Loading...
Compaction Report_Veterinary Clinic FR 5-6 AB.pdfa s sOciate d earth Sc'eDceS incorporated 9zzFifth Avenue Kirkland, Washington 98033 Phone: 425-827-7701 Fax: 425- 827-5424 wwwaesmeozom TO: Chris G8qg,VIVID 19831 -15th Avenue Northwest Shoreline WA 98177 /UT0: AS REQUESTED BY: Kirt w/Wilcox Paee1of2 Date Project Name Project No. 1-7-15 Garg Veterinary Clinic KE120557A Location Municipality Weather 310-5 th Avenue South I Edmonds Overcast, 40s Permit No. DPD No. Report No. Pass 2 51h Ave South 21 135.4 Architectural Werks 98 4.4 Pass Chris Garg VIVID 5th Ave South General Contractor/Superinten dent 130.9 Wilcox Construction, Inc./ Kirt Jones 95 Grading Contractor/Superintendent Pass Pro Excavators/ Dwayne Kryer 5th Ave South THE FOLLOWING WAS NOTED: AES|was onsite, at the contractor's request, to continue performing construction monitoring services.Upon arrival, wemet with Duane from Pro Excavators. Water and Fire Service — 5th Avenue South AESI observed the contractor backfill a trench containing a 4" pipe for fire service and a 2" pipe for water service, located in the right-of+may'appnoximate|y6O'northoftheintenecLionat5°Ave5outhandA|derstreeLTrenchwax4-5'deepandextended across both lanes of the road, from curb to curb. Backfill material consisted of imported 1%" minus crushed rock. The contractor filled in lifts and utilized both a jumping jack and hoepac to achieve compaction. We took density tests on the structural fill, using a nuclear moisture -density gauge, with results listed inthe table below and approximate locations in Figure 1. Test results showed that a minimum of 95% compaction was achieved, determined by the ASTM:D 1557 test procedure (modified proctor). A sample of the imported 1%" minus crushed rock was taken for laboratory proctor test. Table 1. DensitV tests for water & fire services - structural fill Test No. Locations (See Fig. 1) Approx. Depth Below Subgrade (ft.) Dry Density (Pcf) Proctor (pcf) (ASTM D 1557) Compaction I(%) Moisture M Pass/Fail I 51h Ave South 2' 131.0 138.2 95 3.8 Pass 2 51h Ave South 21 135.4 138.2 98 4.4 Pass 3 5th Ave South 01 130.9 138.2 95 4.1 Pass 4 5th Ave South 01 132.5 138.2 96 4.5 Pass AESI will return to site at the contractor's request. Copies To: Field Rep: Dan Voth Date Mailed: JAN 105 2015 Principal / PM: � v. 5/14 This document isconsidered nDRAFT until signed or initialed by an AaDnrincipal or Projec Manager Copies To: Date Mailed: v. 5/14 AESI FIELD REPORT Page 2 of 2 To: Chris Garg VIVID Date: 1-7-15 Permit No. Project Name: Garg Veterinary Clinic Project No.: KE120557A DPD No. I 91 Figure 1. Water & fire service trench — 5th Ave S. kigne, i I coxconstruction. co m Dan Voth Field Rep: Bruce Blyton, P.E. Principal / PM: This document is considered a DRAFT until signed or initialed by an AE51 Principal or Project Manager a380ciaLe d earth sciences inoorpnra\ed yzzFifth Avenue Kirkland, Washington yooss Phone: 425-8277701 Fax: 425- 827-5424 www.aes&eozom TO: Chris GaV[NO 19831 - 15th Avenue Northwest Shoreline,WA 98177 AnN: xaREQUESTED BY: Kirtvv/\Nilcox THE FOLLOWING WAS NOTED: pgo Date Project Name Project No. 9 JAN 15 TG'arg Veterinary Clinic KE120557A Location Municipality Weather 310-5 th Avenue South � Edmonds Overcast, 40s Permit No. DPD No. Report No. Architectural Werks Chris Garg VMD General Contractor/Superintendent Wilcox Construction, Inc./ Kirt Paving Contractor/Superintendent Olympic Paving/ Tim I was on site for part time construction monitoring of asphalt pavement placement. Upon myarrival, | met with Wrt from Wilcox, and Tim from Olympic Paving. Upon myarrival, the general contractor informed mepaving was occurring later than heanticipated. | observed the fire andvvatersemicet/enoh|ine|ocatedintheright-of+wa)\about60feetnorthoftheintersociionat5'hAveSouthandA|derstreot. The trench was about 6 inches deep and extended across both lanes of the road, from curb to curb. The already placed backfill material consisted of1%inch minus crushed rock. The paving contractor informed me the Rice value for the asphalt used was 156.1 pcf, and he intended to place pave the trench line in two -3 inch thick lifts. | observed the base lift was compacted with a combination of double drum roller, and hand push plate. After the base lift was compacted, I obtained compaction readings of the asphalt before informing the contractor I had another appointment tnkeep, and another inspector would arrive onsite. Density Readings I performed two in place density readings on the compacted asphalt with results that ranged from 94 to 97% of the Rice. Conclusion I informed the general and paving contractors the asphalt placement observed today met the 92% compaction criteria. Test No. Depth (in) Location et Density (pcf) Rice (pcf) Compaction (%) Pass/Fail 1 -3 5t� Ave S, Middle 151.8 156.1 97 Pass 2 -3 51h Ave S, Near E Side of Curb 146.5 156.1 94 Pass Copies To: Field Rep: Su-Kiet Lieu � DateMailed:i|ed� w��� ="~ m = - Principal /PM: Bruce Blyton, P.E. v. 5/14 This document bconsidered oDRAFT until signed minitialed by on AESIPrincipal mProject nager a sSOCi8ie d earth SC'eDCes incorpora\ed yzzFifth Avenue Kirkland, Washington gonas Phone: 425-827-7701 Fax: 4%5'827'5424 TO: Chris G8 VIVID l9831—l5mAvenue Northwest ShUn2UO8 WA 98177 A5REQUESTED BY: Kir1m/Wilcox THE FOLLOWING WAS NOTED: Date Project Name Project No. 1/9/2015 Garg Veterinary Clinic KE120557A Location Municipality Weather 3105 th Avenue South onds Clear 50's Permit No. 1 DPD No. Report No. 2 5' west of east curb 156.0 143.9 Architectural Werks P 3 8' east of west curb Chris Garg VIVID 144.6 General Contractor/Superintendent P_ Wilcox Construction, Inc./ Kirt Pro Excavators / Dwayne Kryer AESI was onsite at 3:00 pm for part time construction monitoring. Paving Upon arrival the contractor had completed paving of the crossing for utility installation across 5th Avenue South. Paving contractor had left the project. AES|cornp|etedinp|acedensitytestsnftherUn0p8CtedtUplift ofthe newly placed asphalt. All density tests were passing and are recorded inthe table below. Test Location Rice Density Compaction P/F 1 Center line of road 156.0 144.7 93 P 2 5' west of east curb 156.0 143.9 92 P 3 8' east of west curb 156.0 144.6 92 P_ Copies To: Field Rep: Tony Romanick, P.E. Dote Mailed: Principal /PM: Bruce Blyton, P.E. ^6/14 This document bconsidered oDRAFT until signed minitialed by an AESI Principal m�*e, Manager �