Loading...
Compaction Report.9.20.13.pdf)8Zfio Ca rth Earth Solutions NW, LLC LETTER OF TRANSMITTAL To: Echelbarger Investments, LLC Date: September 20, 2013 4001 — 198th St SW, #2 ESNW No.: ES- 3030 Lynnwood, WA 98036 Project: Sunset Utility Attn: Mr. Todd Echelbarger Email: todd(cDechelbarger.com No. of Copies Date Description 1 9/10-9/11/13 Daily Field Reeorts)# 1& 2 i Comments: CC: 1: ATTN: 2: ATTN: 3: ATTN: 4: ATTN: Transmitted By: Earth Solutions NW, LLC PM: Kyle Campbell 1805 — 136" PI NE, Suite 201 Bellevue, WA 98005 (425) 284-3300 FAX (425) 449-4711 Toll Free (866) 336-8710 Earth Solutions NWLLC Field SEKRep. dl �' 1805 136" Place NE, FAX: Time On Site Suite 201 (425) 449-4711 Bellevue, WA 98005 TOLL FREE: 11:30 am (425) 449-4704 (866) 366-8710 ................. mm DAILY FIELD REPORT Travel Time 1 hr Project Anne Job Location fV 633 — 2rd Ave N, Edmonds General Contractor General Contractor's Superintendent Grading Contractor Grading Foreman Are approved Plans/Permits onsite F YES ❑ NO Project No. Project No. Page of Report No ES 3v 1 of 1 1 Time Off Site Date Day of Week 12:15 pm 9/10/13 Tuesday Weather _ Foggy 61°F Client / Owner _............................ Received Onsite By Checked By 11 I Permit No. As requested, an ESNW rep was on site to collect a ompaction test and a proctor sample of the stormwater line that was backfilled previously. The contractor had installed a stormwater line, backfilled, compacted, and placed a cold patch over the backfill prior to arrival. Upon arrival, the contractor removed a portion of the cold patch so ESNW rep could collect a compaction test and a soil sample. A compaction test was collected, then a soil sample of 1 1/4 inch minus crushed rock for proctor analysis. The compaction result will be available once the proctor is complete. ESNW will return when requested. Shannon E Koon COPY TO: CONTINUED ON NEXT PAGE Earth Solutions NWLLC Field Rep. Project No. Page of Report No. Shannon K ES 3030 1 of 1 2 t' M' 1805 136" Place NE, FAX: Time On Site Time Off Site Date Day of Week Suite 201 (425) 449-4711 Bellevue, WA 98005 TOLL FREE: 9/11/13 Wed (425) 449-4704 (866) 366-8710 DAILY FIELD REPORT Travel Time Weather Project Name Job Location SNOHOMISH COUNTY Client / Owner Sunset Utility 633-2 nd Ave N, Edmonds _. ....... _ �....................... _......... General Contractor General Contractor's Superintendent Received Onsite By Grading Contractor Grading Foreman Todd Echelbai Checked By 11 /l7 kre approved Plans/Permits onsite n YES ❑ NO Project No. Permit No. As requested, the compaction result was available as the proctor is complete. The compaction test collected indicated adequate compaction of 95% of the modified proctor at the location tested. Please see the drawing above for the location tested. ESNW will return when requested. Shannon E Koon . . . ............. - .............. . . . .. . . . .......... . .... . . . ...... ....... . . . ................................ COPY TO: CONTINUED ON NEXT PAGE Z