Compaction_Reports_Redwood.pdfy � s-t'-P -oi , 7,
-rest M
—F;1-1— Elevation
. . . . ......
Moisture Dry Density
Max. Dry
,,tion
Compaction
Number
Depth (ft.'s Feet
Content (pcf)
Density (pef)
,tage
Percentage
Storm Cross�ng
0. 5'<S�, G,
9,0 120
124,1
97%
. . . .....
2
Storm Crossmg
0.5'--S,G
102
'Q41
Contractor in,stalled storm line which crosses 201st St SW for new residence Linder
construction on north side of street. Contractor placed back the on site sandy soils
and compacted backfill with a jumping jack compactor. In top 6 inches of road placed
5/8" crushed rock.
Geotech on Ed&
Jerry Boyd
, (206) 949-W38
'�5Ti7i4EU soiFConsuftaritsl ote
Ged'isl Compacfir�imi Tesflng
1
O