CONSTRUCTION SEQUENCE NOTES.doc
CONSTRUCTION SEQUENCE NOTES
1. SCHEDULE A PRE-CONSTRUCITON MEETING WITH CITY ENGINEERING DIVISION
AT 425-771-0220, EXT. 1326.
2. REVIEW ESC NOTES.
3. CALL FOR UTILITY LOCATES.
4. INSTALL ESC MEASURES AND MAINTAIN DUST CONTROL.
5. HAVE EROSION CONTROL MEASURES INSPECTED BY CITY OF EDMONDS
CITY ENGINEERING INSPECTOR. (ALL TEMPORARY SEDIMENTATION AND
EROSION CONTROL MEASURES MUST BE IN PLACE AND INSPECTED PRIOR TO
ANY CONSTRUCTION OR SITE CLEARING. EROSION AND SEDIMENTATION
CONTROL PRACTICES AND/OR DEVICES SHALL BE MAINTAINED UNTIL
PERMANENT VEGETATION IS ESTABLISHED.)
6. ROUGH GRADE SITE AS REQUIRED TO INSTALL DRAINAGE FEATURES.
7. DEMOLISH EXISTING STRUCTURES
8. CLEAR, GRUB & ROUGH GRADE REMAINDER OF SITE. REVEGETATE
DISTURBED AREAS NOT SUBJECT TO ADDITIONAL SURFACE DISTURBANCE
IMMEDIATELY AFTER ROUGH GRADING. (OTHER EXPOSED AREAS SHALL BE
STABILIZED PER EROSION CONTROL NOTES BELOW)
9. INSTALL UTILITIES AND OTHER SITE IMPROVEMENTS.
13. STABILIZE AND REVEGETATE ENTIRE SITE.
14. ESTABLISH LANDSCAPING AND PERMANENT VEGETATION. EROSION
CONTROL FEATURES CAN BE REMOVED UPON FINAL SITE STABILIZATION AND
APPROVAL BY CITY INSPECTOR.