Loading...
Compaction Report.pdfAM: Tied into existing sewer main in Main Street to provide side sewer for proposed residence under construction at 1035 Main Street. Contractor encountered various existing utilities. PM: Contractor backfilled side sewer with imported crushed rock. Backfilled and compacted with a hoe pac. Sides of trench had some caving mostly on west side. Contractor plans to T cut asphalt and re compacted sides of.trench. Ran out of time today and will continue installing sewer to existing residences under construction. Geotech in Field, Jerry Boyd no, LLC Soil Consult antsf Geatechs/ Compaction Testing (206) 949-4938 ........................ . . . . . . ........ ........ . . . . . . . . . . ..... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .................................... .................................. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ............................ . . . . . . . . . . . . . . . . . . AM: Tied into existing sewer main in Main Street to provide side sewer for proposed residence under construction at 1035 Main Street. Contractor encountered various existing utilities. PM: Contractor backfilled side sewer with imported crushed rock. Backfilled and compacted with a hoe pac. Sides of trench had some caving mostly on west side. Contractor plans to T cut asphalt and re compacted sides of.trench. Ran out of time today and will continue installing sewer to existing residences under construction. Geotech in Field, Jerry Boyd no, LLC Soil Consult antsf Geatechs/ Compaction Testing (206) 949-4938 Moisture Density Relationship Curve e? -T— Date', Curve Test By: ---IY2 -t5 �c-scnptjon Material: &PAY MOISTURE CONTENT - PERCENT OF DRY VVElUil I �J - Mk1#4 ST- -