Loading...
Compaction_report-sewer_trench -09.26.12.pdf CLIENTDATE Northwest Construction Inc.09/24/2012 PROJECT LOCATIONPERMIT # Lynnwood WA Inspection Date:Time Onsite:Weather Conditions: 09/24/2012 10:20 amcloudy Inspection Performed: IPD-Soil Compaction B st.,alley w. of B st. s. of Pine st. 8" sewer pipe & SR99 Work / Location:Gauge Standard MS: 697 149th pl s.w. 12" sewer pipe Equipment ID & Serial #:Gauge Standard DS: Troxler 3440E, Ser. #352732273 Sample #:Description:Proctor Value(pcf):Optimum Moisture and Oversize Rock Correction: 1.B12-9475/8 " cstc143.55.9 TEST METHOD ASTM D-1557 /AASHTO T-180 TestMode /Sample Location of TestElev.Wet Dens.Dry Dens.Moist %% Comp.% Reqd. #Depth# 1 4"alley s. of Pine st 10' s. of existing manholefsg141.1136.33.519595 2 4"alley s. of Pine st. 60' s. of existing manholefsg140.8135.93.6194.795 Native SoilsSoils consistent with Proctor Yes No Imported FillsSoils found to be firm and stable; and to the best of our Yes No knowledge, meet compaction Contractor notified of results Yes No REPORTED BY: Steve Harlin REVIEWED BY: , Highway 99 Distribution System Improvements - W0502 - 12B062, 09/24/2012, #D31105, Page 1 of 1