Loading...
CompleteLetter.doc January 31, 2007 Ralph Allen President Bridge Architects, Inc. th 7310 15 Avenue NW Seattle WA 98117 SUBJECT: COMPLETE APPLICATION AND ASSIGNMENT OF HEARING DATE. Dear Mr. Allen: Your application for a second-story addition to an existing medical office building building located at th COMPLETE 21827 76 Avenue West in the RM 2.4 zone has been determined to be and has been scheduled for Architectural Design Board (ADB) review and Conditional Use Permit Review at the times and places listed below. Action: Architectural Design Board (Major) Review File Number: ADB-2006-154 Date of Meeting: March 7, 2007 Time of Meeting: 7:00 PM (or as soon thereafter as possible) Council Chambers Place: th Public Safety Complex – 250 5 Avenue North Hearing Body: Architectural Design Board - AND – Action: Conditional Use Permit Review File Number: CU-2006-153 Date of Meeting: March 15, 2007 Time of Meeting: 3:00 PM (or as soon thereafter as possible) Council Chambers Place: th Public Safety Complex – 250 5 Avenue North Hearing Body: Hearing Examiner Although your application is “complete,” we still need some additional information. Please submit/clarify the following items at your earliest convenience. Also note that we will continue to process your SEPA application and we will issue a determination prior to the hearing – I will let you know if I have any questions during the review. C:\\Users\\cockrum\\AppData\\Local\\Temp\\CompleteLetter.doc_153532\\CompleteLetter.doc 1. A Traffic Impact Analysis is required by the Engineering Division. I have enclosed the form for you to fill out and turn in – please contact Lyle Chrisman in the Engineering Division at 425.771.0220 if you have any questions. 2. The Fire Department wanted me to let you know that a fire hydrant will be required, but that they will review this with your building permit. 3. What is the height/bulk of the elevator? Please review the following definition of “Height,” underlined for emphasis – we’ll confirm that it meets the height limit with the building permit, however I’d like to make sure we think it will meet this code with this application as well. 21.40.030 Height. A. Height means the average vertical distance, from the average level of the undisturbed soil of the site covered by a structure, to the highest point of the structure. (See subsection (C) of this section for exceptions to this rule.) B. “Average level” shall be determined by averaging elevations of the downward projections of the four corners of the smallest rectangle which will enclose all of the building, excluding a maximum of 30 inches of eaves. If a corner falls off the site, its elevation shall be the average elevation of the two points projected downward where the two sides of the rectangle cross the property line. (See subsection (C)(1) of this section for exceptions to this rule.) C. Height Exceptions. 1. In the MPOR zone, “height” means the vertical distance above the average elevation of the top of the curb adjacent to the subject property, within the public right-of-way. Average shall be measured averaging the elevation of the curb at the points where the projected property lines and the curb intersect. Where no curb or sidewalk exists, use the designed curb elevation. (See the remaining provisions in this subsection for exceptions to this rule); 2. Church steeples; 3. Elevator penthouses, not to exceed 72 square feet in horizontal section, or three feet in height, for that portion above the height limit; 4. Chimneys, not to exceed nine square feet in horizontal section or more than three feet in height, for that portion above the height limit. In RM districts, chimneys shall be clustered. No multiple-flue chimney shall exceed 39 square feet in horizontal section. The first chimney shall not exceed nine square feet in horizontal section, and other chimneys shall not exceed six square feet in horizontal section; 5. Vent pipes not to exceed 18 inches in height above the height limit; and 6. Standpipes not to exceed 30 inches in height above the height limit. \[Ord. 3569 § 2, 2005\]. 4. Sheet A3.0 – We only have 5 color copies (11x17) in the file. Please submit at least 5 additional copies (we need 7 for the ADB, 1 for the file, 1 for the Hearing Examiner, and 1 more for the file). 5. Sheet A3.1 – We only have 6 color copies (11x17) in the file. Please submit at least 4 additional copies (we need 7 for the ADB, 1 for the file, 1 for the Hearing Examiner, and 1 more for the file). Please be aware that your presence at the hearing is highly advisable. If an applicant or his representative is not present, the item may be moved to the end of the agenda. Items not reached by the end of the hearing will be continued to the following month’s agenda. If you have further questions, please do not hesitate to contact me at 425.771.0220, extension 1778. Thank you for your interest in development in the City of Edmonds – I look forward to working with you on this project. Sincerely, Gina Coccia Planner CC: ADB-2006-154 / CU-2006-153 C:\\Users\\cockrum\\AppData\\Local\\Temp\\CompleteLetter.doc_153532\\CompleteLetter.doc