Compaction Report_Veterinary Clinic FR 5-6 AB.pdfa s sOciate d
earth Sc'eDceS
incorporated
9zzFifth Avenue
Kirkland, Washington 98033
Phone: 425-827-7701
Fax: 425- 827-5424
wwwaesmeozom
TO: Chris G8qg,VIVID
19831 -15th Avenue Northwest
Shoreline WA 98177
/UT0:
AS REQUESTED BY: Kirt w/Wilcox
Paee1of2
Date
Project Name
Project No.
1-7-15
Garg Veterinary Clinic
KE120557A
Location
Municipality
Weather
310-5 th Avenue South
I Edmonds
Overcast, 40s
Permit No.
DPD No.
Report No.
Pass
2
51h Ave South
21
135.4
Architectural Werks
98
4.4
Pass
Chris Garg VIVID
5th Ave South
General Contractor/Superinten dent
130.9
Wilcox Construction, Inc./ Kirt Jones
95
Grading Contractor/Superintendent
Pass
Pro Excavators/ Dwayne Kryer
5th Ave South
THE FOLLOWING WAS NOTED:
AES|was onsite, at the contractor's request, to continue performing construction monitoring services.Upon arrival, wemet with
Duane from Pro Excavators.
Water and Fire Service — 5th Avenue South
AESI observed the contractor backfill a trench containing a 4" pipe for fire service and a 2" pipe for water service, located in the
right-of+may'appnoximate|y6O'northoftheintenecLionat5°Ave5outhandA|derstreeLTrenchwax4-5'deepandextended
across both lanes of the road, from curb to curb. Backfill material consisted of imported 1%" minus crushed rock. The contractor
filled in lifts and utilized both a jumping jack and hoepac to achieve compaction.
We took density tests on the structural fill, using a nuclear moisture -density gauge, with results listed inthe table below and
approximate locations in Figure 1. Test results showed that a minimum of 95% compaction was achieved, determined by the
ASTM:D 1557 test procedure (modified proctor).
A sample of the imported 1%" minus crushed rock was taken for laboratory proctor test.
Table 1. DensitV tests for water & fire services - structural fill
Test
No.
Locations
(See Fig. 1)
Approx. Depth
Below Subgrade (ft.)
Dry Density
(Pcf)
Proctor (pcf)
(ASTM D 1557)
Compaction I(%)
Moisture
M
Pass/Fail
I
51h Ave South
2'
131.0
138.2
95
3.8
Pass
2
51h Ave South
21
135.4
138.2
98
4.4
Pass
3
5th Ave South
01
130.9
138.2
95
4.1
Pass
4
5th Ave South
01
132.5
138.2
96
4.5
Pass
AESI will return to site at the contractor's request.
Copies To: Field Rep: Dan Voth
Date Mailed: JAN 105 2015 Principal / PM: �
v. 5/14 This document isconsidered nDRAFT until signed or initialed by an AaDnrincipal or Projec Manager
Copies To:
Date Mailed:
v. 5/14
AESI FIELD REPORT
Page 2 of 2
To: Chris Garg VIVID
Date: 1-7-15
Permit No.
Project Name: Garg Veterinary Clinic
Project No.: KE120557A
DPD No.
I
91
Figure 1. Water & fire service trench — 5th Ave S.
kigne, i I coxconstruction. co m Dan Voth
Field Rep:
Bruce Blyton, P.E.
Principal / PM:
This document is considered a DRAFT until signed or initialed by an AE51 Principal or Project Manager
a380ciaLe d
earth sciences
inoorpnra\ed
yzzFifth Avenue
Kirkland, Washington yooss
Phone: 425-8277701
Fax: 425- 827-5424
www.aes&eozom
TO: Chris GaV[NO
19831 - 15th Avenue Northwest
Shoreline,WA 98177
AnN:
xaREQUESTED BY: Kirtvv/\Nilcox
THE FOLLOWING WAS NOTED:
pgo
Date
Project Name
Project No.
9 JAN 15
TG'arg Veterinary Clinic
KE120557A
Location
Municipality
Weather
310-5 th Avenue South
� Edmonds
Overcast, 40s
Permit No.
DPD No.
Report No.
Architectural Werks
Chris Garg VMD
General Contractor/Superintendent
Wilcox Construction, Inc./ Kirt
Paving Contractor/Superintendent
Olympic Paving/ Tim
I was on site for part time construction monitoring of asphalt pavement placement. Upon myarrival, | met with Wrt from
Wilcox, and Tim from Olympic Paving.
Upon myarrival, the general contractor informed mepaving was occurring later than heanticipated. | observed the fire
andvvatersemicet/enoh|ine|ocatedintheright-of+wa)\about60feetnorthoftheintersociionat5'hAveSouthandA|derstreot.
The trench was about 6 inches deep and extended across both lanes of the road, from curb to curb. The already placed backfill
material consisted of1%inch minus crushed rock.
The paving contractor informed me the Rice value for the asphalt used was 156.1 pcf, and he intended to place pave the
trench line in two -3 inch thick lifts. | observed the base lift was compacted with a combination of double drum roller, and hand
push plate. After the base lift was compacted, I obtained compaction readings of the asphalt before informing the contractor I had
another appointment tnkeep, and another inspector would arrive onsite.
Density Readings
I performed two in place density readings on the compacted asphalt with results that ranged from 94 to 97% of the Rice.
Conclusion
I informed the general and paving contractors the asphalt placement observed today met the 92% compaction criteria.
Test No. Depth (in) Location et Density (pcf) Rice (pcf) Compaction (%) Pass/Fail
1 -3 5t� Ave S, Middle 151.8 156.1 97 Pass
2 -3 51h Ave S, Near E Side of Curb 146.5 156.1 94 Pass
Copies To: Field Rep: Su-Kiet Lieu
�
DateMailed:i|ed� w��� ="~ m = - Principal /PM: Bruce Blyton, P.E.
v. 5/14 This document bconsidered oDRAFT until signed minitialed by on AESIPrincipal mProject nager
a sSOCi8ie d
earth SC'eDCes
incorpora\ed
yzzFifth Avenue
Kirkland, Washington gonas
Phone: 425-827-7701
Fax: 4%5'827'5424
TO: Chris G8 VIVID
l9831—l5mAvenue Northwest
ShUn2UO8 WA 98177
A5REQUESTED BY: Kir1m/Wilcox
THE FOLLOWING WAS NOTED:
Date Project Name
Project No.
1/9/2015 Garg Veterinary Clinic
KE120557A
Location
Municipality
Weather
3105 th Avenue South
onds
Clear 50's
Permit No. 1 DPD No.
Report No.
2
5' west of east curb
156.0
143.9
Architectural Werks
P
3
8' east of west curb
Chris Garg VIVID
144.6
General Contractor/Superintendent
P_
Wilcox Construction, Inc./ Kirt
Pro Excavators / Dwayne Kryer
AESI was onsite at 3:00 pm for part time construction monitoring.
Paving
Upon arrival the contractor had completed paving of the crossing for utility installation across 5th Avenue
South. Paving contractor had left the project. AES|cornp|etedinp|acedensitytestsnftherUn0p8CtedtUplift
ofthe newly placed asphalt. All density tests were passing and are recorded inthe table below.
Test
Location
Rice
Density
Compaction
P/F
1
Center line of road
156.0
144.7
93
P
2
5' west of east curb
156.0
143.9
92
P
3
8' east of west curb
156.0
144.6
92
P_
Copies To: Field Rep: Tony Romanick, P.E.
Dote Mailed: Principal /PM: Bruce Blyton, P.E.
^6/14 This document bconsidered oDRAFT until signed minitialed by an AESI Principal m�*e, Manager
�