Loading...
Compaction_Report_9-24-09_Failed.pdf7- InjU6"Yl" "I t. n 4,� 76 Build On a:a'vg�3'�rarv'w�t•r�v� � ��T>�s,� � 5�a:�tra�9 SEATTLE DIVISION TACOMA DIVISION 24113 56TH AVE V.' 10025 50 TACOMA ,A',%.Y SUITE H1 PAOUNTLi,KE TERRACE Y.A 98043 TACOIAA.'AA 98499 :425: 248-2400' FAX 4251248-2401 2531 589-1804' FAX 1253) 5892135 DR 59421 PORTLAND DIVISION 6032 NO CUTTER CIR_ SUITE 480 PORTLAND OR 97217 1503, 289-1778' FAX (5031 289-1918 CLIENT PillChuck Contractors PROJECT NO. 712-90111 DATE September 24, 2009 ADDRESS P.O. Box 2579 PERMIT NO. N/A W. 0. Kirkland, WA 98083 MUNICIPALITY City of Edmonds CLIENT WAS NOTIFIED OF NON -CONFORMING RESULTS ENGINEER ATTENTION Mr. Rick Bailey ARCHITECT P.O. NO. 238861 CONTRACTOR PROJECT 1567 9th Ave North PROJECT ADDRESS 11567 9th Ave North. Edmonds, WA WORK DESCRIPTION PSI WAS ON SITE AS REQUESTED TO PERFORM COMPACTION TESTING OF A STORM DRAIN TRENCH ADJACENT TO THE ADDRESS LISTED ABOVE. THE AREA WAS COMPACTED PRIOR TO THE ARRIVAL OF PSI, AND NO CLIENT REPRESENTATIVE WAS ON SITE DURING THE IN PLACE DENSITIES NEITHER LOCATION TESTED MET THE SPECIFICATIONS OF THE PROJECT. CLIENT WAS NOTIFIED OF NON -CONFORMING RESULTS IN PLACE DENSITY TEST RESULTS TEST LOCATION DEPTH WET DEN DRY DEN. MOST * COMP °/ SPEC', P/F 1 10' NORTH OF STORM DRAIN 10" 122.3 119.9 2.0 1 87.5 95.0 F 2 5' SOUTH OF STORM DRAIN 10" 128.5 125.9 2.1 1 91.9 95.0 F EQUIPMENT IDENTIFICATION AND S/N# 3430/25598 '1. SAMPLE I . 09-038 PROCTOR VALUE 137.0 @ 8.0 GAUGE STANDARD: MS 633 DS 2392 *2. SAMPLE I.D. PROCTOR VALUE LAB METHOD: ❑Q D1557 ❑ D698 ❑ RICE DOTTER '3. SAMPLE I.D_ PROCTOR VALUE ASTM TEST METHOD IAS APPLICABLE) D2922 (SOILS) D3017 (MOISTURE) ❑ 02950 (ASPHALT) D1556 (SAND CONE) ❑ OTHER COPIES TO: INSPECTOR: J. LIND DATE: September 24, 2009 ITEMS INSPECTED TO APPROVED PLANS ARE: CONFORMING NONCONFORMING ❑X x CLIENT CONTRACTOR ENGINEER BUILDING DEPT. ARCHITECT SUPPLIER FIELD CONTACT: DATE: .,,n<<,. ,-; on 3 ,,,.�a �, , e, , otNAME ON OFF ST OT MILES TOTAL HOURS Certified Report by Professional Service Industries: TS - 98-1 Rvan Hart Date October 22, 2009