Loading...
Correct.Open Bible Church.doc JoAnne.....no problem....but I am also unsure if it would meet the standards, so let me know what Jennifer thinks....it is the material that is used for the filter fabric fence that we put around the excavation.....as to the soil cover, I intend on getting bark to put on the exposed dirt around the site.....as to the pavement at the SW corner, the asphalt was cut out by our excavator/underground guy, and it looks like he filled it all in with the crushed rock, which appears to be running down with the surface drainage towards the CB. We intend to "fix" that area when we finally have the alley paved, but due to lack of finances, it is not something that will be paved soon. The filter sock on the CB will help for a time, but do you believe that we need to quickly pour some asphalt at that location.....if so then I will see what can be done, but it might take longer than this week to repair.....I will also sweep the alley from the dirt that has collected from our site.....Your thoughts on all of this....? Thanks Ron ----- Original Message ----- From: Zulauf, JoAnne To: Ronald Johnson Sent: Tuesday, May 12, 2009 9:10 AM Subject: RE: Correction Notice, Open Bible Church, 656 Daley Street Ron, Sorry I did not notice that there was not an insert cloth in the drain. I only saw the erosion from the lot corner and I did not look closely at the CB. My error. Just in case, I'm not sure exactly what you installed but we do require sock filters to provide adequate protection for CBs. Today's inspector, Jennifer, will stop by this morning to take a look and I will email you if she has any further comments. Thank you, and again, sorry that I missed the CB cloth. JoAnne Zulauf -----Original Message----- From: Ronald Johnson \[mailto:ronmaile@verizon.net\] Sent: Tuesday, May 12, 2009 8:57 AM To: Zulauf, JoAnne Subject: Re: Correction Notice, Open Bible Church, 656 Daley Street Hi there....at 1:00 yesterday Monday, I put at the CB an insert cloth over the drain and under the grate at the SW corner of the parking lot....it was still in place last night at 5:30pm when I double checked it......as to the additional items on this recent email, I will address these immediately.....I am concerned about your comment that nothing was done....please see the cloth at the CB...if you do not agree with this installation, please let me know right away.....Ron ----- Original Message ----- From: Zulauf, JoAnne To: ronmaile@verizon.net Cc: Collins, Jennifer ; Sibrel, Ed Sent: Tuesday, May 12, 2009 8:31 AM Subject: RE: Correction Notice, Open Bible Church, 656 Daley Street Ron, I went out to inspect the work done in response to Ed's 5/8/09 correction notice and it doesn't appear that anything has been done at this point. To clarify his correction notice, there is erosion under the southwest corner of the parking lot. Besides the fact that the silt and debris is draining directly into the cb in the alley, the parking lot asphalt will fail if this is not addressed. When at the site yesterday, I also noted that the alley is covered with dirt from the work being done on this property. We require that unworked soils be covered within two days. The site needs to have some kind of erosion control cover on the lot, straw, bark, hydroseed that will help keep the silt, dirt and debris on the site and not blowing and draining into the public storm system, other property, and being tracked onto the public alley and street. Please have you contractor address the issue presented in the 5/8/09 correction notice, sweep the alley, and cover the unworked soil on the site. I will put the property on the inspection list for Thursday afternoon to give them time to get this accomplished. Thank you. JoAnne Zulauf -----Original Message----- From: Sibrel, Ed Sent: Monday, May 11, 2009 4:41 PM To: Zulauf, JoAnne Subject: FW: Correction Notice, Open Bible Church, 656 Daley Street C B low ED SIBREL ED SIBREL Engineering Technician Engineering Technician City of Edmonds City of Edmonds 425.771.0220 425.771.0220 sibrel@ci.edmonds.wa.us Please consider the environment before printing this e-mail -----Original Message----- From: Ronald Johnson \[mailto:ronmaile@verizon.net\] Sent: Friday, May 08, 2009 2:00 PM To: Sibrel, Ed Subject: Re: Correction Notice, Open Bible Church, 656 Daley Street I will address this weekend....Thanks Ron Johnson Architect ----- Original Message ----- From: Sibrel, Ed To: RONMAILE@VERIZON.NET Sent: Friday, May 08, 2009 12:07 PM Subject: Correction Notice, Open Bible Church, 656 Daley Street Good Morning, Please find attached a correction notice regarding an erosion problem on your project at 656 Daley Street. Thanks! ED SIBREL ED SIBREL Engineering Technician Engineering Technician City of Edmonds City of Edmonds 425.771.0220 425.771.0220 sibrel@ci.edmonds.wa.us Please consider the environment before printing this e-mail