Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Compaction Report - 10.18 and 10.24.2012.pdf
Date:Job #: Sky Valley Testing, LLC 10/18/121229 P.O. Box 835 Day of Week:Time On Site: Monroe, WA 98272 Thrusday2.0 Job Name & Location:Weather:Drive Time: Partly Sunny1.0 N. Meadowdale Rd Storm /Sewer Mileage:Total Hours: 363.0 16124 N Meadowdale Road, Edmonds WA Observation CategoryContractor:Forman: Cressy Bull DozingGreg Test PointFillElevation MoistureDry DensityMax. DryCompactionTest Location NumberDepth (ft.)FeetContent (%)(pcf)Density (pcf)Percentage 197% S.G.6.0120123.6 Storm/Sewer Crossing 295% 1'<S.G.5.7118123.6 Storm/Sewer Crossing NOTES: Asrequested,stoppedbysitetocheckbackfillforarecentlyinstalledstormand sewerlinewhichcrossesN.MeadowdaleRoad.Trenchisabout6'wideto accommodatebothstormlineandconnectionforsidesewer. Trenchwasbackfilledwitha11/4"crushedrockandcompactedwithaHoePac. Geotech in Field: Jerry Boyd Sky Valley Testing, LLC Soil Consultants/ Geotechs/ Compaction Testing (206) 949-4938 Date:Job #: Sky Valley Testing, LLC 10/24/121229 P.O. Box 835 Day of Week:Time On Site: Monroe, WA 98272 Wednesday2.0 Job Name & Location:Weather:Drive Time: Partly Sunny1.0 N. Meadowdale Rd Storm /Sewer Mileage:Total Hours: 363.0 16124 N Meadowdale Road, Edmonds WA Observation CategoryContractor:Forman: Cressy Bull DozingGreg Test PointFillElevation MoistureDry DensityMax. DryCompactionTest Location NumberDepth (ft.)FeetContent (%)(pcf)Density (pcf)Percentage 495% 3'<S.G.4.7118123.6 Storm / Sewer Cross 597% 1'<S.G.6.6120123.6 Storm / Sewer Cross 696% Storm / Sewer CrossS.G.5.1119123.6 NOTES: Contractorreplacedteeforsewerinstreet(sinceearlierinstallationdidnotmeet citiesT.V.inspection). Contractorreplacedcrushedrockandcompactingin1218"liftswithahoepac. Checkedcompactionasbackfillwasplacedandcompactedandfoundresultsatleast 95%. Geotech in Field: Jerry Boyd Sky Valley Testing, LLC Soil Consultants/ Geotechs/ Compaction Testing (206) 949-4938