RE: STATUS OF SEWER SERVICE
Dear Mr. Cooper:
r
!c
AUG 2 5 2008
ENGINEERING DIVs`Slcfi"
The City has researched the locations of existing laterals on the sewer main within the right-of-way of
220"' Street, SW, and notes that there is an existing sewer lateral within the right-of-way abutting your
home, and that the noted lateral is capped and ready for service at or near the property line. Enclosed is a
map noting its location.
City records indicate that notifications regarding the availability of sewer service were mailed to
homeowners known to have septic systems in February of 1993. The city also notes that a side sewer
permit was issued in September of 1996, but the permittee made no inspection requests of the city, and so
we are unable to verify what work was accomplished. The side sewer permit was administratively closed
out in March of 1998. Copies of these documents are enclosed for your perusal.
It is also our understanding that you assert that you have been paying the City of Edmonds for sewer
service, as if a working sewer line did actually exist. 1f you can show your residence to be indeed
unconnected to the city sewer system, the City of Edmonds will consider a request for reimbursement of
the service charges.
Sincerely,
1
NOEL MILLER, PE
Public Works Director
Enclosure
c: Robert English, PE, City Engineer
Tim Harris, PW Sewer Lead
Street File
220 St SW- 9315 Cooper SewerService • Incorporated August 11, 1890
I
PL AN
A-04
46.
feet
..................
.......... . ............. ................ .......
................. ......... .... .... ...............
...... ...................
............
. . . . . . . .
.......
.........
.... . ......
.... .
....... ........
............. ..........
.......
........
... .......
.......
...fi
1.6 ...
............
...
. ..............
........... ...........
...... ...... .. ... ...
I.
. . . . . . . . .
..........
. . . . . . . . . . .
. . . . . . . .
. . . .
` 890 -199
CITY OF EDMONDS
250 - 5TH AVE. N.. EDMONDS, WA 98020 • (208) 771-0220 • FAX (206) 771-0221
COMMUNITY SERVICES DEPARTMENT
Public Works • Planning . Parks and Recreation • Engineering
.February 9, 1993
Dear Resident:
LAURA M. HALL
MAYOR
As you were informed last month, sewers are available for connection in
your area of the ci.ty. Property owners having failed or failing septic
systems should connect as soon as possible. All other owners are
encouraged to do so as well.
At this time, there is no established deadline to connect to the sewer
system. However, the City does reserve the right to require hookup
within 60 clays if a septic system is failing or if other health hazard
exists.
Following our procedures as described below should simplify the
installation process and minimize inconveniences.
I. Obtain a side sewer connection and inspection permit at the
Community Services Building, 250 Fifth Avenue North.
2. Read all requirements located on the back of the permit.
Flyers will be available from the Permit Coordinator when
your side sewer permit is issued.
3. if you or your contractor have any questions at this time,
please contact Everett Akau at 771-0235, ,extension 354 or
myself at extension 349. This way we can clarify anything
before the actual installation takes place.
4. Proceed with the installation.
5. Schedule an inspection providing the City.24 hours advance
notice. Make sure that you provide the permit number at this
time and have the permit at the job site.
6. Once an inspection is complete and accepted by our inspector,
you will have two (2) days to break in the top of the
existing septic tank and fill it with sand. Required by the
Uniform Plumbing Code. At this time, our inspector will
finalize your permit.
• Incorporated August II, 1$90 •
rifiae Intorna#innal — )-Iota"— _1�...
Sewer Connection
Page 2
Please feel free to contact this department if you are unsure about any
steps in this process. i will be glad to have an inspector meet with
you and go through the procedure so we can make the entire process as
simple as possible for you.
Thank you for your cooperation.