy 99
Type of Construction:
Community Transit Swift Bus Rapid Transit Project
Engineering Rep:
Jeanie McConnell, Engineering Program Manager
Bertrand Hauss, Traffic Engineer
The following comments are provided from the Engineering Division in review of
the conceptual plans for the BRT stations. Additional information or review
comments may be precipitated during the review of the building permit
application.
Engineering Handouts and Standard Details can be found on the City website at
www.ci.edmonds.wa.us
TRAFFIC CONTROL PLAN
1. Please provide a traffic control plan specific to each location. The TCP
should address both lane closure and sidewalk closure. Please refer to City
handout #E81 for additional information.
SIDEWALK IMPROVEMENTS
1. Please include specific detail on the construction of the platform and
associated ramps, textured concrete, curb, etc.
STORM WATER
1. Storm detention will not be required at individual BRT stations.
Please continue to work with Bertrand Hauss, Traffic Engineer on the
development agreement. Please feel free to contact me with any questions you
may have at 425-771-0220 or at mcconnell@ci.edmonds.wa.us
City of Edmonds
Community Services Department
Engineering Division