Loading...
cooper sewer service letter 08-14-08.pdf11) C. I$9v August 14, 2008 STREET FILE CITY OF EDMONDS FILE COPS GARY HAAKEN50N MAYOR 121 5TH AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 • FAX (425) 771-0221 Website: www d.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT Planning • Building • Engineering DOUGLAS COOPER 9315 220TH ST SW EDMONDS, WA 98020-4551 RE: STATUS OF SEWER SERVICE Dear Mr. Cooper: r !c AUG 2 5 2008 ENGINEERING DIVs`Slcfi" The City has researched the locations of existing laterals on the sewer main within the right-of-way of 220"' Street, SW, and notes that there is an existing sewer lateral within the right-of-way abutting your home, and that the noted lateral is capped and ready for service at or near the property line. Enclosed is a map noting its location. City records indicate that notifications regarding the availability of sewer service were mailed to homeowners known to have septic systems in February of 1993. The city also notes that a side sewer permit was issued in September of 1996, but the permittee made no inspection requests of the city, and so we are unable to verify what work was accomplished. The side sewer permit was administratively closed out in March of 1998. Copies of these documents are enclosed for your perusal. It is also our understanding that you assert that you have been paying the City of Edmonds for sewer service, as if a working sewer line did actually exist. 1f you can show your residence to be indeed unconnected to the city sewer system, the City of Edmonds will consider a request for reimbursement of the service charges. Sincerely, 1 NOEL MILLER, PE Public Works Director Enclosure c: Robert English, PE, City Engineer Tim Harris, PW Sewer Lead Street File 220 St SW- 9315 Cooper SewerService • Incorporated August 11, 1890 I PL AN A-04 46. feet .................. .......... . ............. ................ ....... ................. ......... .... .... ............... ...... ................... ............ . . . . . . . . ....... ......... .... . ...... .... . ....... ........ ............. .......... ....... ........ ... ....... ....... ...fi 1.6 ... ............ ... . .............. ........... ........... ...... ...... .. ... ... I. . . . . . . . . . .......... . . . . . . . . . . . . . . . . . . . . . . . ` 890 -199 CITY OF EDMONDS 250 - 5TH AVE. N.. EDMONDS, WA 98020 • (208) 771-0220 • FAX (206) 771-0221 COMMUNITY SERVICES DEPARTMENT Public Works • Planning . Parks and Recreation • Engineering .February 9, 1993 Dear Resident: LAURA M. HALL MAYOR As you were informed last month, sewers are available for connection in your area of the ci.ty. Property owners having failed or failing septic systems should connect as soon as possible. All other owners are encouraged to do so as well. At this time, there is no established deadline to connect to the sewer system. However, the City does reserve the right to require hookup within 60 clays if a septic system is failing or if other health hazard exists. Following our procedures as described below should simplify the installation process and minimize inconveniences. I. Obtain a side sewer connection and inspection permit at the Community Services Building, 250 Fifth Avenue North. 2. Read all requirements located on the back of the permit. Flyers will be available from the Permit Coordinator when your side sewer permit is issued. 3. if you or your contractor have any questions at this time, please contact Everett Akau at 771-0235, ,extension 354 or myself at extension 349. This way we can clarify anything before the actual installation takes place. 4. Proceed with the installation. 5. Schedule an inspection providing the City.24 hours advance notice. Make sure that you provide the permit number at this time and have the permit at the job site. 6. Once an inspection is complete and accepted by our inspector, you will have two (2) days to break in the top of the existing septic tank and fill it with sand. Required by the Uniform Plumbing Code. At this time, our inspector will finalize your permit. • Incorporated August II, 1$90 • rifiae Intorna#innal — )-Iota"— _1�... Sewer Connection Page 2 Please feel free to contact this department if you are unsure about any steps in this process. i will be glad to have an inspector meet with you and go through the procedure so we can make the entire process as simple as possible for you. Thank you for your cooperation. Ran Holland Mater/Sewer Supervisor RH/ l k SEWER/LT/TXTSEWER