Loading...
Compaction_Report_9-2-09_Failed.pdf�4Ml��flf' �9111�Yu'MIIA<OIIi�N�NVP RNfl�4Vy' ro i 01n L] SERI "TLE DIVISION E_1 TACOMA DIVISION j PORTLAND DIVISION 14113 ��tl lt.`VE Vt' 1007 SO 3lAr OM,, Ni,.Y SUITE I-fi 6032NO PAOUNILAKE 1Ehf AC A-, j8043 T,-C,(DrJA /'IA 9841jk3 PORFLAND OR 117217 f425, 248 2400' Pv x 425) 248-2401 2514) 589-1804 FAX 1253) b89-2130 ( 031 289-177H ' FAX (r( ) 28il-191,3 CLIENT PillChuck Contractors PROJECT NO. 712-90103 DATE S�epternber 2, 2009 ADDRESS P.O. Box 2579 PERMIT NO. N/A W.O. Kirkland, WA 98083 MUNICIPALITY City of Edr-nonds ENGINEER ATTENTION Mr. Rick Bailey ARCHITECT P.O. NO. 238199 CONTRACTOR PROJECT 21816 76th Place West PROJECT ADDRESS 21816 76th Place West n .t .i 111, 1 - , rn ITTtniIGFt'l [y`ny mfIhnI s'tl I tall Fdn,laIto ItI,raParty Iiy any III ^rjl re ti nxtli,.s.Inc.,r,ni,it, d, NAME ON OFF 8T OT MILES 1116 !. � I neon altr is t( tlr nCL d ,y ,r Ilte Sull, )Nn N f1 the a[ Wdl tr SI (ietlo r r a , ttHor i 1 s, .dnin the ent »n q„ >n. app -TI 11a, TOTAL HOURS Certified Report by Professional Service Industries: Is - 98-1 Ryan Hart ao—Date SePtember 301, 2009 PSI ON SI LE: 1-0 OBLAIN A MATERIAL SAMPLE FOR PROCTOR AND SIEVE ANALYSIS AT PSI LAB, SAMPLED MATERIAL IS 5/8" CRUSHED AGGREC3AI E, COLLEC-PED FROM TEMPORARY MATERIAL STORAGE PILE LOCATED AT PROJECT SITE. SAMPLED MAI ERIAL COLLECTED AND DELIVERED 10 SEA 1TLE PSI LAB 1-0 BE SUBJECT TO PROCTOR AND SIEVE ANALYSIS. EQUIPIVIENT IDENTIFICATION AND S/N#: COPIES TO: INSPECTOR: DATE: STEVE HALLEE September 2, 2009 x CLIENT CONTRACTOR FIELD CONTACT: DATE: ENGINEER BUILDING DEPT. ARCHITECT SUPPLIER ITEMS INSPECTED TO APPROVED PLANS ARE: CONFORMING rX NONCONFORMING n .t .i 111, 1 - , rn ITTtniIGFt'l [y`ny mfIhnI s'tl I tall Fdn,laIto ItI,raParty Iiy any III ^rjl re ti nxtli,.s.Inc.,r,ni,it, d, NAME ON OFF 8T OT MILES 1116 !. � I neon altr is t( tlr nCL d ,y ,r Ilte Sull, )Nn N f1 the a[ Wdl tr SI (ietlo r r a , ttHor i 1 s, .dnin the ent »n q„ >n. app -TI 11a, TOTAL HOURS Certified Report by Professional Service Industries: Is - 98-1 Ryan Hart ao—Date SePtember 301, 2009 7 -{ I12��w),auilt-1 On SEATTLE DIVISION F-] TACOMA DIVISION 24113 56TH AVE W. 10025 SO. TACOMA WAY, SUITE H1 MOUNTLAKE TERRACE. `IVA 98043 TACOMA. WA 98499 (425) 248-2400 - FAX (425) 248-2401 (253) 589-1804' FAX (253) 589-2136 DR 52728 PORTLAND DIVISION 6032 NO. CUTTER CIR. SUITE 480 PORTLAND. OR 97217 (503)289-1778- FAX(503)289-1918 CLIENT Pillchuck Contractors PROJECTNO. 712-90103 DATE September 2. 2009 ADDRESS P.O. Box 2579 PERMIT NO. N/A W. 0. PERFORMED TEST FOR COMPACTION OS SUB GRADE (BACKFILL) MATERIAL DID NOT MEET 95% COMPACTION. Kirkland, WA 98083 MUNICIPALITY City of Edmonds CLIENT NOTIFIED OF FAILING TEST DAY OF ENGINEER ATTENTION Mr. Rick Bailey ARCHITECT SPEC y. P/F P.O. NO. 238199 CONTRACTOR PROJECT 121816 76th Place West IPROJECTADDRESS 121816 76th Place West WORK DESCRIPTION Certified Report by Professional Service Industries: TS - 95-1 ��,. _� o:.�,�,t�.` •-. .� �: NAME ON OFF ST OT MILES TOTAL HOURS Hart Date September 30, 2009 PSI ON SITE AS REQUESTED BY CONTRACTOR TO PERFORM FIELD DENSITY TESTING OF PIPELINE TRENCH BACKFILL, LOCATION DIRECTLY EAST OF WALKWAY TO RESIDENCE 21824 76TH PLACE WEST, 6" EAST OF CURB, DIMENSIONS OF AREA TESTED APPROXIMATELY 2"X18"_ PROCTOR VALUE FOR 5/8" BACKFILL MATERIAL PROVIDED BY PSI LAB. PERFORMED DENSITY TESTS EVERY 50' OF MATERIAL PLACED PER LIFT PERFORMED TEST FOR COMPACTION OS SUB GRADE (BACKFILL) MATERIAL DID NOT MEET 95% COMPACTION. CLIENT NOTIFIED OF FAILING TEST DAY OF INPLACE DENSITY TEST RESULTS TEST LOCATION DEPTH WET DEN DRY DEC t.IOIST -/_ * COMP / SPEC y. P/F A 1) DIRECTLY EAST OF 21824 RESIDENCE, 12" E. OF CURB 10" 127.0 123.4 2.9 1 90.1 95.0 F EQUIPMENT IDENTIFICATION AND SIN# 3430/37343 .1. SAMPLE I.D. PROCTOR VALUE 137.0 @ 8 GAUGE STANDARD: MS 641 DS 2516 '2. SAMPLE I.D. PROCTOR VALUE LAB METHOD_ R1 D1557 ❑ D698 ❑ RICE ❑OTHER '3. SAMPLE I.E. PROCTOR VALUE ASTM TEST METHOD (AS APPLICABLE) E D2922 (SOILS) ❑✓ D3017 (MOISTURE) ❑ D295D (ASPHALT) D1556 (SAND CONE) ❑ OTHER COPIES TO: INSPECTOR: DATE: x CLIENT CONTRACTOR STEVE HALLEE September 2, 2009 ENGINEER BUILDING DEPT. FIELD CONTACT: DATE: ARCHITECT PSUPPLIER ITEMS INSPECTED TO APPROVED PLANS ARE: CONFORMING NONCONFORMING ❑ IZI Certified Report by Professional Service Industries: TS - 95-1 ��,. _� o:.�,�,t�.` •-. .� �: NAME ON OFF ST OT MILES TOTAL HOURS Hart Date September 30, 2009