Compaction Reports.pdfStopped by site 2s requested to check compaction in backfill on side sewer in 9th Ave. Trench being backfilled with 5/8" minus, crushed rock. Fill being compacted in: V lifts using lumping jack. Contractor adding water to fill material. Geotech in Field: Dan Sleeman Contractor continued installing side sewer in 9th Ave south. Trench being backfilled with 5/8" Minus crushed rock in 1' lifts. Fill being compacted using a Jumping jack. Contractor adding water to fill material. Geotech in Field.. Dan Sleernan "InPaction Testing Moisture Density Relationship Curve k r_ Job Curve Test By:. Descripfion Material: mois7rURE CONTE N'T - PERCE OFDRY WEAGHT 9th AVE SIDE SEWER a I=b, 'Date: 0 #: Sky VaUey Testtng, LLC -1 11 i P.G. Box 835 IRD" 16 12 Time On Site-, Monroe, W -A, 98272 W -111F We Li7n, d' ay job ""I'arne i'lLocation: a Drive, ime: ly th jt-,, 5Sunt � Mileage: Total Hours: 902 9th Ave 23 0 Forman: Observation Category 4 Contractor: - Rob, rsi� Phase 0 vation 5AIoi, 71 Dr�,, Dens,-zijj e Pol. �-T st cati n Fill E 11 Max- D �Campactio 77nx 77 Number Depth (ft.) Feet fi C o n t a n f'J!'7 frictl Density (pc5' r 9th Ave SOUL S -G, -A -7 2 a ,' s �# � s����,y fi 5� 77 E . . . . . . . . . . . T- 4 NOTES: .. .. . . ........... Stoppeci by site as requested to check camPaction in ba( fill OCI StDM, Se-',AIE- �';-; 9t" Ali e. Trench vvas bein0 comfpactr-cdHCl' 1, lifts g 'ack.fliledI with 5/8 minus crushed rock. Fflf bc-irg Mg a JUMP�ng 'ack. Cc.,n-��'acnor ,,,vas adding water t-0 fill mate'-- ' Geotech in Field: Dan Sleeman Sky Valley Testing, LLC Soil Consultants[ Geotechs/ Compaction Testing (206)949749,38 Moisture Density Relationship Cune Job: Job Cunje Test Bv:--rf5F5 Description A'3-11-9 1- / 5 s-7 MOISTURE CONTENT - PERCENT OF DRY WEIGHT 9 th Ave S Storm Sewer I