Compaction Reports.pdfStopped by site 2s requested to check compaction in backfill on side sewer in 9th Ave.
Trench being backfilled with 5/8" minus, crushed rock. Fill being compacted in: V lifts
using lumping jack. Contractor adding water to fill material.
Geotech in Field:
Dan Sleeman
Contractor continued installing side sewer in 9th Ave south. Trench being backfilled
with 5/8" Minus crushed rock in 1' lifts. Fill being compacted using a Jumping jack.
Contractor adding water to fill material.
Geotech in Field..
Dan Sleernan
"InPaction Testing
Moisture Density Relationship Curve
k r_
Job Curve Test By:.
Descripfion Material:
mois7rURE CONTE N'T - PERCE OFDRY WEAGHT
9th AVE SIDE SEWER
a
I=b,
'Date: 0 #:
Sky VaUey Testtng, LLC
-1 11
i
P.G. Box 835 IRD" 16
12 Time On Site-,
Monroe, W -A, 98272 W -111F
We Li7n, d' ay
job ""I'arne i'lLocation: a Drive, ime:
ly
th jt-,, 5Sunt
�
Mileage: Total Hours:
902 9th Ave 23 0
Forman:
Observation Category 4 Contractor: -
Rob,
rsi� Phase
0 vation 5AIoi, 71 Dr�,, Dens,-zijj
e Pol. �-T st cati n Fill E 11 Max- D �Campactio
77nx 77
Number
Depth (ft.) Feet fi C o n t a n f'J!'7 frictl Density (pc5'
r
9th Ave SOUL S -G, -A -7
2
a ,'
s �# � s����,y fi
5�
77
E
. . . . . . . . . . .
T-
4
NOTES:
.. .. . . ...........
Stoppeci by site as requested to check camPaction in ba( fill OCI StDM, Se-',AIE- �';-; 9t" Ali e.
Trench vvas bein0 comfpactr-cdHCl' 1, lifts
g 'ack.fliledI with 5/8 minus crushed rock. Fflf bc-irg
Mg a JUMP�ng 'ack. Cc.,n-��'acnor ,,,vas adding water t-0 fill mate'--
'
Geotech in Field:
Dan Sleeman
Sky Valley Testing, LLC Soil Consultants[ Geotechs/ Compaction Testing (206)949749,38
Moisture Density Relationship Cune
Job:
Job Cunje Test Bv:--rf5F5
Description
A'3-11-9 1- / 5 s-7
MOISTURE CONTENT - PERCENT OF DRY WEIGHT
9 th Ave S Storm Sewer
I